Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

LCLS Gun Solenoid Design Considerations

The LCLS photocathode rf gun requires a solenoid immediately downstream for proper emittance compensation. Such a gun and solenoid have been operational at the SSRL Gun Test Facility (GTF) for over eight years. Based on magnetic measurements and operational experience with the GTF gun solenoid multiple modifications are suggested for the LCLS gun solenoid. The modifications include adding dipole and quadrupole correctors inside the solenoid, increasing the bore to accommodate the correctors, decreasing the mirror plate thickness to allow the solenoid to move closer to the cathode, cutouts in the mirror plate to allow greater optical clearance with grazing incidence cathode illumination, utilizing pancake coil mirror images to compensate the first and second integrals of the transverse fields and incorporating a bipolar power supply to allow for proper magnet standardization and quick polarity changes. This paper describes all these modifications plus the magnetic measurements and operational experience leading to the suggested modifications.

43 PARTICLE ACCELERATORS↗

Solutions for management of defective fuel assemblies - 15318

Defective fuel management is a major challenge for nuclear operators when the time comes for finding a long-term solution for their used (or spent) fuel assemblies. This question of defective fuel management can be raised in several cases: - For optimizing the remaining operating costs of shutdown reactors, the spent fuel pools must be emptied as soon as possible; a solution needs therefore to be found for evacuating all the spent fuel assemblies, defective fuel assemblies and in particular defective fuel rods included; - Some utilities are today facing a saturation of their reactor spent fuel pool; evacuating the defective fuel assemblies and extracted defective fuel rods allows optimizing the space in the pool. Whereas the solutions for managing intact used fuel assemblies are well-known, a specific technical solution must be implemented for managing the defective spent fuel assemblies as well. The purpose of this paper is to describe the existing solutions for the management of all types of defective fuel assemblies. Interim Dry Storage Solution Interim dry storage of defective spent fuel assemblies is being implemented for decades in the USA. Specific operations are performed for preparing the defective fuel assemblies for interim dry storage and they are then stored with intact used fuel assemblies in the dry storage cask. The advantage of such a solution is its short-term cost effectiveness. The paper presents the existing dry interim storage solutions for defective used fuel rods, the way they are implemented, the associated operational experience. Long-term Dry Storage Solution A long-term dry storage solution for defective fuel assemblies is being developed, compliant with direct disposal requirements. The solution is based on the encapsulation of each defective fuel rod into a fuel rod capsule and an associated specific dry storage licensing approach: this is the best available technology regarding long term storage safety requirements. The paper presents this unique capsule technology, the transport and storage casks that can be used for transportation of defective fuel rods to the storage facility, and the associated transport licensing approach currently used in Europe. Treatment Solution. The most definitive way to get rid of defective fuel assemblies is their treatment (or reprocessing) in a treatment plant. There is then no need to assess the behaviour of these specific used fuel assemblies as for an interim storage facility or a final repository. The advantage of such a solution is its sustainable approach. The paper presents the existing transport and treatment solutions, the way they are implemented, the associated operational experience. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electromagnetic-Tracked Biopsy under Ultrasound Guidance: Preliminary Results

Purpose: This study was designed to evaluate the accuracy and safety of electromagnetic needle tracking for sonographically guided percutaneous liver biopsies. Methods: We performed 23 consecutive ultrasound-guided liver biopsies for liver nodules with an electromagnetic tracking of the needle. A sensor placed at the tip of a sterile stylet (18G) inserted in a coaxial guiding trocar (16G) used for biopsy was localized in real time relative to the ultrasound imaging plane, thanks to an electromagnetic transmitter and two sensors on the ultrasound probe. This allows for electronic display of the needle tip location and the future needle path overlaid on the real-time ultrasound image. Distance between needle tip position and its electronic display, number of needle punctures, number of needle pull backs for redirection, technical success (needle positioned in the target), diagnostic success (correct histopathology result), procedure time, and complication were evaluated according to lesion sizes, depth and location, operator experience, and 'in-plane' or 'out-of-plane' needle approach. Results: Electronic display was always within 2 mm from the real position of the needle tip. The technical success rate was 100%. A single needle puncture without repuncture was used in all patients. Pull backs were necessary in six patients (26%) to obtain correct needle placement. The overall diagnostic success rate was 91%. The overall true-positive, true-negative, false-negative, and failure rates of the biopsy were 100% (19/19) 100% (2/2), 0% (0/23), and 9% (2/23). The median total procedure time from the skin puncture to the needle in the target was 30 sec (from 5-60 s). Lesion depth and localizations, operator experience, in-plane or out-of-plane approach did not affect significantly the technical, diagnostic success, or procedure time. Even when the tumor size decreased, the procedure time did not increase. Conclusions: Electromagnetic-tracked biopsy is accurate to determine needle tip position and allows fast and accurate needle placement in targeted liver nodules.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Simulation of argon response and light detection in the DarkSide-50 dual phase TPC

