Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Abstract

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

Explore related subjects

Keep this discovery

BibTeXRIS

Zhao, Dongwei, Zhou, Zhi, Boff, Daniel, Fernandez, Alisha. 2026-05-01. Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways. https://doi.org/10.1016/j.apenergy.2026.127509

Cite the original work for its findings. Save a collection to share your selection of sources.

Discover connections

Connections use source metadata and explicit phrase matches, not verified experimental comparisons.

KEEP EXPLORING

Related discoveries

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez

Commercial and Industrial Energy Procurement in Nigeria: A Consumer's Guidebook

Across Africa, countries have incorporated a variety of new energy sources into their energy mix to account for increasing demand. In Nigeria, electricity consumption per capita has grown nearly 50% in the past 20 years. To address rising demand for energy in Nigeria, the country has passed several recent policies and regulations aimed at increasing energy generation across the country, improving the country's transmission infrastructure, and ensuring that electricity reliably reaches end users, including commercial and industrial (C&I) customers. This guidebook is designed for C&I customers in Nigeria to use in the consideration of procuring such onsite, captive energy systems to supplement their energy needs. Each section of this guidebook touches on a step of the procurement process and details the relevant stakeholders, processes, and data needed to make decisions during that step.

14 SOLAR ENERGY

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION