Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

On the association of magnetic clouds with disappearing filaments

Evidence is presented that an interplanetary magnetic cloud preceding an interaction region, observed at earth on January 24, 1974, is associated with the eruptive filament of disparition brusque (DB) near central meridian on January 18. The DB was also associated with a long-decay soft X ray transient and a long-duration gradual-rise-and-fall radio burst. To assess whether magnetic clouds are generally associated with DBs, results from statistical testing of the relation of 33 magnetic clouds (and 33 control samples without magnetic clouds) to disappearing filaments near central meridian (approximately less than 45 deg central meridian distance) are presented. The hypothesis that magnetic cloud are the 1-AU counterparts of either eruptive filaments or the coronal mass ejections which probably accompany them is supported. The major result is that disappearing filaments occur more frequently on the days when magnetic clouds are launched than on control days, a result obtained with greater than 99 pct confidence. There is a suggestion that clouds following shocks, probably launched at times of solar flares, are not as strongly associated with disappearing filaments as are clouds launched less violently.

Wilson, R. M.↗

Sensitivity of the Asteroid Redirect Robotic Mission (ARRM) to Launch Date and Asteroid Stay Time

National Aeronautics and Space Administrations (NASAs) proposed Asteroid Redirect Mission (ARM) is being designed to robotically capture and then redirect an asteroidal boulder mass into a stable orbit in the vicinity of the moon, where astronauts would be able to visit and study it. The current reference trajectory for the robotic portion, ARRM, assumes a launch on a Delta IV H in the end of the calendar year 2021, with a return for astronaut operations in cislunar space in 2026. The current baseline design allocates 245 days of stay time at the asteroid for operations and boulder collection. This paper outlines analysis completed by the ARRM mission design team to understand the sensitivity of the reference trajectory to launch date and asteroid stay time.

trajectory analysis↗

Ground cloud hydrogen chloride measurements from three Titan launches at the Kennedy Space Center during 1978 and 1979

Total hydrogen chloride and gaseous hydrogen chloride concentrations were measured in the exhaust cloud produced at three Titan 3 launches at the Kennedy Space Center in March 1978, December 1978, and November 1979 to determine the degree of hydrogen chloride partitioning in a solid rocket exhaust cloud between gaseous hydrogen chloride and hydrochloric acid aerosol as a function of ambient relative humidity. Moderately low relative humidity conditions were present during a daytime launch on Mar 25, 1978, and high relative humidity conditions were present during a nighttime launch on December 13, 1978. Gaseous hydrogen chloride concentrations and meteorological data, as a function of time after launch, are presented. Hydrogen chloride is present in both the gaseous and aerosol phase in the exhaust cloud. Total HCl concentrations ranged from 18 parts per million by volume (ppm) several minutes after launch down to 1 ppm after the cloud stabilization period, depending on the meteorological conditions. Gaseous HCl concentrations ranged from 2 to 3 ppm several minutes after launch to less than 1 ppm after cloud stabilization. These measured concentrations indicated significant HCl aerosol formation.

Seabacher, D. I.↗

The 2015-2016 El Nino and the Response of the Carbon Cycle: Findings from NASA's OCO-2 Mission

The El Nino Southern Oscillation (ENSO) is the most important mode of tropical climate variability on interannual to decadal time scales. Correlations between atmospheric CO2 growth rate and ENSO activity are relatively well known but the magnitude of this correlation, the contribution from tropical marine vs. terrestrial flux components, and the causal mechanisms, are poorly constrained in space and time. The launch of NASA's Orbiting Carbon Observatory-2 (OCO-2) mission in July 2014 was rather timely given the development of strong ENSO conditions over the tropical Pacific Ocean in 2015-2016. In this presentation, we will discuss how the high-density observations from OCO-2 provided us with a novel dataset to resolve the linkages between El Nino and atmospheric CO2. Along with information from in situ observations of ÎpCO2 from NOAA's Tropical Atmosphere Ocean (TAO) project and atmospheric CO2 from the Scripps CO2 Program, and other remote-sensing missions, we are able to piece together the time dependent response of atmospheric CO2 concentrations over the Tropics. Our findings confirm the hypothesis from studies following the 1997-1998 El Nino event that an early reduction in CO2 outgassing from the tropical Pacific Ocean is later reversed by enhanced net CO2 emissions from the terrestrial biosphere. This implies that a component of the interannual variability (IAV) in the growth rate of atmospheric CO2, which has typically been used to constrain the climate sensitivity of tropical land carbon fluxes, is strongly influenced and modified by ocean fluxes during the early phase of the ENSO event. Our analyses shed further light on the understanding of the marine vs. terrestrial partitioning of tropical carbon fluxes during El Nino events, their relative contributions to the global atmospheric CO2 growth rate, and provide clues about the sensitivity of the carbon cycle to climate forcing on interannual time scales.

