Search NASA⌕ Search

SEARCH · Search NASA

Results for “Refilling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

FY23 Report on Water NSTF Testing at Two-Phase Conditions: Off-normal Scenarios

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report details the experimental activities and upgrades performed during the program’s fifth year of water-based operation. The theme of this year of testing was examining off-normal scenarios. In practice, that meant examining scenarios with blockages or other design basis conditions. From a maintenance and capability standpoint that meant assessing valving options for implementing blockages, assessing drain and refill capabilities, and ensuring in all cases that operators could safely, efficiently, and repeatably bring the facility to an off-normal condition and return it to the normal operating state. In one notable case, no solution existed, nor was a solution commercially available, that met the facility needs for implementing blockages within the two-phase region of the chimney. A valve and feedthrough were custom-designed for NSTF to operate submerged in saturated water while being safely actuated from outside the tank. The fifth year of testing included eight matrix tests consisting of 162 hours of active heating, 9,735 kWh of electrical heating, with seven tests classified as Accepted per NQA-1 and one as Trending. All matrix tests were performed at two-phase flow conditions. The power parametric series from previous years was extended to include another scenario with a decay load equivalent to 1.75 MWt, full scale, further resolving the system flow oscillation response as a function of input power. A depletion test was performed to extend previous work and examine the system’s approach to stagnation and geysering that were not previously observed. This test began at an initial inventory level of 50%, prototypic power of 2.1 MWt, and employed an accelerated drain of 0.75 gpm plus boiloff until stagnation conditions were achieved and multiple geysering events were recorded. Further exploring the geysering phenomenon was a separate effects test examining static boiling in the risers and chimney. This static boiling test was performed at 48 kWe, a higher power than testing in the previous year, and included enhancements to the drain system to remove inventory in a better-controlled and more reliable manner. Two tests were performed, at prototypic conditions of 1.4 MWt and 2.4 MWt, respectively, examining the system response to throttled conditions in the singlephase region of the piping. A ball valve immediately before he riser inlet header was increasingly throttled, progressing the system through a repeatable pattern of two-phase oscillations and stable regimes before ultimately inducing stagnation and geysering. Concluding the year, two tests were performed at baseline conditions of 70% initial inventory level and 2.1 MWt of prototypic decay heat to examine both repeatability and the response to throttling within the two-phase region, at the inventory tank inlet using the custom valve mentioned above. The first such test repeated transient operating conditions and revealed significant sensitivity t

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reduced LCoE CSP Through Utilizing Process Gas Lubricated Bearings in Oil-Free Drivetrains

The GE Research team proposed to advance the TRL level of process lubricated gas bearings from TRL3 based on the DE-EE0007109 program to TRL5 addressing a critical risk item that radial gas bearings can provide satisfactory rotordynamic performance in supporting a representative rotor for sCO2 Power Cycles. The ability to apply process lubricated gas bearings can provide cost savings with reduction of the associated lube oil systems and an efficiency benefit worth 2% efficiency for the turbomachinery configuration first presented in DE-EE005804. The process lubricated gas bearings are enablers for advanced hermetically sealed configurations that have the potential for significant advancement in sCO2 Power Cycles for CSP applications including the 2% efficiency increase referred to above in addition to OPEX savings with no need to refill the CO2 valued at 60k USD/yr and cost reductions of 50 USD/kWe all leading to a potential 0.95¢/kWh reduction positively impacting CSP goals.

14 SOLAR ENERGY↗

Cold Trap Replacement Project Report

This report documents the replacement of the Mechanisms Engineering Test Loop (METL) cold trap. The work involved preparation of the facility to replace the cold trap, removal of the existing welded cold trap from the sodium purification circuit, installation of a new replacement cold trap, completion of associated welds and examinations, restoration of instrumentation and heaters, and controlled return of the cold trap circuit to service. The replacement represented a significant maintenance evolution because the cold trap is an integral welded component of the sodium system. As a result, the work required coordinated control of sodium chemistry, deliberate formation of freeze plugs, inert gas management, precision cutting and welding, and a staged reheating and refill sequence. The activity was executed using procedural controls intended to protect personnel, preserve system cleanliness, and maintain the integrity of the sodium boundary throughout the work. This report provides a narrative summary of the milestone, including the purpose of the work, the pre-job system condition, the major field activities performed, observations made during execution, and the resulting post-work condition of the METL cold trap circuit.

