Search NASASearch

DOE OSTI · 3674478

Mechanics and Cooling of the CMS Phase-II Tracker Barrel

Abstract

The CMS upgrade for the High-Luminosity LHC (HL-LHC) era will allow for an incredibly high rate of data collection, to be used in the next generation of precision measurements and searches for beyond the standard model physics. A key element of this upgrade is the full replacement of the silicon strip tracker to enable level-1 triggering on track level primitives, produced by pixel-strip (PS) and strip-strip (2S) modules, tiled together to form the new detector. Mechanically supporting and cooling these modules is not trivial, as material budget in the tracker volume is highly constrained, and as the modules accrue radiation damage they risk becoming entirely non-functional if the silicon sensors are not sufficiently cooled. To address this, each region of the tracker has a bespoke solution for housing and cooling their modules, mostly depending on carbon-fiber and carbon-foam structures, with dual phase CO2 cooling. For the most central part of the tracker, the Flat Barrel with PS modules (Flat TBPS) covers the pseudorapidity range out to $|\eta|=0.4$, and the mechanical structures are manufactured, assembled, and tested entirely by Fermilab and UC Davis. This presentation will describe the intense design and testing requirements for these components, and how they will ensure strong performance of the tracker through the HL-LHC era.

Keep this discovery

BibTeXRIS

Cosby, Christopher [Fermilab]. 2026-09-03. Mechanics and Cooling of the CMS Phase-II Tracker Barrel. https://doi.org/10.2172/3674478

Cite the original work for its findings. Save a collection to share your selection of sources.

Discover connections

Connections use source metadata and explicit phrase matches, not verified experimental comparisons.

KEEP EXPLORING

Related discoveries

Artemis II Mission Performance of the Orion Active Thermal Control System

The Orion spacecraft has recently completed Artemis II, the first crewed mission around the moon in 54 years. This test flight demonstrated vehicle capability as the foundation for all future missions under the Artemis program. As a major system of Orion, the Active Thermal Control System (ATCS) successfully managed crew and vehicle heat loads to provide adequate cooling and thermal comfort for the duration of the Artemis II mission. Thermal control on the Orion vehicle is managed through two redundant cooling loops in the Crew Module (CM) that absorb heat loads from the cabin and Air Revitalization System (ARS) heat exchangers, the Liquid Cooling Garment (LCG) heat exchanger, and the avionics cold plates, and then transfer those heat loads to the Service Module (SM) radiator loops and/or the Phase Change Material (PCM) and ammonia boilers when required through thermal configuration or mission phase. During Artemis II, Orion did not necessitate any supplemental cooling from ammonia boilers until service module separation, allowing the maximum availability of ammonia cooling prior to entry. This presentation will provide an overview of the Orion ATCS major subsystems, highlight the performance during key mission phases, and comment on the applicability of the observed thermal response to future Artemis missions.

Ellie Thurston

Extending mARC II Arc-Jet Test Duration via Design and Implementation of Model System Cooling Sleeve

The mARC II is a 30 kW arc-jet facility at NASA Ames Research Center used to generate high-enthalpy flows for low-cost thermal protection system (TPS) technology development. Sustained operation of downstream instrumentation and material samples is constrained by thermal loading transmitted through the arc-jet test environment, limiting achievable run times and experimental throughput. This work presents the design, integration, and validation of a cooling sleeve implemented on the sweep arm drive motor feedthrough to mitigate thermal accumulation during testing. The addition of the cooling sleeve is a simple, robust upgrade that translates directly into enhanced facility capability by supporting longer run durations, reduced turnaround time, and higher throughput.

numerical simulations

Innovations Driven by Advanced Characterization to Strategize Critical Mineral Production and Beneficial Reuse from Fossil Energy Waste

Critical minerals (CM), such as rare earth elements (REE), cobalt, nickel, and lithium, have important uses in modern electronics and advanced manufacturing, yet are vulnerable to potential supply chain disruptions. Relatively abundant and readily available fossil energy (FE) wastes, such as coal combustion ash, acid mine drainage (AMD) and treatment solids (AMD solids), and Oil and Gas (O&G) drilling wastes (drill cuttings and produced waters) are under consideration as CM feedstocks. The National Energy Technology Laboratory (NETL) has studied CM resources for various FE wastes as part of the U.S. Department of Energy’s mission of bolstering the domestic CM supply, and makes the data available to the public on EDX at sites such as the NEWTS group. Advanced characterization utilizing synchrotron x-ray techniques coupled with laboratory extractions has been performed to identify CM hosting phases in these FE wastes to inform CM recoverability mechanisms. Novel methods to selectively recover CMs while co-producing other valuable byproducts have been developed. Successful examples discussed here include: (1) The identification of REE/Co/Ni/Sc binding and hosting phases in select FE waste (coal combustion ash and AMD solids), resulting in the development of a patented CM step-extraction process, (2) coupled production of functional sorbents from these extraction wastes and for CM recovery. A pilot-scale testing to evaluate the patent’s technical feasibility for extracting REE from coal ash on a barrel scale has been successfully performed. Additionally, (3) evaluation and measurements of brine geochemistry from U.S. O&G produced waters has informed a high Li recovery potential from Marcellus Shale produced water. NETL researchers have been developing tailored pre-treatment processes, an innovative and highly durable lithium sorbent, and geochemical model guided precipitation to accelerate Li production from the Marcellus Shale produced waters. These innovations driven by characterization are integral for maximizing and advancing the potential for CM recovery while offsetting the cost and environmental footprint for FE waste management.

critical mineral processing