Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resource Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Powered By CADET

The Capacity Expansion Decision Support for Distribution Networks (CADET) is a Python-based library and framework for creating electrical distribution system capacity planning tools for cost-effective, reliable power delivery. It enables the creation of modular, scalable, and extensible distribution capacity planning tools by providing a high-level optimization interface, parameter and options data managers, optimization constraint and objective libraries, generalized nomenclature, a system for tracking and modifying distribution network changes, optimization solution validation, and other capabilities. This webinar will describe 1) the motivation for creating CADET, 2) key designs, and 3) several use cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dispatching Grid-Forming Inverters in Grid-Connected and Islanded Mode

This paper explores the dispatchability of grid-forming (GFM) inverters in grid-connected and islanded mode. GFM inverters usually use droop control to automatically share power with other GFM sources (inverters and synchronous generators) and follow the change in the load demand; however, they can be dispatched like their grid-following (GFL) counterparts to output the target active and reactive power. This will help grid operators better manage their inverter-based resources (IBRs) to improve operation efficiency and reliability; therefore, this paper proposes an innovative concept of dispatching GFM sources (inverters and synchronous generators) to output the target power in both grid-connected and islanded mode by adjusting their droop intercepts. The fundamental principle is that the GFM inverter's active and reactive power is dictated by its frequency and voltage, and thus dispatching the active and reactve power of a GFM inverter can be achieved through dispatching its frequency and voltage. Moreover, the concept distinguishes the dispatch rules for grid-connected and islanded mode. Finally, the concept is validated with an example microgrid system with two GFM inverters, one diesel generator, one GFL inverter, and the load in both grid-connected and islanded mode. This pioneering work results in practical guidance for the development of energy management systems for future electric grids with GFM and GFL inverters.

dispatching↗

Energy Services Interface: Architecture, Requirements, and Agreements

This report continues and extends the development of the Energy Services Interface (ESI) that recently has been led by the U.S. Department of Energy’s Grid Modernization Laboratory Consortium. The ESI is intended to facilitate the coordination of multiple, flexible energy resources that work in tandem to satisfy grid objectives by using performance attributes encoded within an ESI Service Template. The ESI relies on a pair of interfaces, representing the service requestor (the consumer of a service) and a service provider (who manages its resources per the agreed performance attributes) to achieve what is commonly known as a “grid service”. Due to its performance-driven approach, the ESI is hypothesized to be able to satisfy all common grid needs via only six common ESI service types. This report first reviews the status of ESI development, including its fundamental tenets. The report makes three important contributions to ESI development: First, it recognizes the similarity between service level agreements and the contract-like agreements that would be needed between energy service requestors and providers and recommends that ESI service agreements be modeled after the web services agreement specification. Second, whereas prior development efforts had focused on a flat, five-stage lifecycle, this report asserts that the ESI should have three behavioral layers in its architecture—the discovery, agreement, and service layers. Finally, this report offers concrete requirements that should be useful toward the development of the service requestors’ and service providers’ respective communications interfaces.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Dispatching Grid-Forming Inverters in Grid-Connected and Islanded Mode: Preprint

This paper explores the dispatch-ability of grid-forming (GFM) inverters in grid-connected and islanded mode. Grid-forming (GFM) inverters usually use droop control to automatically share power with other GFM sources (inverters and synchronous generator (SG)) and follow the change of the load demand. However, they can be dispatched like their grid-following (GFL) counterparts to output the target active and reactive power. This will help the grid operator better manage their inverter-based resources (IBRs) for improved operation efficiency and reliability. Therefore, this paper proposes an innovative concept of dispatching GFM sources (inverters and SG) to output the target power for both grid-connected and islanded mode by adjusting their droop intercepts. The fundamental principle of doing so is that the GFM inverter's active and reactive power is dictated by its frequency and voltage, thus, dispatching active and reactve power of a GFM inverter can be achieved through dispatching its frequency and voltage. Moreover, the concept distinguishes the dispatch rules for grid-connected and islanded mode. Finally, the concept is validated with an example microgrid system with two GFM inverters, one diesel generator, one grid-following inverter and loads in both grid-connected and islanded mode. This pioneering work results in a practical guidance for power system energy management system (EMS) development to control a future grid with GFM and GFL inverters.

droop control↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Valuing the Future Electric Grid: A Bid-Based Approach

Energy storage resources (ESRs) and other zero marginal cost (ZMC) resources have unique characteristics that are not fully captured in today’s electricity planning and operations modeling tools. Because the modeling assumptions used in these tools are simplified approximations of how operations and investment decisions occur in the real-world, accurately representing cost and operational characteristics are key for determining how these resources impact price formation. Questions such as—Where should we build new transmission? Will a small modular reactor earn enough revenue to participate in the future electric grid? Is retrofitting a coal plant with carbon capture technology economically feasible?—all require accurate electricity prices, which aren’t available from today’s electricity planning and operations modeling tools. As an example, production cost models (PCMs) are heavily utilized tools that determine the cost and reliability of the electric system. However, as PCMs were developed to help thermal generators manage their fuel inventories, production cost modeling is largely based on fuel prices. Because ESRs do not incur fuel costs, they are often modeled as ZMC resources. In reality, ESRs incur opportunity costs as well as technology-specific (degradation) costs that are non-trivial to calculate but are important for price formation. In this research, we identify options to incorporate more realistic opportunity and degradation costs in ESR bidding algorithms. Expanding available bidding assumptions allows energy system modelers to develop more accurate economic valuations for ESRs, leading to more accurate price formation from leading energy system modeling tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Game theoretic modeling and optimization of competition and collaboration in dual channel electronic waste supply chains

