Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk acceptability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Bio-project “derisking” through development of systematic methodologies and frameworks for risk assessment

One of the primary hindrances to producing a viable, sustainable domestic biomass industry for renewable biofuels, bio-products and bio-power is the lack of understanding and quantification of the risks associated with both the biomass supply chain and preprocessing and conversion technologies. Currently a consistent method for assessing, comparing, and quantifying risks in biomass supply chains does not exist, creating a major investment barrier to bioenergy projects in the U.S. The lack of a standardized approach has resulted in bioenergy stakeholders independently using inconsistent approaches and evaluation criteria, leading to unreliable and incomparable assessments of risks and financing barriers to bio-project development. Along with the challenges of inconsistent risk assessment for supply chain risk, technology specific risks based on variability in biomass properties are not fully understood and can pose significant unforeseen challenges for bioenergy projects. In many cases these properties have not yet been identified and the impacts on the proposed technology and products unquantified. This is particularly challenging for emerging preprocessing and conversion technologies. Without a firm understanding of the preprocessing/conversion technology-specific critical properties, the risk of a proposed bio-project cannot be fully evaluated. To address inconsistent risk evaluation in the biomass supply chain supporting project financing, a Biomass Supply Chain Risk Standards (BSCRS) framework was developed. The BSCRS framework includes a comprehensive list of known and perceived risks (Risk Indicators) to the supply chain developed through 100’s of interviews with bioenergy industry experts spanning from feedstock growers and suppliers to representatives from the financial sector. These risks have been organized into a manageable hierarchy of Risk Categories and Risk Factors that can be practically assessed. This BSCRS framework also provides mitigation strategies for multiple Risk Indicators from best available industry practices and research findings. Additionally, a risk quantification methodology for each Risk Factor, Risk Category, and the bio-project as a whole was developed to enable capital markets to assess feedstock risk more efficiently and more accurately. Multiple case studies representing existing bio-projects have been used to evaluate and verify the BSCRS framework and scoring methodology. To address technological risk along with the supply chain risk captured in the developed BSCRS framework, this work also focuses on development of a systematic criticality assessment tool using well-accepted, quantitative risk analysis methods to evaluate bioenergy feedstock critical properties impacting system unit operations. The proposed Failure Mode and Effect Analysis (FMEA) approach uses a team of subject area experts (SAEs) for each targeted unit operation within a system. Collectively, the team will develop and use a quantitative scoring system to assess the material attributes, process parameters, and quality attributes for key unit operations that have already been identified. The FMEA process generates Risk Priority Numbers (RPNs) for the various failures and predominant causes for each material/process unit/product combination resulting in a semi-quantitative, standardized methodology for assessing technological risk and biomass properties contributing to that risk.

09 BIOMASS FUELS↗

RISK-INFORMED BALANCING OF SAFETY, NONPROLIFERATION, AND ECONOMICS FOR THE SFR

A substantial barrier to the implementation of Sodium-cooled Fast Reactor (SFR) technology in the short term is the perception that they would not be economically competitive with advanced light water reactors. With increased acceptance of risk-informed regulation, the opportunity exists to reduce the costs of a nuclear power plant at the design stage without applying excessive conservatism that is not needed in treating low risk events. In the report, NUREG-1860, the U.S. Nuclear Regulatory Commission describes developmental activities associated with a risk-informed, scenario-based technology neutral framework (TNF) for regulation. It provides quantitative yardsticks against which the adequacy of safety risks can be judged. We extend these concepts to treatment of proliferation risks. The objective of our project is to develop a risk-informed design process for minimizing the cost of electricity generation within constraints of adequate safety and proliferation risks. This report describes the design and use of this design optimization process within the context of reducing the capital cost and levelized cost of electricity production for a small (possibly modular) SFR. Our project provides not only an evaluation of the feasibility of a risk-informed design process but also a practical test of the applicability of the TNF to an actual advanced, non-LWR design. The report provides results of five safety related and one proliferation related case studies of innovative design alternatives. Applied to previously proposed SFR nuclear energy system concepts We find that the TNF provides a feasible initial basis for licensing new reactors. However, it is incomplete. We recommend improvements in terms of requiring acceptance standards for total safety risks, and we propose a framework for regulation of proliferation risks. We also demonstrate methods for evaluation of proliferation risks. We also suggest revisions to scenario-specific safety risk acceptance standards, particularly concerning seismic and aircraft impactrelated risks. Most importantly, within the context of the TNF historical SFR safety concerns about energetic core disruptive accidents are seen to be unimportant, but those of rare scenarios mentioned above are seen to be of dominant concern. In terms of proliferation risks the SFR energy system is seen not to be of considerably greater concern than with other nuclear power technologies, providing that highly effective safeguards are employed. We find the economic performance of proposed SFRs likely, due to the problems of using sodium as a coolant, to be inferior to those of LWRs unless they can be credited for services to improve nuclear waste disposal, nuclear fuel utilization and proliferation risk reductions. None of the design innovations investigated offers the promise to reverse this conclusion. The most promising innovation investigated is that of improving the plant's thermodynamic efficiency via use of the supercritical CO{sub 2} (rather than steam Rankine) power conversion system. We were unable to reach conclusions about the economic and proliferation risk implications of competing nuclear fuel processing methods, as available designs are too little developed to justify any such results. Overall, we find the SFR to be a promising alternative to LWRs should the conditions governing the valuation change substantially from current ones.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Communicating Risk to Program Managers

Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

Shivers, C. Herbert↗

Risk-Based SMA and Modernizing Risk Classification at GSFC

In 2014, in response to a large volume of feedback from industry, the science community, and internal to Goddard Space Flight Center (GSFC), GSFC’s Safety and Mission Assurance (SMA) Directorate began a transition to a risk-based implementation of SMA, departing from its longstanding practice of being primarily driven by a mostly static set of Mission Assurance Requirements. The transition started out with a pilot project involving risk-based acceptance of bare-printed circuit boards that was enormously successful, continued through a complete organizational transformation in 2015, and culminated with the baselining of formal Risk-Based SMA policy in 2016. In this presentation we will describe the risk-based SMA concept, segue into how it shapes a modernization of risk classification that GSFC has rolled out, and provide results from the original pilot project for risk-based SMA, involving the printed circuit board assurance process.

Jesse Leitner↗

GO/NO-GO - When is medical hazard mitigation acceptable for launch?

Medical support of spaceflight missions is composed of complex tasks and decisions that dedicated to maintaining the health and performance of the crew and the completion of mission objectives. Spacecraft represent one of the most complex vehicles built by humans, and are built to very rigorous design specifications. In the course of a Flight Readiness Review (FRR) or a mission itself, the flight surgeon must be able to understand the impact of hazards and risks that may not be completely mitigated by design alone. Some hazards are not mitigated because they are never actually identified. When a hazard is identified, it must be reduced or waivered. Hazards that cannot be designed out of the vehicle or mission, are usually mitigated through other means to bring the residual risk to an acceptable level. This is possible in most engineered systems because failure modes are usually predictable and analysis can include taking these systems to failure. Medical support of space missions is complicated by the inability of flight surgeons to provide "exact" hazard and risk numbers to the NASA engineering community. Taking humans to failure is not an option. Furthermore, medical dogma is mostly comprised of "medical prevention" strategies that mitigate risk by examining the behaviour of a cohort of humans similar to astronauts. Unfortunately, this approach does not lend itself well for predicting the effect of a hazard in the unique environment of space. This presentation will discuss how Medical Operations uses an evidence-based approach to decide if hazard mitigation strategies are adequate to reduce mission risk to acceptable levels. Case studies to be discussed will include: 1. Risk of electrocution risk during EVA 2. Risk of cardiac event risk during long and short duration missions 3. Degraded cabin environmental monitoring on the ISS. Learning Objectives 1.) The audience will understand the challenges of mitigating medical risk caused by nominal and off-nominal mission events. 2.) The audience will understand the process by which medical hazards are identified and mitigated before launch. 3.) The audience will understand the roles and responsibilities of all the other flight control positions in participating in the process of reducing hazards and reducing medical risk to an acceptable level.