CO2↗

The 2015-2016 El Nino and the Response of the Carbon Cycle: Findings from NASA's OCO-2 Mission

The El Nino Southern Oscillation (ENSO) is the most important mode of tropical climate variability on interannual to decadal time scales. Correlations between atmospheric CO2 growth rate and ENSO activity are relatively well known but the magnitude of this correlation, the contribution from tropical marine vs. terrestrial flux components, and the causal mechanisms, are poorly constrained in space and time. The launch of NASA's Orbiting Carbon Observatory-2 (OCO-2) mission in July 2014 was rather timely given the development of strong ENSO conditions over the tropical Pacific Ocean in 2015-2016. In this presentation, we will discuss how the high-density observations from OCO-2 provided us with a novel dataset to resolve the linkages between El Nino and atmospheric CO2. Along with information from in situ observations of CO2 from NOAA's Tropical Atmosphere Ocean (TAO) project and atmospheric CO2 from the Scripps CO2 Program, and other remote-sensing missions, we are able to piece together the time dependent response of atmospheric CO2 concentrations over the Tropics. Our findings confirm the hypothesis from studies following the 1997-1998 El Nino event that an early reduction in CO2 outgassing from the tropical Pacific Ocean is later reversed by enhanced net CO2 emissions from the terrestrial biosphere. This implies that a component of the interannual variability (IAV) in the growth rate of atmospheric CO2, which has typically been used to constrain the climate sensitivity of tropical land carbon fluxes, is strongly influenced and modified by ocean fluxes during the early phase of the ENSO event. Our analyses shed further light on the understanding of the marine vs. terrestrial partitioning of tropical carbon fluxes during El Nino events, their relative contributions to the global atmospheric CO2 growth rate, and provide clues about the sensitivity of the carbon cycle to climate forcing on interannual time scales.

OCO-2↗

Free Flyer Total and Spectral Solar Irradiance Sensor (TSIS) and Climate Services Mission

NOAA's planned Total and Spectral Solar Irradiance Sensor (TSIS) mission will fly along with the NOAA user service payloads Advanced Data Collection System (ADCS) and Search and Rescue Satellite Aided Tracking (SARSAT). In ' order to guarantee continuity in the 33-year solar irradiance climate data record, TSIS must be launched in time to overlap with current on-orbit solar irradiance instruments. Currently TSIS is moving towards a launch rcadin~ss date of January 2015. TSIS provides for continuation of the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM) ,currently onboard NASA's Solar Radiation and Climate Experiment (SORCE) platform, launched in January 2003. The difficulty of ensuring continuity has increased due to the launch failure of NASA's Glory mission with its improved TIM. Achieving the needed overlap must now rely on extending SORCE. and maintaining the TSIS schedule. TSIS is one component of a NASA-NOAA joint program (JPSS) planned to transition certain climate observations to operational mode. We summarize issues of continuity, improvements being made to the TIM and 81M sensors, and plans to provide for traceability of total and spectral irradiance measurements to ground-based cryogenic standards.

Cahalan, R.↗

NASA's Rodent Research Project: Validation of Flight Hardware, Operations and Science Capabilities for Conducting Long Duration Experiments in Space

