DOE OSTI · 2005154
Preliminary Shielding Analysis for the 1012 400 MeV Linac Building
Abstract
EIC is planning to purchase a 400 MeV turnkey pre-injector linear accelerator (Linac) which will be in a new building at the end of an existing RHIC tunnel at 12 o’clock. The building will contain the Linac Tunnel and associated accelerating structures, Klystron Gallery and waveguides, laser, utility, and control rooms. This report only examines the radiation source term produced by operating the Linac and not supplemental shielding that may be required to shield the Klystrons or solid state amplifiers in the Klystron Gallery from the x rays they emit. Normal Portland concrete blocks are planned to provide shielding between the Linac vault and the occupiable portions of the building per the attached drawing. It is expected that this facility will not be routinely occupied during operations (post commissioning). The shielding design considers EIC’s draft Shielding Policy that states shielding and other controls for areas where access is controlled for radiological purposes will be designed so that an ambient dose of 100 mrem per year to a worker is not likely.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Schaefer, Charles. 2023-09-01. Preliminary Shielding Analysis for the 1012 400 MeV Linac Building. https://doi.org/10.2172/2005154
Cite the original work for its findings. Save a collection to share your selection of sources.