42 ENGINEERING↗

FORGE: Summer Internship Experience

The presentation summarizes my summer internship experience with the Fluids Group at Fermilab. During the internship, I learned about the maintenance and operation of water pumps and other equipment that support important facility systems. I worked alongside fluids technicians and gained hands-on experience with maintaining machinery, installing pipes, refilling water, cleaning RF cavities, and observing new water-pump construction for PIP-II. My projects included repairing an air dryer, learning how heat exchangers cool low-conductivity water, and cleaning the copper cooling rings used in RF cavities. Overall, this experience helped me better understand the work processes of technicians and the importance of practical technical knowledge for engineers.

Uribe, Anthony [Unlisted, US, IL]↗

Performance and Total Cost of Ownership of a Fuel Cell Hybrid Mining Truck

The main objective of this work was to investigate the potential of hydrogen and fuel cells replacing diesel and internal combustion engines in the ultraclass haul trucks deployed in the mining sector. Performance, range, durability, and cost are the main criteria considered for comparing the two fuels and engine options. Fuel cell system (FCS) performance is characterized in terms of heat rejection, efficiency, and fuel consumption for a hybrid platform equivalent to a 3500 hp diesel engine operating on a representative open pit mining duty cycle. A hybrid platform was chosen because the heat rejection, with a constrained radiator frontal area, limits the maximum fuel cell-rated power by about 50% compared to that of the diesel truck. The hybrid powertrain was 81–88% more efficient than the diesel powertrain on the truck duty cycle. A liquid hydrogen storage system is required for an equal range or time between refilling, but the packaging remains a challenge. Fuel cell and battery durability were evaluated for their performance degradation and lifetime. Achieving a fuel cell lifetime comparable to the time between major overhauls for diesel trucks necessitates the oversizing of the membrane-active area, catalyst overloading, and voltage clipping. For an equal lifetime, the battery must be oversized to control its depth of discharge and charge/discharge rates. A total cost of ownership (TCO) analysis considering the initial capital expenditures, as well as the lifetime cost of fuel, operation, and maintenance, indicates that fuel cells and hydrogen can compete with diesel. A breakeven fuel cost for TCO parity is obtained if H2 is available at USD 5.79–6.85/kg vs. diesel at USD 3.25/gal and the FCS-specific cost is USD 323/kW e relative to USD 250/kW for a diesel genset. Volume manufacturing is required for FCS cost reduction. High volume is possible through the standardization, modularity, and proliferation of class 8 long-haul truck systems across different heavy-duty applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of GloFAS-Seasonal Forecasts for Cascade Reservoir Impoundment Operation in the Upper Yangtze River

Standard impoundment operation rules (SIOR) are pre-defined guidelines for refilling reservoirs before the end of the wet season. The advancement and availability of the seasonal flow forecasts provide the opportunity for reservoir operators to use flexible and early impoundment operation rules (EIOR). These flexible impoundment rules can significantly improve water conservation, particularly during dry years. In this study, we investigate the potential application of seasonal streamflow forecasts for employing EIOR in the upper Yangtze River basin. We first define thresholds to determine the streamflow condition in September, which is an important period for decision-making in the basin, and then select the most suitable impoundment operation rules accordingly. The thresholds are used in a simulation–optimization model to evaluate different scenarios for EIOR and SIOR by multiple objectives. We measure the skill of the GloFAS-Seasonal forecast, an operational global seasonal river flow forecasting system, to predict streamflow condition according to the selected thresholds. The results show that: (1) the 20th and 30th percentiles of the historical September flow are suitable thresholds for evaluating the possibility of employing EIOR; (2) compared to climatological forecasts, GloFAS-Seasonal forecasts are skillful for predicting the streamflow condition according to the selected 20th and 30th percentile thresholds; and (3) during dry years, EIOR could improve the fullness storage rate by 5.63% and the annual average hydropower generation by 4.02%, without increasing the risk of flooding. GloFAS-Seasonal forecasts and early reservoir impoundment have the potential to enhance hydropower generation and water utilization.

54 ENVIRONMENTAL SCIENCES↗

EVENTS LEADING UP TO THE 2015 JUNE OUTBURST OF V404 CYG

On 2015 June 15 the burst alert telescope (BAT) on board Swift detected an X-ray outburst from the black hole (BH) transient V404 Cyg. We monitored V404 Cyg for the last 10 years with the 2-m Faulkes Telescope North in three optical bands (V, R, and i′). We found that, one week prior to this outburst, the optical flux was 0.1–0.3 mag brighter than the quiescent orbital modulation, implying an optical precursor to the X-ray outburst. There is also a hint of a gradual optical decay (years) followed by a rise lasting two months prior to the outburst. We fortuitously obtained an optical spectrum of V404 Cyg 13 hr before the BAT trigger. This too was brighter than quiescence, and showed spectral lines typical of an accretion disk, with characteristic absorption features of the donor being much weaker. No He ii emission was detected, which would have been expected had the X-ray flux been substantially brightening. This, combined with the presence of intense Hα emission, about seven times the quiescent level, suggests that the disk entered the hot, outburst state before the X-ray outburst began. We propose that the outburst is produced by a viscous–thermal instability triggered close to the inner edge of a truncated disk. An X-ray delay of a week is consistent with the time needed to refill the inner region and hence move the inner edge of the disk inwards, allowing matter to reach the central BH, finally turning on the X-ray emission.

79 ASTRONOMY AND ASTROPHYSICS↗

4-gc parametric amplifier for satellite communication ground station receiver

This paper describes the design and performance of a 4-gc parametric amplifier which meets the stringent requirements of a satellite ground station receiver. It consists of two cascaded stages of similar design: the first of these is operated at liquid nitrogen temperature and the second at room temperature. One 23-gc pump source is used for both amplifier stages. The combination of the two amplifier stages provides 38-db over-all gain, 45°K over-all system input noise temperature, 60-mc bandwidth, 0.1-db short-term gain stability and 0.3-db long-term gain stability. A carefully designed cryogenic system maintains the amplifier refrigerated with only infrequent refilling of the dewar, i.e., once every 10 days.

MASER↗

New shield for gamma-ray spectrometry

Gamma-ray shield that can be evacuated, refilled with a clean gas, and pressurized for exclusion of airborne radioactive contaminants effectively lowers background noise. Under working conditions, repeated evacuation and filling procedures have not adversely affected the sensitivity and resolution of the crystal detector.

Brar, S. S.↗

Shuttle operations, maintenance, and safety.

Review of a systematic search for practical solutions in the areas of space shuttle cryogenics, flight operations, ground operations, and safety. The insulation of the main-propulsion hydrogen tanks for both booster and orbiter to prevent water condensation is considered, as well as the insulation of the orbiter's orbital cryogen tanks for ground storage. Two approaches to the feeding of cryogens are outlined - namely, an approach depending on a periodic axial force to settle propellants and refill the basket, and a method of continuous feed through a capillary network adjacent to the walls throughout the tank, the latter method being independent of vehicle thrust. The development of reliable cryogen components is discussed, and the results of studies of launch-abort problems, shuttle approach and landing techniques, and the tolerance of ?deconditioned' crew and passengers to shuttle reentry g-loads are cited.

Beddingfield, S. T.↗

Improved multiple-target sputtering equipment

Sputtering chamber has been developed with multiple target. Several film layers can be deposited without repeated evacuation and refilling. Contamination through exposure to air is eliminated.

Shima, R.↗

Evaluation of the electrochemical O2 concentrator as an O2 compressor

A program was successfully completed to analytically and experimentally evaluate the feasibility of using an electrochemical oxygen (O2) concentrator as an O2 compressor. The electrochemical O2 compressor (EOC) compresses 345 kN/sq m (50 psia) O2 generated on board the space vehicle by the water electrolysis subsystem (WES) in a single stage to 20,700 kN/sq m (3000 psia) to refill spent extravehicular equipment O2 bottles and to eliminate the need for high pressure O2 storage. The single cell EOC designed, fabricated, and used for the feasibility testing is capable of being tested at O2 pressures up to 41,400 kN/sq m (6000 psia). A ground support test facility to test the EOC cell was designed, fabricated, and used for the EOC feasibility testing. A product assurance program was established, implemented, and maintained which emphasized safety and materials compatibility associated with high pressure O2 operation. A membrane development program was conducted to develop a membrane for EOC application. Data obtained using a commercially available membrane were used to guide the development of the membranes fabricated specifically for an EOC. A total of 15 membranes were fabricated.