Research using rodents is an essential tool for advancing biomedical research on Earth and in space. Rodent Research (RR)-1 was conducted to validate flight hardware, operations, and science capabilities that were developed at the NASA Ames Research Center. Twenty C57BL/6J adult female mice were launched on Sept 21, 2014 in a Dragon Capsule (SpaceX-4), then transferred to the ISS for a total time of 21-22 days (10 commercial mice) or 37 (10 validation mice). Tissues collected on-orbit were either rapidly frozen or preserved in RNA later at less than or equal to -80 C (n=2/group) until their return to Earth. Remaining carcasses were rapidly frozen for dissection post-flight. The three controls groups at Kennedy Space Center consisted of: Basal mice euthanized at the time of launch, Vivarium controls, housed in standard cages, and Ground Controls (GC), housed in flight hardware within an environmental chamber. FLT mice appeared more physically active on-orbit than GC, and behavior analysis are in progress. Upon return to Earth, there were no differences in body weights between FLT and GC at the end of the 37 days in space. RNA was of high quality (RIN greater than 8.5). Liver enzyme activity levels of FLT mice and all control mice were similar in magnitude to those of the samples that were optimally processed in the laboratory. Liver samples collected from the intact frozen FLT carcasses had RNA RIN of 7.27 +/- 0.52, which was lower than that of the samples processed on-orbit, but similar to those obtained from the control group intact carcasses. Nonetheless, the RNA samples from the intact carcasses were acceptable for the most demanding transcriptomic analyses. Adrenal glands, thymus and spleen (organs associated with stress response) showed no significant difference in weights between FLT and GC. Enzymatic activity was also not significantly different. Over 3,000 tissues collected from the four groups of mice have become available for the Biospecimen Sharing Program. Together, these validation flight findings demonstrate the capability to support long-duration RR on the ISS to achieve both basic science and biomedical objectives.

rodents↗

NASA's Rodent Research Project: Validation of Capabilities for Conducting Long Duration Experiments in Space

Research using rodents is an essential tool for advancing biomedical research on Earth and in space. Prior rodent experiments on the Shuttle were limited by the short flight duration. The International Space Station (ISS) provides a new platform for conducting rodent experiments under long duration conditions. Rodent Research (RR)-1 was conducted to validate flight hardware, operations, and science capabilities that were developed at the NASA Ames Research Center. Twenty C57BL6J adult female mice were launched on Sept 21, 2014 in a Dragon Capsule (SpaceX-4), then transferred to the ISS for a total time of 21-22 days (10 commercial mice) or 37 days (10 validation mice). Tissues collected on-orbit were either rapidly frozen or preserved in RNAlater at -80C (n2group) until their return to Earth. Remaining carcasses on-orbit were rapidly frozen for dissection post-flight. The three controls groups at Kennedy Space Center consisted of: Basal mice euthanized at the time of launch, Vivarium controls housed in standard cages, and Ground Controls (GC) housed in flight hardware within an environmental chamber. Upon return to Earth, there were no differences in body weights between Flight (FLT) and GC at the end of the 37 days in space. Liver enzyme activity levels of FLT mice and all control mice were similar in magnitude to those of the samples that were processed under optimal conditions in the laboratory. Liver samples dissected on-orbit yielded high quality RNA (RIN8.99+-0.59, n7). Liver samples dissected post-flight from the intact, frozen FLT carcasses yielded RIN of 7.27 +- 0.52 (n6). Additionally, wet weights of various tissues were measured. Adrenal glands and spleen showed no significant differences in FLT compared to GC although thymus and livers weights were significantly greater in FLT compared to GC. Over 3,000 tissue aliquots collected post-flight from the four groups of mice were deposited into the Ames Life Science Data Archives for future Biospecimen Sharing Program. Together, the RR validation flight successfully demonstrates the capability to support long-duration experimentation on the ISS to achieve both basic science and biomedical objectives.

spaceflight↗

Potential health risks from postulated accidents involving the Pu-238 RTG on the Ulysses solar exploration mission

Potential radiation impacts from launch of the Ulysses solar exploration experiment were evaluated using eight postulated accident scenarios. Lifetime individual dose estimates rarely exceeded 1 mrem. Most of the potential health effects would come from inhalation exposures immediately after an accident, rather than from ingestion of contaminated food or water, or from inhalation of resuspended plutonium from contaminated ground. For local Florida accidents (that is, during the first minute after launch), an average source term accident was estimated to cause a total added cancer risk of up to 0.2 deaths. For accidents at later time after launch, a worldwide cancer risk of up to three cases was calculated (with a four in a million probability). Upper bound estimates were calculated to be about 10 times higher.

