Search NASA⌕ Search

SEARCH · Search NASA

Results for “PPA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Advanced PPA Reactor and Process Development

Design and development of a second generation Plasma Pyrolysis Assembly (PPA) reactor is currently underway as part of NASA s Atmosphere Revitalization Resource Recovery effort. By recovering up to 75% of the hydrogen currently lost as methane in the Sabatier reactor effluent, the PPA helps to minimize life support resupply costs for extended duration missions. To date, second generation PPA development has demonstrated significant technology advancements over the first generation device by doubling the methane processing rate while, at the same time, more than halving the required power. One development area of particular interest to NASA system engineers is fouling of the PPA reactor with carbonaceous products. As a mitigation plan, NASA MSFC has explored the feasibility of using an oxidative plasma based upon metabolic CO2 to regenerate the reactor window and gas inlet ports. The results and implications of this testing are addressed along with the advanced PPA reactor development work.

Wheeler, Raymond↗

Advanced Plasma Pyrolysis Assembly (PPA) Reactor and Process Development

Design and development of a second generation Plasma Pyrolysis Assembly (PPA) reactor is currently underway as part of NASA's Atmosphere Revitalization Resource Recovery effort. By recovering up to 75% of the hydrogen currently lost as methane in the Sabatier reactor effluent, the PPA helps to minimize life support resupply costs for extended duration missions. To date, second generation PPA development has demonstrated significant technology advancements over the first generation device by doubling the methane processing rate while, at the same time, more than halving the required power. One development area of particular interest to NASA system engineers is fouling of the PPA reactor with carbonaceous products. As a mitigation plan, NASA MSFC has explored the feasibility of using an oxidative plasma based upon metabolic CO2 to regenerate the reactor window and gas inlet ports. The results and implications of this testing are addressed along with the advanced PPA reactor development.

Wheeler, Richard R., Jr.↗

Effect of dinucleoside pyrophosphates on the oligomerization of activated mononucleotides on Na(+)-montmorillonite: reaction of 5'-phosphoro-4-(dimethylamino)pyridinium [4-(CH3)2NpypA] with A5'ppA

The oligomerization of adenosine 5'-phosphoro-4-(dimethylamino)pyridinium (4-(CH3)2-NpypA) and diadenosine 5',5'-pyrophosphate (A5'ppA) (9:1) on Na(+)-montmorillonite was studied. The oligomers were isolated and analyzed by selective enzymatic hydrolyses and the oligomeric composition and the percent of 3',5'-phosphodiester linkages present in each fraction was determined. The longest oligomers formed (11-mers) are slightly shorter than those produced in the absence of A5'ppA (12-mers). Smaller amounts of A5'ppA are incorporated into the oligomers than in the ImpA/A5'ppA reaction. The regioselectivity of 3',5'-phosphodiester bond formation is comparable to that of the oligomerization of 4-(CH3)2NpypA alone. An explanation of these data is proposed and the possible effect of dinucleoside pyrophosphate on prebiotic RNA formation is discussed.

Non-NASA Center↗

Utility-Scale Solar, 2024 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2024 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Key findings from this year’s report include: -18.5 GWAC of new utility-scale PV capacity came online in 2023, bringing cumulative installed capacity to more than 80.2 GWAC across 47 states. Installed costs continued to fall in 2023. Relative to 2022, capacity-weighted averages decreased by 8% to -$\$1.43$/WAC (or $\$1.08$/WDC). Costs, based on a 7.1 GWAC sample of 76 plants completed in 2023, have fallen by 75% (averaging 10% annually) since 2010. Plant-level capacity factors vary widely, from 6% to 36% (on an AC basis), with a sample median of 24%. -Levelized cost of energy (LCOE) of new 2023 projects increased slightly to $\$46$/MWh prior to the application of tax credits but continued to fall to $\$31$/MWh when accounting for federal incentives. PPA prices have largely followed the decline in solar’s LCOE over time, but newly signed longer-term PPA prices have increased since 2021, to an average of $\$35$/MWh (levelized, in 2023 dollars). -Solar’s average energy and capacity value (i.e., ability to offset costs of other power generation sources) across the U.S. was $\$45$/MWh in 2023. Solar’s average market value was lowest in CAISO ($\$27$/MWh), the market with the greatest solar generation share, and highest in ERCOT ($\$67$/MWh). -Newer solar projects had greater market value in 2023 than their generation costs, yielding $\$1.1$ billion in benefits. Projects built in 2022 delivered on average $\$15$/MWh more market value than their costs in 2023. -Solar’s combined value from wholesale electricity markets, public health and climate damage reduction were greater than generation costs and incentives, yielding $\$13.7$ billion in net benefits in 2023. We estimate U.S. health benefits of $\$24$/MWh and reduced global climate damages of $\$101$/MWh. -Adding battery storage is one way to increase the value of solar. Deployment of 52 new PV+battery hybrid plants set a record with 5.3 GW installed in 2023. Our public data file tracks metadata and PPA prices from more than 100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -Looking ahead, a massive pipeline of at least 1,085 GW of solar capacity dominates the nation’s interconnection queues at the end of 2023. Nearly 571 GW, or 53%, of that total was paired with a battery – in CAISO it was a staggering 98%. Historically only 10% of the requested solar capacity is built. -For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2022 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2022 Edition” provides an overview of key trends in the U.S. market, with a focus on 2021. Highlights of this year’s update include: -A record of nearly 12.5 GWAC of new utility-scale PV capacity came online in 2021, bringing cumulative installed capacity to more than 51.3 GWAC across 44 states. -90% of all new utility-scale PV capacity added in 2021 uses single-axis tracking. -Median installed project costs declined to $\$1.35$/WAC (or $\$1.02$/WDC) in 2021. -Project-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$33$/MWh in 2021 ($\$27$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. In 2021, solar’s average market value (defined in the report to include only energy and capacity value) rose by 55% to $\$47$/MWh and exceeded average wholesale prices in 13 of the 17 balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from 67 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -At the end of 2021, there were at least 674 GW of utility-scale solar power capacity within the interconnection queues across the nation, 284 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2023 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2023 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Highlights of this year’s update include: -10.4 GWAC of new utility-scale PV capacity came online in 2022, bringing cumulative installed capacity to more than 61.7 GWAC across 46 states. -94% of all new utility-scale PV capacity added in 2022 uses single-axis tracking. -Median installed project costs declined to $\$1.32$/WAC (or $\$1.07$/WDC) in 2022. -Plant-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$39$/MWh in 2022 ($\$29$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20-30$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. -In 2022, solar’s average market value (defined in the report to include only energy and capacity value) rose by 40% to $\$71$/MWh and exceeded average wholesale prices in 4 of the 7 ISOs/RTOs and 11 of 18 other balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from ~100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -the end of 2022, there were at least 947 GW of utility-scale solar power capacity within the interconnection queues across the nation, 456 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Characterization of Carbon Particulates in the Exit Flow of a Plasma Pyrolysis Assembly (PPA) Reactor

The ISS presently recovers oxygen from crew respiration via a Carbon Dioxide Reduction Assembly (CRA) that utilizes the Sabatier chemical process to reduce captured carbon dioxide to methane (CH4) and water. In order to recover more of the hydrogen from the methane and increase oxygen recovery, NASA Marshall Space Flight Center (MSFC) is investigating a technology, plasma pyrolysis, to convert the methane to acetylene. The Plasma Pyrolysis Assembly (or PPA), achieves 90% or greater conversion efficiency, but a small amount of solid carbon particulates are generated as a side product and must be filtered before the acetylene is removed and the hydrogen-rich gas stream is recycled back to the CRA. In this work, we present the experimental results of an initial characterization of the carbon particulates in the PPA exit gas stream. We also present several potential options to remove these carbon particulates via carbon traps and filters to minimize resupply mass and required downtime for regeneration.