The rapid growth of electronic waste (e-waste) presents critical challenges for sustainable resource recovery and environmental protection. This study develops a dual-channel closed-loop supply chain (CLSC) model formulated as a hierarchical Stackelberg game, that integrates dynamic pricing and cost-sharing mechanisms to optimize both economic and environmental outcomes. The model explicitly captures strategic interactions between manufacturer-led and third-party recycling channels, accounting for consumer behavior, regulatory incentives, and market competition. Numerical simulations conducted (implemented over a four-iteration horizon using a commercial optimization solver) show that, relative to the baseline equilibrium, manufacturer profit increases from 11.6 thousand USD to 37.9 thousand USD (+226.8%), total recycled volume rises from 7,848 to 7,942 units (+1.2%), and collector profit nearly doubles under cost-sharing, enabling more equitable profit distribution. Furthermore, scenario-based simulations across Sub-Saharan Africa, high-income economies, and emerging Asian industrial countries reveal that infrastructure quality, policy intensity, and labor costs critically shape recycling efficiency and profit allocation. These findings demonstrate that subsidies alone are insufficient to ensure system efficiency. Instead, coordinated strategies that integrate internal incentive alignment with context-sensitive policy support are required. Overall, this study offers a robust framework for designing resilient, efficient, and regionally adaptable e-waste management systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Low-cost Manufacturing of Semitransparent CdTe PV for Building Integration

Solar has been demonstrated to be a robust renewable energy source, constituting a significant portion of the United States’ renewable energy portfolio. Despite its growth across residential, commercial, and utility sectors over the past decades, it remains a small fraction of the overall energy infrastructure. Challenges persist in fully harnessing solar power to meet the nation's escalating energy demands. Among these challenges lies the hurdle of efficiently distributing large quantities of solar-generated electricity to densely populated regions with the highest energy needs and costs. Traditional utility-scale arrays demand extensive land, a luxury often unavailable in metropolitan areas. Consequently, installations must be situated at a distance, necessitating additional infrastructure for electricity transmission to service areas. While metropolitan landscapes lack sprawling open spaces suitable for conventional utility-scale solar deployment, they offer a different resource: windows. Semitransparent photovoltaic window technology has the potential to not only bolster the grid's energy capacity, but to also provide HVAC and economic advantages to building owners. However, commercial availability of building-integrated photovoltaic windows remains limited. Silicon based photovoltaics currently dominate the solar market but adapting them for use in windows poses a variety of engineering and economic challenges such as relatively low power density, high costs associated with custom manufacturing, and aesthetic considerations. Addressing these challenges, this project explored the use of laser ablation patterning to manufacture cost-effective, high-efficiency, semitransparent Cadmium Telluride photovoltaic modules. Results showcased the potential of this methodology in developing photovoltaic windows and other innovative semitransparent PV applications. The ablation manufacturing technique demonstrated great versatility in achieving different patterns and levels of visible light transmission, and the power loss due to ablation was nearly directly proportional to the amount of material removed. Furthermore, the manufacturing process for Cadmium Telluride modules already has established advantages in material and energy efficiency, and the conversion of a standard submodule to semitransparent essentially requires a single additional process step, ensuring scalability. It is important to note that during this work, Toledo Solar experienced substantial organizational upheaval stemming from a lawsuit with First Solar. An external investigation led the board of directors to remove and replace the previous management team, and several other members of the staff elected to depart as well, including the then acting Principle Investigator on this project. The remaining Toledo Solar team attempted to recover from the disruption and deliver on the remaining tasks, but upon its own review, the Department of Energy ruled the project in default and terminated the contract in December 2023.

14 SOLAR ENERGY↗

Power-Hardware-in-the-Loop Experiments of a Microgrid with a Grid-Forming Battery Inverter

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal operation of multi-plant steam district heating systems for enhanced efficiency and sustainability

