Search NASA⌕ Search

DOE OSTI · 1894698

System Study: High-Pressure Safety Injection 1998-2020

Abstract

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear reactors. Demand, run hours, and failure data from calendar years 1998–2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ma, Zhegang. 2022-03-01. System Study: High-Pressure Safety Injection 1998-2020. https://doi.org/10.2172/1894698

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