Methane pyrolysis↗

Utility-Scale Solar, 2021 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2021 Edition” provides an overview of key trends in the U.S. market, with a focus on 2020. Highlights of this year’s update include: A record of nearly 9.6 GWAC of new utility-scale PV capacity came online in 2020, bringing cumulative installed capacity to more than 38.7 GWAC across 43 states. 89% of all new utility-scale PV capacity added in 2020 uses single-axis tracking. Median installed project costs declined to $\$$1.4/WAC (or $\$$1.1/WDC) in 2020. Project-level capacity factors vary widely, from 9% to 36% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. Utility-scale PV’s LCOE fell to $\$$34/MWh in 2020 ($\$$28/MWh if factoring in the federal investment tax credit, or ITC). PPA prices have largely followed the decline in solar’s LCOE over time, but have stagnated more recently. Prices from a sample of recent contracts average just above $\$$20/MWh (levelized). In 2020, solar’s average market value (defined in the report to include only energy and capacity value) exceeded average wholesale prices in 12 of the 17 balancing authorities analyzed (including 4 of the 7 independent system operators across the United States). Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata for more than 150 PV+battery hybrid projects that are already online or that have secured offtake arrangements. At the end of 2020, there were at least 460 GW of utility-scale solar power capacity within the interconnection queues across the nation, 160 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Restoration of NASA's Mobile Analytical Lunar Platform (MALP) as a Prototype Science Exploration Device using a Public, Private, Academic (PPA) Model

A prototype 6-wheeled rover originally developed by NASA JSC for astronaut transport has been modernized and augmented to support concepts for telerobotic exploration of the lunar surface. The ongoing project has employed teams of undergraduate senior engineering students at Texas A&M University (TAMU) to retrofit the Mobile Analytical Lunar Platform (MALP) with wireless technology for telerobotic operations, and to add a robotic arm for regolith sample collection, sieving, storage and transportation.

Telerobotic Rover↗

Oligomerization of uridine phosphorimidazolides on montmorillonite: a model for the prebiotic synthesis of RNA on minerals

The 5'-phosphorimidazolide of uridine reacts on Na(+)-montmorillonite 22A in aqueous solution to give oligomers as long as 7 mers. The maximum chain length increases to 9 mers and the overall oligomer yield increases when 9:1 ImpU, A5' ppA mixtures react under the same conditions. The oligomer yield and maximum chain length decreases with the structure of the added pyrophosphate in the order A5' ppA > A5' ppU > U5' ppU. Structure analysis of individual oligomer fractions was performed by selective enzymatic hydrolyses followed by HPLC analysis of the products. The regioselectivity for 3',5'-bond formation is 80-90% in the 9:1 ImpU, A5' ppA reaction, a percentage comparable to that observed in the 9:1 ImpA, A5' ppA reaction. Oligomerization of ImpU is inhibited by addition of dA5' ppdA, and MeppA. No oligomers containing A5' ppU were products of the 9:1 ImpU,A5' ppA reaction, a finding consistent with the simple addition of the ImpU to the A5' ppA and not the rearrangement of an ImpU-A5' ppA adduct. Concentrations of lysine or arginine which were close to that of the ImpU did not inhibit oligomer formation. Treatment of Na(+)-montmorillonite with 1 M arginine yielded arginine-montmorillonite, an amino acid-mineral adduct which did not catalyze ImpU oligomerization. Neither the 4-9 mers formed in the 9:1 ImpU, A5' ppA reaction nor the 4-9 mers formed by the base hydrolysis of poly(U) served as templates for the formation of oligo(A)s.

Non-NASA Center↗

Modeling Streamflow and Sediment Transport Under Current and Future Climates at the West Valley Site - 20231