Despite their crucial role in supplying heat and power to universities, industries, and healthcare facilities, many steam-based district heating systems rely on outdated control methods. Among these, multi-central plant districts are particularly challenging due to the complexities of coordinating multiple plants, optimizing load distributions, and managing system downtime. In response, new operational strategies are developed to enhance the efficiency and sustainability of steam districts while utilizing existing resources. These strategies include reducing plant operational pressure without compromising the reliable supply to buildings and optimizing load allocation across multiple plants. The load allocation considers boiler part-load efficiency, runtime, network losses, and building pressure set points, and is compared with traditional multi-boiler controls. To support this exploration, new dynamic Modelica models are developed. In addition, methods to reduce modeling complexities are incorporated, enhancing their suitability for practical applications. A holistic district-wide analysis using a real university case study demonstrates a 4.7% fuel savings by lowering boiler operational pressure from 900 kPa to 600 kPa, along with a 13.3% reduction in condensation losses across the distribution network. Furthermore, the load allocation approach results in a 13.1% reduction in fuel consumption during peak winter periods and 15.3% during shoulder periods, with corresponding decreases in carbon emissions and fuel costs. This approach can also save maintenance costs by reducing the boiler runtime by 49.6%. In conclusion, this research underscores the benefits of retrofitting aging steam district heating systems, offering immediate operational improvements by enhancing efficiency, meeting regulatory compliance, and extending infrastructure lifespans while delaying costly overhauls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing a Framework for Valuation of Grid Services

The electric system is rapidly evolving and growing, raising new questions about how to define and value grid services delivered by a diverse set of resources, including customer-owned assets. This report advances a service–parameter–value framework that links what a grid service does to why it matters, and how its benefits are evidenced. We build upon prior efforts (Bender et al. 2021) and extend them to include value categories (reliability, resilience, cost & access, and security) with primary and secondary tiers, service-specific value streams that explain how benefits materialize, and metrics that make valuation traceable and comparable. We apply the framework to the six core grid services defined in (Kolln et al. 2023): Frequency Response, Regulation, Reserves, Energy, Voltage Management, and Blackstart and demonstrate it on three use cases to highlight the adaptability of these value streams. Further, we outline how the framework integrates with existing tools such as asset optimization, hosting capacity and cost-benefit analysis, and propose a path to portable qualifications and consistent stacking rules for use in tariffs and filings. Finally, we identify future pathways for research and application research needs to support standardization and decision-ready comparisons across services, assets, and architectures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RAFT: Reconfigurable Array of High-Efficiency Ducted Turbines for Hydrokinetic Energy Harvesting

Diversifying the energy harvesting portfolio is crucial to achieving the ambitious goal of transitioning to clean energy by 2030. Marine hydrokinetic energy has garnered renewed interest due to its high harvesting potential in the U.S., and the resource's reliability and predictability—remaining relatively constant on a daily basis and available 24/7. However, there are currently few commercial devices capable of harnessing the energy from flowing water. This project aims to bridge that gap by designing and evaluating a novel hydrokinetic turbine concept that can efficiently harvest energy from both rivers and tidal streams. The RAFT (Reconfigurable Array of High-Efficiency Ducted Turbines) concept introduces a duct surrounding the turbine rotor and creates an array of small 5-kW units. The duct serves two primary purposes: (1) it enhances hydrodynamic efficiency by accelerating flow to the rotor, and (2) it functions as a structural component, facilitating the formation of modular arrays that lower costs. This project focuses on demonstrating this concept and validating these benefits through simulations and scaled prototype testing. The project team includes 8 faculty members and over 20 students from 3 universities, organized into three core areas: hydrodynamics, electrical systems, and structural analysis, with additional teams dedicated to system integration, environmental assessment and risk management, and tech-to-market strategy. The team successfully demonstrated the increased hydrodynamic efficiency of a ducted turbine compared to an unducted version using high-fidelity simulations and prototype tests. Moreover, design optimization efforts led to surpassing the SHARKS program's goal of 60% reduction of the levelized cost of energy with a significant margin.

13 HYDRO ENERGY↗

Power-Hardware-in-the-Loop Experiments of a Microgrid With a Grid-Forming Battery Inverter: Preprint

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Critical Minerals and Materials Matchmaker-CM3

This is the Critical Minerals and Materials Matchmaker (CM3) survey form. CM3 is an online information resource created to help connect users across the critical minerals and materials supply chain. The survey is designed to allow organizations to self-identify their critical minerals and materials-aligned activities and interests, and an interactive map that displays those on-going activities in a dynamic way. To include your critical minerals management activity or activities in CM3, please open and fill out the Critical Minerals and Materials Survey. If your organization has many ongoing or planned activities that would be onerous to enter in the form, or if your activities are difficult to geolocate (such as a transport network), please email the team at edxspatial@netl.doe.gov. This initiative is aligned with the approach of DOE’s H2 Matchmaker and Carbon Matchmaker. Read more information on H2 Matchmaker and Carbon Matchmaker. Below are some questions to help understand if you should fill out the CM3 survey: Does your company work with elements such as lithium, cobalt, copper, graphite, nickel, rare earth minerals, or platinum group metals? Does your organization have research and development activities related to critical materials or their supply chains? Does your company currently work in the critical minerals or materials supply chain? Do you have prospective work in critical minerals or materials in the next 5 years? Does your company mine, process, refine or distribute critical minerals or materials? Do you want to network with other facilities or organizations working in the same areas? Are you curious about the critical mineral and material activity in your surrounding area? Are you interested in aligning your potential needs across the supply chain to different geographic areas within the U.S? For more information, please see the CM3 website (https://www.energy.gov/fecm/articles/critical-minerals-materials-matchmaker-cm3) or email our team at edxspatial@netl.doe.gov.

CM3↗

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