Goldman, Marvin↗

Manned Lunar Missions: An Exercise in Propulsion Trades and Sensitivities

A recent study performed for the In-Space Propulsion Technology Office at the Marshall Space Flight Center investigated the effects of using different propellant types on the different stages required to perform a manned lunar mission. The original study included investigations into propellant type, propellant storage technology options and sensitivities to specific impulse variations for a lunar orbit rendezvous mission. The initial mission characteristics were based on previous work led by Langley Research Center. Outlined in this paper are the results of that study and the work that followed. A lunar direct return architecture was added to the analysis. Since both architectures required assembly of the various propulsive stages in low Earth orbit and multiple launches to deliver those stages, investigations of launch sequence and scheduling sensitivities were also included. Results show that lunar direct return architectures require more mass to complete missions when compared to lunar orbit rendezvous missions. Within the given architectures, trends in the results tended to be very similar with the architectures indicating very little sensitivity to launch sequence and specific impulse variations and indicating more sensitivity to the propellant choice made for each stage and the time between launches. Even though this study investigates a small subset of the possible lunar architecture trade space, it does begin to outline some of the issues that must be investigated and the characteristics of the mission and the mission elements that are of most importance to a full architecture assessment.

Percy, Thomas K.↗

Managing Complexity - Developing the Node Control Software For The International Space Station

On December 4th, 1998 at 3:36 AM STS-88 (the space shuttle Endeavor) was launched with the "Node 1 Unity Module" in its payload bay. After working on the Space Station program for a very long time, that launch was one of the most beautiful sights I had ever seen! As the Shuttle proceeded to rendezvous with the Russian American module know as Zarya, I returned to Houston quickly to start monitoring the activation of the software I had spent the last 3 years working on. The FGB module (also known as "Zarya"), was grappled by the shuttle robotic arm, and connected to the Unity module. Crewmembers then hooked up the power and data connections between Zarya and Unity. On December 7th, 1998 at 9:49 PM CST the Node Control Software was activated. On December 15th, 1998, the Node-l/Zarya "cornerstone" of the International Space Station was left on-orbit. The Node Control Software (NCS) is the first software flown by NASA for the International Space Station (ISS). The ISS Program is considered the most complex international engineering effort ever undertaken. At last count some 18 countries are active partners in this global venture. NCS has performed all of its intended functions on orbit, over 200 miles above us. I'll be describing how we built the NCS software.

Wood, Donald B.↗

BRAVO economic study of LANDSAT follow-on

The LANDSAT Follow-On satellite consists of two major systems: the instrument module and the Multi-Mission Modular Spacecraft (MMS). The instrument module contains the thematic mapper and the five-band multispectral scanner instruments. The instrument module also includes the solar array, the tracking and data relay satellite (TDRS) antenna, and the wideband data module. The MMS contains the modularized and standardized power, propulsion, attitude control, and command and data handling subsystems. The Shuttle will be supporting the LANDSAT Follow-On system. The LANDSAT Follow-On Project plans two Delta 3910 launches. The first is scheduled for 1981; the second Delta launch will occur as needed to keep one satellite operational on orbit. The second satellite will be ready six months after the first. It could be launched any time after that. Shuttle support of the system could begin in early 1983 but would be scheduled to start after the second Delta launch.

Pritchard, E. I.↗

Heavy Lift Launch Vehicles for 1995 and Beyond

A Heavy Lift Launch Vehicle (HLLV) designed to deliver 300,000 lb to a 540 n mi circular polar orbit may be required to meet national needs for 1995 and beyond. The vehicle described herein can accommodate payload envelopes up to 50 ft diameter by 200 ft in length. Design requirements include reusability for the more expensive components such as avionics and propulsion systems, rapid launch turnaround time, minimum hardware inventory, stage and component flexibility and commonality, and low operational costs. All ascent propulsion systems utilize liquid propellants, and overall launch vehicle stack height is minimized while maintaining a reasonable vehicle diameter. The ascent propulsion systems are based on the development of a new liquid oxygen/hydrocarbon booster engine and liquid oxygen/liquid hydrogen upper stage engine derived from today's SSME technology. Wherever possible, propulsion and avionics systems are contained in reusable propulsion/avionics modules that are recovered after each launch.