Marshall, R. D.↗

Developments in low-gravity cryogenic propellant acquisition and thermal control systems

Development programs are described for two low-gravity cryogenic propellant acquisition systems: a full-screen liner system, and a refillable start-tank. First, based on experimental LH2 screen flow data, the fluid-dynamic characteristics of an integrated screen/thermodynamic vent system were analyzed for a design compared to 17.5 cu fg supercritical life-support systems, and for a Tug orbital LH2/LQ2 resupply system. Second, the analysis, design, fabrication, and test of a 10 cu ft, annular-screen start-tank with a wall-mounted thermodynamic vent was performed. The test program demonstrated that the system expelled LH2 against 1-g and performed properly over a range of conditions.

Cady, E. C.↗

Fluctuations in O2 stores and gas exchange with passive changes in posture

The purpose of the present study is to determine the effects of changes in posture on oxygen transfer at the mouth and pulmonary capillary membrane and to observe concomitant subtle changes in ventilation under specified assumptions. Breath-by-breath calculations are carried out with a box-balloon spirometer and mass spectrometer. Measurements are made before, during, and after passive tilt to 60 deg and on return to recumbency after 10 min erect. It is found that from supine to upright oxygen stores in the lung increases rapidly and oxygen stores in the blood drops slowly, creating a net deficit in oxygen transfer at the mouth of 130 ml in 10 min. Changes in oxygen stores in the blood result from shifts in blood volume and flow more than from changes in cardiac output. Refilling of oxygen stores in the blood is found to cause transient hypoxia with substantial hyperpnea.

Loeppky, J. A.↗

Repair of fused silica platens

Refill/leveling technique, which consists of spreading slurry refill material to affected areas and then sanding until surfaces are flat, extends service life of platen up to 50 production cycles between downtime.

Heisman, R. M.↗

A local diffusion process associated with the sweeping of energetic particles by Io

A local, turbulent diffusion process which may rapidly refill the partial cavity of energetic particles created by Io's passage through a flux tube is discussed. A model is developed of Io's sweeping action on energetic particles in which a wake is formed behind the flux tube threading Io. It is shown to be possible that this wake contains an excess of positive charge, thereby creating an electric field. The particle drift produced by this field, coupled with the density gradient of energetic protons, can generate an instability. It is this instability that is responsible for the turbulent diffusion process. The sweeping of energetic particles is also discussed in relation to particle energy and pitch angle distribution.

Huba, J. D.↗

Solid-state growth of Si to produce planar surfaces

Paralleling the sophisticated control of Si and GaAs growth from fluid media, we demonstrate control of Si growth using a solid growth medium. Faceted dissolution pits were first produced in a Si substrate using standard photolithographic techniques and Al metallization. Si was then evaporated onto the cold structure, depositing as amorphous material. Upon heating, the amorphous Si migrated through the solid Al and grew rapidly in the faceted pits, typically refilling them flush with the surrounding substrate. Evidence that the rapid growth occurs only while the amorphous Si is dissolving into the Al is presented.

Boatright, R. L.↗

Deviation from a Maxwellian velocity distribution in regions of interstellar molecular hydrogen

The deviation from a Maxwellian velocity distribution caused by excitation of the J = 2 rotational level of parahydrogen (followed by radiative decay) in a molecular hydrogen gas is investigated. It is noted that inelastic collisions deplete the high-velocity tail of the distribution, while elastic collisions tend to refill it; the resulting steady-state distribution has a small depletion in the tail which slightly reduces the cooling rate of the gas. The elastic-collision transport is approximated by a continuous process, a simplified expression is obtained for the inelastic-collision operator, and the Boltzmann equation is then solved analytically. A correction to the inelastic-collision rate is evaluated, and it is found that the relative magnitude of the effect of tail depletion on the inelastic-collision rate is strongly temperature-dependent. The critical molecular density above which the J = 2 level deexcites by superelastic collisions is shown to be a weak function of temperature.

Gould, R. J.↗