Performance Assessment models often require inputs representing specific hydrologic processes such as streamflow and sediment flux. This paper details the development of a process-level hydrologic model and its use in a Probabilistic Performance Assessment (PPA) system-level model for the West Valley Site in western New York. For this PPA model, a watershed model was developed using SWAT (Soil and Water Assessment Tool) and used to evaluate water and sediment fluxes in nearby streams draining the Site. A particular challenge of probabilistic modeling over long periods of time is scaling parameters appropriately so that outcomes are not grossly over- or underestimated. This challenge is especially important when the spatial and temporal scales of process and system level models differ. In this instance, the SWAT watershed model and GoldSim PPA model have similar spatial scales of stream reaches and sub-catchments within a single watershed (approximately hundreds to tens of thousands of square meters, but the temporal scales differ considerably. The SWAT model calculates streamflow and sediment transport rates at the daily scale, while the PPA model requires long-term average values that are applied over hundreds to thousands of year-long periods. As such, distributions of daily climatic parameters such as average precipitation rate, temperature, wind speed, and relative humidity were developed to force a transient SWAT model that captures the dynamic behavior of the watershed in response to daily changes in the weather. Output from the model, which includes stream flow (m{sup 3}/y) and sediment transport rate (Mg/y) is then averaged over a 100-year period as an approximation for the long-term average values which can be applied in GoldSim. A single SWAT model was run 5000 times with varying climatic inputs and deterministic soil, land use, and elevation data, and the range of outputs were compiled into a distribution which can be implemented stochastically into the PPA Model. Additionally, this paper includes a high-level discussion of how changes in future climate affect weather input distributions, and a summary of how those changes in weather affect the outcomes from the SWAT model and the inputs into the PPA model. In this analysis, future climate distributions were developed based on climate research documenting the expected changes to precipitation and temperature in western New York. The 5,000 SWAT simulations were then repeated with these future climate distributions, and the resulting output was implemented into the PPA Model as hydrologic conditions under a future climate. In the current version of the PPA Model, hydrologic parameters change linearly from the 'current climate' conditions to the 'future climate' conditions over a period of 100 years, after which they remain constant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗

C-20A/GIII Precision Autopilot Development in Support of NASA's UAVSAR Program

The NASA Unmanned Aerial Vehicle Synthetic Aperture Radar (UAVSAR) program is developing a Synthetic Aperture Radar (SAR) for ground measurements. A key element for the success of this program is a Platform Precision Autopilot (PPA). An interim vehicle (NASA C-20AJGlll) was selected to carry the radar pod and develop the PPA. The PPA interfaces with the C- 20AIG Ill aircraft by imitating the output of an Instrument Landing System (ILS) approach. This technique retains the safeguards in the aircraft's autopilot. The PPA entered initial flight testing in early 2007. The PPA uses a Kalman filter to generate a real-time position solution with information from the C-20AIGIII and a real-time differential GPS unit designed by JPL. The real-time navigation solution is used to compute commands (Guidance and Control subsystems) which in turn drive two modified ILS testers. The ILS tester units produce modulated RF signals fed to the onboard navigation receiver. These correction signals allow the C-20NGIII autopilot to fly a simulated ILS approach that meets the PPA requirements for UAVSAR applications. The PPA requirement is to make repeat pass flights within a ten meter tube over a 200 kilometer course in conditions of cairn to light turbulence. Flight test results are expected to be available at the time of the NASA Science Technology Conference 2007

Lee, James A.↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing Charge Transport of 2D Perovskite Passivation Agent for Wide-Bandgap Perovskite Solar Cells Beyond 21%

The replacement of a small amount of organic cations with bulkier organic spacer cations in the perovskite precursor solution to form a 2D perovskite passivation agent (2D-PPA) in 3D perovskite thin films has recently become a promising strategy for developing perovskite solar cells (PSCs) with long-term stability and high efficiency. However, the long, bulky organic cations often form a barrier, hindering charge transport. In this study, for the first time, 2D-PPA engineering based on wide-bandgap (~1.68?eV) perovskites are reported. Pentafluorophenethylammonium (F5PEA+) is introduced to partially replace phenylethylammonium (PEA+) as the 2D-PPA, forming a strong noncovalent interaction between the two bulky cations. The charge transport across and within the planes of pure 2D perovskites, based on mixed ammoniums, increases by a factor of five and three compared with that of mono-cation 2D perovskites, respectively. The perovskite films based on mixed-ammonium (F5PEA+-PEA+) 2D-PPA exhibit similar surface morphology and crystal structure, but longer carrier lifetime, lower exciton binding energy, less trap density and higher conductivity, in comparison with those using mono-cation (PEA+) 2D-PPA. The performance of PSCs based on mixed-cation 2D-PPA is enhanced from 19.58% to 21.10% along with improved stability, which is the highest performance for reported wide-bandgap PSCs.

14 SOLAR ENERGY↗