Abstract
This report summarizes work performed from July – September 2023, performing an initial evaluation for the LANSCE Proton Storage Ring upgrade option “B.” The studies identified potential pathsforward, performing initial beam dynamics studies, and surveying various technology options different aspects of the upgrade. Taken together, the studies provide an “early look” at the feasibility, challenges and alternative methods for pursuing Option “B,” and give guidance towards more detailed design concept development needed as work progresses. Generally speaking, no major obstacles were identified in pursuing the Option “B” PSR upgrade path in terms of the machine physics or overall system architecture. Several areas of concern have been identified; we note that these primarily center on technology choice and must be addressed regardless of the upgrade path selected, and none of the concerns are considered insurmountable.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Lewellen, John Wesley, Taylor, Charles Edward. 2023-10-25. LAMP-PSR Scoping Studies Report. https://doi.org/10.2172/2315696
Cite the original work for its findings. Save a collection to share your selection of sources.