The U.S. Department of Energy Building America research team Consortium for Advanced Residential Buildings (CARB) partnered with Preferred Builders, a previous CARB partner and builder of the Performance House (DOE 2013) and the owners of a 1960s split-level home in Westport, Connecticut, to evaluate and implement a cost-effective solution package that met the requirements of 30% source energy savings compared to the pre-retrofit performance. This home had already been updated aesthetically (kitchen and bathrooms), so the owners wanted the energy-efficiency measures to be as non-disruptive to the interior finishes as possible.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Puttagunta, Sriknath. 2016-04-27. Retrofitting a 1960s Split-Level Cold-Climate Home. https://doi.org/10.25984/2204260. https://searchnasa.com/record/osti%3A2204260/retrofitting-a-1960s-split-level-cold-climate-home

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Search NASA by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

Evaluation of Early Performance Results for Massachusetts Homes in the National Grid Pilot Deep Energy Retrofit Program

In 2009, National Grid started a DER pilot program that offered technical support and financial incentives to qualified Massachusetts homeowners who planned and successfully completed a retrofit that incorporated the performance requirements and goals of the National Grid DER measures package. This DER measures package, developed through collaboration with Building Science Corporation (BSC), includes specific thermal and airtightness goals for the enclosure components as well as health, safety, durability, and indoor air quality requirements. By providing measures that can be included with common renovation activities such as roof replacement, window replacement, re-siding, basement remediation, and remodeling, this DER measures package is expected to have widespread application for existing homes in the New England area. The post-retrofit performance and cost ranges provided by this research project can provide concrete input for homeowners who are considering a DER. Field test data available for air tightness measured using blower door test. House 1 - Address Belchertown, MA 01007, Notes: Energy Savings: 75%, Company: Clark House 2-1 and 2 - Address (1) Brownsberger, MA 02478 and (2) Belmont, MA 02478, Notes Energy Savings: 73%, Company: Brownsberger House 3 - Address Millbury, MA 01527, Notes Energy Savings: 31%, Company: Tweedly House 4 - Address Milton, MA 02186 Notes Energy Savings: 42%, Company: Koh House 5 - Address Quincy, MA 02169, Notes Energy Savings: 57%, Company: Hall House 6-1 and 2 - Address Arlington, MA 02476, Notes Energy Savings: 55%, Company: Venable-Hwang House 7 - Address Newton, MA 02459, Notes Energy Savings: 42%, Company: Lavine House 8-1, 2, and 3 - Address Jamaica Plain, MA 02130, Notes Energy Savings: 43%, Company: Buhs House 9 - Address Northampton, MA 01060, Notes Energy Savings: 49%, Company: Wick House 10 - Address Lancaster, MA 01523, Notes Energy Savings: 40%, Company: Habitat for Humanity of North Central Massachusetts House 11 - Address Brookline, MA 02445, Notes Energy Savings: 27%, Company: Aquiline House 12 - Address Westford, MA 01886, Notes Energy Savings: 30%, Company: Atkins House 13 - Address Gloucester, MA 01930, Notes Energy Savings: 35%, Company: Cunningham

airtightness↗

Evaluating an Exterior Insulation and Finish System for Deep Energy Retrofits

This report provides a case study of a deep energy retrofit using a site-applied exterior insulation and finish system (EIFS). Prefabricated EIFS panels are also discussed as a potential wall insulation retrofit solution. EIFSs are common in new and retrofit commercial construction. Such products typically consist of five layers installed over the top of a water resistive barrier as follows: (1) Adhesive (2) Foam insulation (3) Base coat (4) Reinforcing mesh embedded in the base coat (5) Top or finish coat. They can be applied to new or existing buildings that employ wood or masonry construction, and can utilize an insulation thickness of up to 16 in. However, such systems are rarely used in lowrise residential retrofits. Reasons for this might include a lack of demand for or knowledge of the systems in residential retrofit industry, high cost, and/or lack of suitable distribution channels serving the residential market. While the final appearance of an EIFS installation resembles stucco, it is a distinctly different system. Stucco is a generic cementitious-based material, whereas EIFSs are proprietary synthetic formulations distributed by manufacturers to a network of authorized applicators. An EIFS is composed of polymeric (organic) bonded aggregate and cement reinforced with a glass mesh. Stucco is made of inorganic cement, sand, and lime. In this project, a home was retrofitted using a site-applied 4-in.-thick EIFS. Site-specific details were developed as required for the residential retrofit application. Site work and the costs of the EIFS were documented. The case study home was modeled using version 2 of the National Renewable Energy Laboratory-developed Building Energy Optimization (BEopt) energy and cost analysis software. While a package utilizing the 4-in. EIFS is the optimal retrofit of the options analyzed in terms of annualized energy-related costs, it is higher cost than replacing the siding with midrange vinyl alone. However, compared to high-end vinyl, the EIFS package has a lower annualized energy cost. This held true for both the Islip, New York (climate zone 4) and Boston (climate zone 5) case studies. The report discusses the risks, selection criteria, interactions with other building systems, cost, performance, and other aspects of using an EIFS in a deep energy retrofit. EIFSs do not require special site safety precautions beyond general construction site precautions. Moisture design is important. Trapping moisture between two vapor/air barriers is a risk of all wall systems, including EIFS cladding applications if an interior vapor barrier exists and if there is not adequate ventilation through the drainage plane behind the insulation layer. Face-sealed approaches that rely on exposed sealants do not provide acceptable rain control or durability and are very risky. Generally, fire codes permit EIFSs for most building types and conditions.

airtightness↗

Existing Whole-House Solutions Case Study: National Grid Deep Energy Retrofit Pilot, Massachusetts and Rhode Island

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. Thirty-seven of these projects were comprehensive retrofits while five were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. Building Science Corporation developed a consistent "package" of measures in terms of the performance targeted for major building components. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects, and was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.