Toelle, R.↗

Insitu Lunar Launch & Landing Pad Construction w/ Regolith and Thermoset Polymers

This CIF project is an extension of materials developed under a previous NASA Innovative Advanced Concepts (NIAC) project titled “Regolith Derived Heat Shield for Planetary Body Entry and Descent Systems with In-Situ Fabrication” by M. Hogue et al. (2012). Launch and landing pads are necessary to mitigate risks to lander/ascent vehicles, surface assets, and orbital assets from rocket plume ejected regolith. At this time, all launching and landing on the lunar surface will be on unprepared surface sites. Though this has been a successful approach for Apollo and other uncrewed missions, significant risks exist for the Artemis Program due to the increased thrust of the vehicles, presence of co-located assets, and potential surface level requirements for tall vehicles. This project developed a thermoset polymer–regolith composite material for use as a launch and landing pad. Test articles were prepared at 20% and 11% polymer mass percent (wt%) and tested under hot fire conditions that simulated large vehicle lunar launch/landing conditions. A minimum polymer wt% of 9% was achieved and both samples successfully mitigated regolith ejecta from plume effects. A concept for emplacing launch/landing pads was successfully tested in laboratory environments using a screw and barrel approach to mixing, conveying and depositing materials. It is recommended that materials and systems be developed to TRL 6 for a small-scale lunar demonstration of emplacement of a launch/landing pad via a Commercial Lunar Payload Services (CLPS) mission to support the Artemis Program.

Nathan Gelino↗

Experimental Visualizations of a Generic Launch Vehicle Flow Field: Time-Resolved Shadowgraph and Infrared Imaging

Time-Resolved shadowgraph and infrared (IR) imaging were performed to investigate off-body and on-body flow features of a generic, 'hammer-head' launch vehicle geometry previously tested by Coe and Nute (1962). The measurements discussed here were one part of a large range of wind tunnel test techniques that included steady-state pressure sensitive paint (PSP), dynamic PSP, unsteady surface pressures, and unsteady force measurements. Image data was captured over a Mach number range of 0.6 less than or equal to M less than or equal to 1.2 at a Reynolds number of 3 million per foot. Both shadowgraph and IR imagery were captured in conjunction with unsteady pressures and forces and correlated with IRIG-B timing. High-speed shadowgraph imagery was used to identify wake structure and reattachment behind the payload fairing of the vehicle. Various data processing strategies were employed and ultimately these results correlated well with the location and magnitude of unsteady surface pressure measurements. Two research grade IR cameras were positioned to image boundary layer transition at the vehicle nose and flow reattachment behind the payload fairing. The poor emissivity of the model surface treatment (fast PSP) proved to be challenging for the infrared measurement. Reference image subtraction and contrast limited adaptive histogram equalization (CLAHE) were used to analyze this dataset. Ultimately turbulent boundary layer transition was observed and located forward of the trip dot line at the model sphere-cone junction. Flow reattachment location was identified behind the payload fairing in both steady and unsteady thermal data. As demonstrated in this effort, recent advances in high-speed and thermal imaging technology have modernized classical techniques providing a new viewpoint for the modern researcher

Shadowgraph↗

Launch Vehicle Selection and the Implementation of the Soil Moisture Active Passive Mission

Soil Moisture Active Passive (SMAP) is a NASA-developed Earth science satellite currently mapping the soil moisture content and freeze/thaw state of Earth's land mass from a 685km, near-polar, sun-synchronous orbit. It was launched on January 31, 2015 from Vandenberg AFB upon a Delta II 7320 launch vehicle. Due to external considerations, SMAP's launch vehicle selection remained an open item until Project Critical Design Review (CDR). Thus, certain key aspects of the spacecraft design had to accommodate a diverse range of candidate launch vehicle environments, performance envelopes, interfaces and operational scenarios. Engineering challenges stemmed from two distinct scenarios: decisions that had to be made prior to launch vehicle selection to accommodate all possible outcomes, and post-selection changes constrained by schedule and the existing spacecraft configuration. The effects of the timing of launch vehicle selection reached virtually every aspect of the Observatory's design and development. Physical environments, mass allocations, material selections, propulsion system performance, dynamic response, launch phase and mission planning, overall size and configuration, and of course all interfaces to the launch vehicle were heavily dependent on this outcome. This paper will discuss the resolution of these technical challenges.

Sherman, Sarah↗

Apollo/Saturn 5 space vehicle countdown. Volume 2: Turnaround from scrub

The procedures required to prepare a space vehicle for subsequent launch attempt after cancelling lift-off activities are presented. The cancellation must occur after the start of cryogenic loading, but prior to initiation of ignition sequences. The sequence of operations necessary to return the space vehicle to a predetermined configuration at which time the launch count can be resumed or rescheduled for following launch opportunities is developed. The considerations and constraints that are the basis for the scrub/turnaround times are described.

Source record↗