Enhancing Lifetime and Reducing Costs for Fish Diversion Netting Structures (Abstract)

Abstract

This effort will focus on technology transfer and commercialization of antifouling coatings with an enthusiastic and engaged industrial team. Environmental requirements and operational demands call for a nontoxic coating/paint to prevent fouling on fish passage guidance netting at hydropower facilities. For example, one netting customer estimated the capital cost for compliance at $\$12$ million to $\$15$ million. This project will build partnerships between PNNL and private companies to optimize, demonstrate, mature, and commercialize a novel PNNL-developed technology that addresses this critical coating need of the hydropower industry. This effort will support modification of existing coatings for application to flexible netting structures. Industrial partners include commercial coating development specialist (Lorama), hydrophobic material manufacturer and paint developer (Dry Surface Technologies), aquatic applications specialists (Prometheus Innovations and River Connectivity Systems), and hydropower netting producer (Pacific Netting Products). Engagement with the U.S. Army Corps of Engineers (USACE) and Bureau of Reclamation (BOR), two hydropower operators, throughout the project will provide expertise and field test sites that will provide crucial proof of real-world performance data (additional details provided in Teaming section). Taylor Shellfish Farms will provide organisms and fouling expertise as well as a perspective of potential broader impacts for the blue economy. Sample netting will demonstrate performance in a range of environments for key hydropower applications. PNNL will work with industrial partners to overcome commercialization barriers as well as resolving any manufacturing or regulatory issues. This Phase 1 effort is focused on technology optimization for application to fish passage guidance netting and technology validation as verified by independent testing (through USACE, BOR, Taylor Shellfish and Prometheus Innovations). Through this effort, SLIC will be demonstrated for netting applications at technology readiness level (TRL) 5. The field test data will allow optimization of SLIC formulation and performance which is key to enabling technology transfer of a mature proven technology to industry and production of a viable commercial product specifically focused for hydropower needs.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Larimer, Curtis J., Addleman, Raymond S.. 2022-05-25. Enhancing Lifetime and Reducing Costs for Fish Diversion Netting Structures (Abstract). https://doi.org/10.2172/1899623

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