A Geant4-based Monte Carlo package named G4DS has been developed to simulate the response of DarkSide-50, an experiment operating since 2013 at LNGS, designed to detect WIMP interactions in liquid argon. In the process of WIMP searches, DarkSide-50 has achieved two fundamental milestones: the rejection of electron recoil background with a power of ~10 7 , using the pulse shape discrimination technique, and the measurement of the residual 39 Ar contamination in underground argon, ~3 orders of magnitude lower with respect to atmospheric argon. These results rely on the accurate simulation of the detector response to the liquid argon scintillation, its ionization, and electron-ion recombination processes. This work provides a complete overview of the DarkSide Monte Carlo and of its performance, with a particular focus on PARIS, the custom-made liquid argon response model.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Measurement of the B{sup +} Production Cross Section in pp Collisions at {radical}(s)=7 TeV

Measurements of the total and differential cross sections d{sigma}/dp{sub T}{sup B} and d{sigma}/dy{sup B} for B{sup +} mesons produced in pp collisions at {radical}(s)=7 TeV are presented. The data correspond to an integrated luminosity of 5.8 pb{sup -1} collected by the CMS experiment operating at the LHC. The exclusive decay B{sup +}{yields}J/{psi}K{sup +}, with J/{psi}{yields}{mu}{sup +}{mu}{sup -}, is used to detect B{sup +} mesons and to measure the production cross section as a function of p{sub T}{sup B} and y{sup B}. The total cross section for p{sub T}{sup B}>5 GeV and |y{sup B}|<2.4 is measured to be 28.1{+-}2.4{+-}2.0{+-}3.1 {mu}b, where the first uncertainty is statistical, the second is systematic, and the last is from the luminosity measurement.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

APS upgrade: Commissioning the world’s first light source based on swap-out injection

The Advanced Photon Source (APS) has recently completed a major upgrade, replacing its 25-year-old storage ring with a cutting-edge hybrid seven-bend achromat lattice enhanced by six additional reverse bends. The new design achieves a natural emittance of 42 pm-rad, enabling the production of X-rays up to 500 times brighter than those generated by the original APS. A key innovation of the upgrade is the implementation of a swap-out injection scheme, which replaces entire depleted bunches instead of performing traditional top-up injection. This approach enables on-axis injection to accommodate for the reduced dynamic aperture resulting from strong focusing. This paper outlines the commissioning process, shares initial operating experience with swap-out injection, and presents performance data for new systems such as the bunch-lengthening cavity.

Sajaev, Vadim [Argonne, PHY]↗

APPLICATION OF OBJECTIVES-DRIVEN ASSURANCE CASES TO SYSTEM DEVELOPMENT IN AN EVOLVING ACQUISITION MODEL

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

99 GENERAL AND MISCELLANEOUS↗

Application of Objectives-Driven Assurance Cases to System Development in an Evolving Acquisition Model

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

99 GENERAL AND MISCELLANEOUS↗

Mark-18A Target Material Recovery Program: Initial Hot Startup

The Savannah River National Laboratory (SRNL) has been tasked by the National Nuclear Security Administration to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The Mk-18A targets were manufactured with Pu-242 then irradiated under high neutron flux in K-Reactor at the SRS from 1968 to 1978. The sixty-five Mk-18A targets are currently stored in the SRS L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The original targets were manufactured with varying quantities of Pu-242, ranging from 5.2 grams to 121.5 grams. Taking a graded approach to process start up, the lowest loaded target (FT-80-03) was selected as the first target to be received and processed at SRNL. As operational experience and knowledge is gained from processing targets, higher loaded targets will be selected for processing to increase the quantities of valuable isotopes recovered. Due to dose concerns, the receipt and processing of the Mk-18A targets is performed in the SRNL Shielded Cells Facility. The targets are stored in a double J-can confinement in the L-Area Basin. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets are loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 length) are then processed one at a time through the following processes: caustic dissolution and filtration, acidic dissolution and filtration, elutable Reillex anion exchange, diglycolamide (DGA) resin extraction, and DGA calcination. This processing results in two product streams. The first is an aqueous plutonium solution which is removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide product containing the Am and Cm as well as other lanthanide fission products which is removed from the shielded cells using a bagless transfer system. Both materials are packaged for shipment to Oak Ridge National Laboratory (ORNL). This paper will discuss the operating experience, lessons learned, and results from initial process hot startup.

Armstrong, Christopher [Savannah River National La↗

High Temperature Electrolysis Pressurized Experiment Design, Operation, and Results

A new facility has been developed at the Idaho National Laboratory for pressurized testing of solid oxide electrolysis stacks. Pressurized operation is envisioned for large-scale hydrogen production plants, yielding higher overall efficiencies when the hydrogen product is to be delivered at elevated pressure for tank storage or pipelines. Pressurized operation also supports higher mass flow rates of the process gases with smaller components. The test stand can accommodate planar cells with dimensions up to 8.5 cm x 8.5 cm and stacks of up to 25 cells. It is also suitable for testing other cell and stack geometries including tubular cells. The pressure boundary for these tests is a water-cooled spool-piece pressure vessel designed for operation up to 5 MPa. Pressurized operation of a ten-cell internally manifolded solid oxide electrolysis stack has been successfully demonstrated up 1.5 MPa. The stack is internally manifolded and operates in cross-flow with an inverted-U flow pattern. Feed-throughs for gas inlets/outlets, power, and instrumentation are all located in the bottom flange. The entire spool piece, with the exception of the bottom flange, can be lifted to allow access to the internal furnace and test fixture. Lifting is accomplished with a motorized threaded drive mechanism attached to a rigid structural frame. Stack mechanical compression is accomplished using springs that are located inside of the pressure boundary, but outside of the hot zone. Initial stack heatup and performance characterization occurs at ambient pressure followed by lowering and sealing of the pressure vessel and subsequent pressurization. Pressure equalization between the anode and cathode sides of the cells and the stack surroundings is ensured by combining all of the process gases downstream of the stack. Steady pressure is maintained by means of a backpressure regulator and a digital pressure controller. A full description of the pressurized test apparatus is provided in this report. Results of initial testing showed the expected increase in open-cell voltage associated with elevated pressure. However, stack performance in terms of area-specific resistance was enhanced at elevated pressure due to better gas diffusion through the porous electrodes of the cells. Some issues such as cracked cells and seals were encountered during testing. Full resolution of these issues will require additional testing to identify the optimum test configurations and protocols.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Light Scalars at FASER

FASER, the ForwArd Search ExpeRiment, is a currently operating experiment at the Large Hadron Collider (LHC) that can detect light long-lived particles produced in the forward region of the LHC interacting point. In this paper, we study the prospect of detecting light CP-even and CP-odd scalars at FASER and FASER 2. Considering a model-independent framework describing the most general interactions between a CP-even or CP-odd scalar and SM particles using the notation of coupling modifiers in the effective Lagrangian, we develop the general formalism for the scalar production and decay. We then analyze the FASER and FASER 2 reaches of light scalars in the large tan β region of the Type-I two Higgs double model as a case study, in which light scalars with relatively long lifetime could be accommodated. In the two benchmark scenarios we considered, the light (pseudo)scalar decay length varies in (10 –8 , 10 5 ) meters. Both FASER and FASER 2 can probe a large part of the parameter space in the large tan β region up to 10 7 , extending beyond the constraints of the other existing experiments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Lepton-flavor-violating ALP signals with TeV-scale muon beams

