Achievement in Beam Power Records for the NOvA Target System
Abstract
We began upgrading the NOvA target system for 1-Mega Watt (1-MW) beam operation in 2017. Major challenges included maintaining the quality of neutrino beams with reliable instrumentation, reducing instantaneous beam heating on the target, increasing cooling power to handle the high-power beam, and controlling tritium water production rate. We finally achieved a one-hour beam power record of 1.018 MW in Summer 2024. This milestone demonstrates our capability to operate at 2+ MW beam power for the future Long Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE).