Search NASA⌕ Search

SEARCH · Search NASA

Results for “Expansion Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The explosive transient camera (ETC) - An instrument for identification of gamma ray burst optical counterparts

The ETC is a wide-field (3-steradian) electronic camera array which can detect coincident optical flashes with durations of 0.1 to 100 sec. Each array element is a 20 x 30 deg FOV, cooled CCD detector. An optical transient (possibly associated with a gamma ray burst) as faint as B = +11 (1 sec duration) can be detected with an S/N of not less than 20, and its position determined to an accuracy of + or - 10 arcsec. Candidate events 1000 times fainter than the archived event (plate taken in 1928) reported for the November 19, 1978 gamma ray burst by Schaefer (1981) should be detectable in real time. A prototype camera was tested in April 1982 to establish sky background levels and spurious event rejection schemes; a 1/2-ster test version of the ETC was planned for operation in early 1984; expansion to the full 3-ster complement of 16 detectors at each of two sites was planned for the 1984-1985 period.

Ricker, G. R.↗

Comparison of temporal resolution selection approaches in energy systems models

Capacity expansion models for the power sector are used to project future decisions over the coming decades by simulating investment and operation decisions for the use of electricity. Due to model performance constraints, these models typically do not explicitly simulate every hour within a year, but instead simulate representative time segments (groups of hours). This paper evaluates different approaches for selecting time segments across three methods: sequential, categorical, and clustering, across a wide range of time-segment quantities, for a total of 204 temporal profiles. To measure the performance of each profile's ability to accurately represent data, the root-mean-square-error of each profile's time segments are compared to the data's original hourly data. The temporal alignment across regions is also measured (i.e., how often windy days align across regions). Different spatial resolutions were applied for a subset of the temporal selection methods to investigate the impact spatial resolution has on performance. This paper provides a framework for measuring the value of different temporal selection methods and of adding more granular data to energy system models. Overall, multi-criteria clustering yields the lowest root-mean-square-error across all datasets evaluated and provides a holistic view of the intertwined relationships between renewable generation and electricity demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear Energy in Long-Term System Models: A Multi-Model Perspective

Long-term energy system models–including electric sector capacity expansion models–are widely used tools for informing planning, technology assessment, and policy analysis. Recent decarbonization goals and rapid technological change have increased the need to appropriately represent economic characteristics and technical details of energy system resources, including variable renewable energy, energy storage technologies, carbon-capture-equipped capacity, and nuclear energy. Nuclear power represents about 20% of electricity generation and 50% of carbon-free electricity in the United States as of 2021. However, there are many perspectives on the role of existing and new nuclear in the future U.S. energy system, which is reflected in the broad range of potential contributions reported in the literature. This project aims to understand how issues central to nuclear energy are represented in long-term energy models. Building on earlier collaborations that focused on variable renewable energy and energy storage, this project convenes four modeling teams that use national-scale long-term energy system models from the Electric Power Research Institute, the National Renewable Energy Laboratory, the U.S. Energy Information Administration, and the U.S. Environmental Protection Agency to share methods and data, update models, run coordinated scenarios, and identify research needs. Improving tools can provide more insightful analyses and ensure that methods are more transparent.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

How Today's Hydropower Impacts Tomorrow's Grid: Counterfactual Scenarios Showing Grid Impacts if Hydropower Goes Away

Amidst ongoing discussions about hydropower removals, retirements, and reduced availability due to drought and other environmental considerations, it is important to understand the long-term effects of reduced hydropower resources on the U.S. electric grid. This analysis uses the Regional Energy Deployment System (ReEDS™) grid planning model to compare several representative scenarios of retiring hydropower and pumped storage hydropower (PSH) capacity over time and explore the overall implications on the U.S. grid from present day through 2050. Reduced hydropower capacity and generation is replaced by a mix of both fossil and non-fossil resources, including natural gas, wind, solar, and battery technologies. Additional natural gas usage leads to an increase in cumulative national electric sector carbon dioxide and criteria pollutant operating emissions of less than 1% in many scenarios but up to 4-5.3% in some cases. Total electric sector costs also increase by <1% in many scenarios but up to 3.6% in the most extreme scenarios where nearly all the hydropower and PSH fleet retires, equating to $\$$340 billion in undiscounted costs. National results indicate that absent additional interventions, retiring hydropower and PSH capacity could increase electric sector emissions and direct capital and operating costs. However, more focused analysis is required to evaluate specific asset-level, local, and regional implications, and a broader scope is necessary to weigh these electric sector impacts alongside economic, ecological, water management, and other cross-sectoral effects that could be either negative or positive.

14 SOLAR ENERGY↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide was developed to improve decision-making in the electricity planning process by strengthening dialogue between electricity system planners and stakeholders throughout the process. This document was created for anyone who is first getting exposed to scenario results from power system planning models, or for those who are beginning to interact with power system modelers. It does not assume any experience with power system modeling, or familiarity with electricity planning concepts. This guide can be helpful to a wide range of people, including but not limited to state utility commissioners and commission staff, state energy offices, and intervenors in the planning process. It is targeted to those who are evaluating or reviewing model results presented by a utility, which typically span utility-scale generation and storage (and associated transmission) assets. This guide is designed to provide enough background and guidance that stakeholders can formulate and ask questions to evaluate model results through a deeper understanding of the key assumptions, data, and methods that drive decision outcomes. The ultimate purpose of this work is to increase transparency in the electricity planning process by enabling stakeholders to better engage and evaluate model results. A follow-on guide will provide a deeper dive into emerging topics, which are expected to become more prominent in the electricity planning process, but whose methods and approaches are still being refined.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PC4CAST: A tool for DSN load forecasting and capacity planning

Effectively planning the use and evolution of the Deep Space Network (DSN) is a complex problem involving many parameters. The tool that models many of these complexities, yet requires simple structured inputs and provides concise easy-to-understand metrics to aid in the planning process is discussed. The tool, PC4CAST, is used for both load forecasting (predicting how well planned that DSN resources meet expected demand) and as a decision support tool in the capacity-planning process (determining the relative benefits of capacity expansion options). It is now in use in the TDA Planning Office, has been used in numerous studies, and is also being used by the JPL Multimission Operations System Office (MOSO) as an integral part of Resource Allocation Team activities. Experience using the tool has helped to identify additional requirements that will further improve the planning process, which can be met by future PC4CAST versions.

Loyola, S. J.↗

1.2.2.405 HydroWIRES Topic D1: Capacity Expansion Model (CEM) Enhancements

Long-term grid planning tools have difficulty representing detailed hydropower operating characteristics, which depend not only on technological specifications but also on water management practices and regulations. As a result, the value of hydropower is incompletely characterized, and the potential role of hydropower in the performance and resiliency of the future electric grid is not fully understood. This work will fill that gap by developing new ways to represent hydropower resource, technology, and operational characteristics in electric sector capacity expansion models and implementing them in the open-source version of the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS) model. ReEDS is a well-established national scale grid planning tool used since 2003 by the U.S. Department of Energy and others to explore the evolution of the U.S. electric sector. Improvements will include a comprehensive national resource assessment for pumped storage hydropower and methods for modeling multiple hydropower technology categories characterized by technical, regulatory, and economic characteristics. The project will provide guiding principles and strategies for improving hydropower modeling in capacity expansion models and deliver a first-of-its kind versatile PSH dataset. All data, code, and methods will be publicly available, allowing the industry to better identify the value of hydropower in the future electricity system and make more informed planning decisions.

capacity expansion↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.

25 ENERGY STORAGE↗

Integrated Assessment Modeling of Grid Resilience: GCAM-to-PCM Scoping

Deep decarbonization towards a net-zero emissions future and the associated growth in power demand, renewables, and changes in water availability will require significant evolution in grid planning. Many obstacles threaten the viability of near-term generation capacity build out, including the need for large-scale transmission expansion. Current very-long term planning tools do not adequately model physical representations of economic dispatch and system topology down to inter- and intra-regional transmission and distribution infrastructure. This project attempts to fill that gap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Joint Planning of Electricity Transmission and Hydrogen Transportation Networks

The abundance and uneven distribution of renewable energy might cause congestion and curtailment in electric power systems. Transmission expansions can potentially alleviate transmission congestion and reduce renewable energy curtailment. On the other hand, with the substantial cost reduction of electrolyzer technology and the continuing rise of hydrogen demand, converting surplus renewable energy to hydrogen provides synergistic benefits to power and hydrogen systems, but consequently requires joint planning of the two systems. To this end, we propose a joint planning approach for power transmission and hydrogen transportation networks to coordinately optimize the investment and operation of power and hydrogen infrastructure. In our proposed model, detailed truck routing, pipeline, and hydrogen storage are formulated to quantify the flexibility of hydrogen transportation system. A robust joint planning approach is also proposed to address various uncertainties from renewable energy, electric load, and hydrogen demand. Furthermore, our numerical simulations show that the proposed joint planning model can save the total system cost, reduce renewable energy curtailment, and increase the utilization level of transmission lines.

08 HYDROGEN↗

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Identifying Robust Decarbonization Pathways for the Western U.S. Electric Power System Under Deep Climate Uncertainty

Climate change threatens the resource adequacy of future power systems. Existing research and practice lack frameworks for identifying decarbonization pathways that are robust to climate-related uncertainty. We create such an analytical framework, then use it to assess the robustness of alternative pathways to achieving 60% emissions reductions from 2022 levels by 2040 for the Western U.S. power system. Our framework integrates power system planning and resource adequacy models with 100 climate realizations from a large climate ensemble. Climate realizations drive electricity demand; thermal plant availability; and wind, solar, and hydropower generation. Among five initial decarbonization pathways, all exhibit modest to significant resource adequacy failures under climate realizations in 2040, but certain pathways experience significantly less resource adequacy failures at little additional cost relative to other pathways. By identifying and planning for an extreme climate realization that drives the largest resource adequacy failures across our pathways, we produce a new decarbonization pathway that has no resource adequacy failures under any climate realizations. This new pathway is roughly 5% more expensive than other pathways due to greater capacity investment, and shifts investment from wind to solar and natural gas generators. Our analysis suggests modest increases in investment costs can add significant robustness against climate change in decarbonizing power systems. Our framework can help power system planners adapt to climate change by stress testing future plans to potential climate realizations, and offers a unique bridge between energy system and climate modeling.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing the Key Requirements for 450 GW of Renewable Capacity in India by 2030

In this policy brief, we assess the prerequisites for India to achieve 450 GW of solar and wind cumulative installed capacity by 2030. We examine requirements such as availability of land, new transmission buildout, financing and pace of deployment, as well as the impact on grid reliability and cost of generation. We also examine the impact of policies promoting domestic manufacturing. Deploying 307 GW of solar and 142 GW of wind capacity would use only about 1.25% of land that is categorized as barren or waste, which is equivalent to about 0.22% of the total land area in India. Because of the good solar resource across large swaths of India, the solar energy buildout—and thus the land use—potentially can be spread out. India would need about 280 GW of new interstate transmission capacity by 2030, a little over double the transmission expansion that has already been planned through 2025. However, most of the new transmission buildout is driven by the near doubling of electricity demand between 2020 and 2030. The total investment needed (in generation and storage resources) to realize this target is around USD 26.5 billion annually, which is 20% lower than the annual investment in India’s power sector across all generation resources between 2015 and 2019. We estimate that using domestically manufactured panels instead of imported panels may increase solar PPA prices by about 10%–15% in the medium term, but solar power would still be a cost-effective way to meet growing demand instead of building new fossil fuel-based power plants, because the price of electricity from solar plants has fallen below the variable cost of most existing coal units. To reach this target, India would need to build about 35–40 GW of solar and wind capacity every year in this decade. India’s power sector achieved a pace of capacity addition of 22 GW per year in the previous decade (including thermal and renewable). Policy and regulatory measures would be needed to increase the pace of deployment.

14 SOLAR ENERGY↗

DOE LeRC photovoltaic systems test facility

The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility.

Cull, R. C.↗

NASA's Space Life Sciences Training Program

The Space Life Sciences Training Program (SLSTP) is an intensive, six-week training program held every summer since 1985 at the Kennedy Space Center (KSC). A major goal of the SLSTP is to develop a cadre of qualified scientists and engineers to support future space life sciences and engineering challenges. Hand-picked, undergraduate college students participate in lectures, laboratory sessions, facility tours, and special projects: including work on actual Space Shuttle flight experiments and baseline data collection. At NASA Headquarters (HQ), the SLSTP is jointly sponsored by the Life Sciences Division and the Office of Equal Opportunity Programs: it has been very successful in attracting minority students and women to the fields of space science and engineering. In honor of the International Space Year (ISY), 17 international students participated in this summer's program. An SLSTP Symposium was held in Washington D. C., just prior to the World Space Congress. The Symposium attracted over 150 SLSTP graduates for a day of scientific discussions and briefings concerning educational and employment opportunities within NASA and the aerospace community. Future plans for the SLSTP include expansion to the Johnson Space Center in 1995.

Coulter, G.↗

Single Step to Orbit; a First Step in a Cooperative Space Exploration Initiative

At the end of the Cold War, disarmament planners included a recommendation to ease reduction of the U.S. and Russian aerospace industries by creating cooperative scientific pursuits. The idea was not new, having earlier been suggested by Eisenhower and Khrushchev to reduce the pressure of the "Military Industrial Complex" by undertaking joint space exploration. The Space Exploration Initiative (SEI) proposed at the end of the Cold War by President Bush and Premier Gorbachev was another attempt to ease the disarmament process by giving the bloated war industries something better to do. The engineering talent and the space rockets could be used for peaceful pursuits, notably for going back to the Moon and then on to Mars with human exploration and settlement. At the beginning of this process in 1992 staff of the Stanford Center for International Cooperation in Space attended the International Space University in Canada, met with Russian participants and invited a Russian team to work with us on a joint Stanford-Russian Mars Exploration Study. A CIA student and Airforce and Navy students just happened to join the Stanford course the next year and all students were aware that the leader of the four Russian engineers was well versed in Russian security. But, as long as they did their homework, they were welcome to participate with other students in defining the Mars mission and the three engineers they sent were excellent. At the end of this study we were invited to give a briefing to Dr. Edward Teller at Stanford's Hoover Institution of War and Peace. We were also encouraged to hold a press conference on Capitol Hill to introduce the study to the world. At a pre-conference briefing at the Space Council, we were asked to please remind the press that President Bush had asked for a cooperative exploration proposal not a U.S. alone initiative. The Stanford-Russian study used Russia's Energia launchers, priced at $300 Million each. The mission totaled out to $71.5 Billion, to send a six-person crew to establish a Mars base and return. It was an on going international venture with plans for new crews, base expansion, and extended exploration at every two year opportunity. The $71.5 Billion international approach contrasted with NASA's own 90-day U.S. - alone study that proposed a package topping $500 Billion by some admissions. NASA's approach was also challenged by an internal D.O.E. proposal at much lower cost, described to the Mars Society last year by Lowell Wood and, of course, by Bob Zubrin's "Mars Direct" proposal.

Lusignan, Bruce↗