We explore the feasibility of using TeV-energy muons to probe lepton-flavor-violating (LFV) processes mediated by an axion-like particle (ALP) a with mass O(10 GeV). We focus on µτ LFV interactions and assume that the ALP is coupled to a dark state χ, which can be either less or more massive than a. Such a setup is demonstrated to be consistent with χ being a candidate for dark matter, in the experimentally relevant regime of parameters. We consider the currently operating NA64-µ experiment and proposed FASERν2 detector as both the target and the detector for the process µA → τA a, where A is the target nucleus. We also show that a possible future active muon fixed-target experiment operating at a 3 TeV muon collider or in its preparatory phase can provide an impressive reach for the LFV process considered, with future FASERν2 data providing a pilot study towards that goal. The implications of the muon anomalous magnetic moment (g - 2) µ measurements for the underlying model, in case of a positive signal, are also examined, and a sample UV completion is outlined.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Avoiding compressor surge during emergency shutdown hybridturbine systems

A new emergency shutdown procedure for a direct-fired fuel cell turbine hybrid power system was evaluated using a hardware-based simulation of an integrated gasifier/fuel cell/turbine hybrid cycle (IGFC), implemented through the Hybrid Performance (Hyper) project at the National Energy Technology Laboratory, U.S. Department of Energy (NETL). The Hyper facility is designed to explore dynamic operation of hybrid systems and quantitatively characterize such transient behavior. It is possible to model, test, and evaluate the effects of different parameters on the design and operation of a gasifier/fuel cell/gas turbine hybrid system and provide a means of quantifying risk mitigation strategies. An open-loop system analysis regarding the dynamic effect of bleed air, cold air bypass, and load bank is presented in order to evaluate the combination of these three main actuators during emergency shutdown. In the previous Hybrid control system architecture, catastrophic compressor failures were observed when the fuel and load bank were cut off during emergency shutdown strategy. Improvements were achieved using a nonlinear fuel valve ramp down when the load bank was not operating. Experiments in load bank operation show compressor surge and stall after emergency shutdown activation. The difficulties in finding an optimal compressor and cathode mass flow for mitigation of surge and stall using these actuators are illustrated.

20 FOSSIL-FUELED POWER PLANTS↗

The Promethian Exchange: Bringing Expert Tools and Diagnostic Experience to Operations

Operators need a variety of diagnostic tools in order to make their lives easier. Sometimes it becomes necessary to add or improve the suite of diagnostics in order to do new or different jobs, or to improve upon existing methods in one's accelerator. This talk will attempt to outline various methods by which specific diagnostic improvements have been achieved in the CEBAF accelerator at Jefferson lab and abstract methods of process which can be applied to any lab/setting.

McCaughan, Michael↗

Cigeo, The French Geological Disposal Facility Project: Preliminary Design (APS) Phase - 16038

The Cigeo project has been in the works for 25 years. Numerous studies have been conducted, increasingly associated with the Meuse/Haute-Marne site, with further specific research thanks to direct access to the Callovo-Oxfordian clay formation from the underground laboratory of Bure-Saudron. These studies and research initially aimed to demonstrate the feasibility of the repository. They also helped gain a high level of understanding of phenomena to support design studies and demonstrate safety. Transition to the industrial phase began with the development of a plan for delivering waste to the facility for disposal. The plan introduced sequencing for the various types of waste to be disposed of, and was optimised to determine the size of inspection, transfer and handling facilities. In describing the life of the repository and therefore the vision for its operation, it has become obvious that our generation should not impose choices on future generations. We must provide them with reference technical solutions, with the financial resources to implement them. It is also our duty to begin the construction and initial operating phases. However, because the facility will operate over several generations, we must leave a degree of flexibility so that they may reassess the options that we define and adopt their own solutions, as necessary. They will also benefit from operational experience gathered as facility operations develop. This is the context in which the preliminary design phase is being finalised in preparation for the detailed design phase, with the aim of gradual commissioning during the latter part of the next decade. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Loss-of-Offsite-Power Events 1987-2018

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2018. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. No significant trends in critical operation LOOP frequencies over the most recent 10-year period are identified. Adverse trends in LOOP durations are identified for switchyard-centered and grid-related LOOPs, as well as overall LOOPs during critical operation and overall LOOPs during shutdown operation. Both grid-related and weather-related LOOP events are found to show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1987–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