Hamilton, Douglas R.↗

Public Risk Assessment Program

The Public Entry Risk Assessment (PERA) program addresses risk to the public from shuttle or other spacecraft re-entry trajectories. Managing public risk to acceptable levels is a major component of safe spacecraft operation. PERA is given scenario inputs of vehicle trajectory, probability of failure along that trajectory, the resulting debris characteristics, and field size and distribution, and returns risk metrics that quantify the individual and collective risk posed by that scenario. Due to the large volume of data required to perform such a risk analysis, PERA was designed to streamline the analysis process by using innovative mathematical analysis of the risk assessment equations. Real-time analysis in the event of a shuttle contingency operation, such as damage to the Orbiter, is possible because PERA allows for a change to the probability of failure models, therefore providing a much quicker estimation of public risk. PERA also provides the ability to generate movie files showing how the entry risk changes as the entry develops. PERA was designed to streamline the computation of the enormous amounts of data needed for this type of risk assessment by using an average distribution of debris on the ground, rather than pinpointing the impact point of every piece of debris. This has reduced the amount of computational time significantly without reducing the accuracy of the results. PERA was written in MATLAB; a compiled version can run from a DOS or UNIX prompt.

Mendeck, Gavin↗

Risk Management Technique for design and operation of facilities and equipment

The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

Fedor, O. H.↗

International Space Station Operational Experience and Its Impacts on Future Mission Supportability

Operational experience gained on the International Space Station (ISS) has enabled significant improvements in failure rate estimates for various Orbital Replacement Units (ORUs). These improved estimates, in turn, allow more efficient and accurate spare parts allocations for future missions, enabling significant reductions in both logistics mass and risk. This paper examines the value of ISS experience to date in terms of its impact on supportability for future missions. A supportability model is presented that assesses the spares required as a function of mission endurance and risk, taking into account uncertainty in failure rate estimates. Changes in ISS Environmental Control and Life Support (ECLSS) ORU failure rate estimates are described and discussed, both in terms of the overall population of ORUs and the evolution of failure rate estimates over time for a particular item. The value of those updated failure rate estimates is assessed by calculating the estimated spares mass requirements for two cases, using the initial, pre-ISS estimates and using the estimates informed by on-orbit experience. Hidden risk resulting from underestimated failure rates is also assessed. These results indicate that, for a 1,200-day Mars mission, ISS experience has enabled a 3.9 t to 6.0 t reduction in ECLSS spares mass required and uncovered failure rate underestimates that would have resulted in an order of magnitude increase in risk had they not been discovered and corrected. The implications of these results for system development and mission planning are discussed, including approaches to accelerate the rate of failure rate refinement and the risks associated with making changes or introducing new systems. Overall, test time is a critical factor that must be carefully considered in system development, and new systems must budget appropriate time for testing in a relevant environment or accept higher risk and logistics requirements on future missions.

Owens, Andrew C.↗

Increasing Small Satellite Reliability- A Public-Private Initiative

At present, CubeSat components and buses are generally not appropriate for missions where significant risk of failure, or the inability to quantify risk or confidence, is acceptable. However, in the future we anticipate that CubeSats will be used for missions requiring reliability of 1-3 years for Earth-observing missions and even longer for Planetary, Heliophysics, and Astrophysics missions. Their growing potential utility is driving an interagency effort to improve and quantify CubeSat reliability, and more generally, small satellite mission risk. The Small Satellite Reliability Initiative (SSRI)—an ongoing activity with broad collaborative participation from civil, DoD, and commercial space systems providers and stakeholders—targets this challenge. The Initiative seeks to define implementable and broadly-accepted approaches to achieve reliability and acceptable risk postures associated with several SmallSat mission risk classes—from “do no harm” missions, to those associated with missions whose failure would result in loss or delay of key national objectives. These approaches will maintain, to the extent practical, cost efficiencies associated with small satellite missions and consider constraints associated with supply chain elements, as appropriate. The SSRI addresses this challenge from two architectural levels—the mission- or system-level, and the component- or subsystem-level. The mission- or system-level scope targets assessment approaches that are efficient and effective, with mitigation strategies that facilitate resiliency to mission or system anomalies while the component- or subsystem-level scope addresses the challenge at lower architectural levels. The initiative does not limit strategies and approaches to proven and traditional methodologies, but is focused on fomenting thought on novel and innovative solutions. This paper discusses the genesis of and drivers for this initiative, how the public-private collaboration is being executed, findings and recommendations derived to date, and next steps towards broadening small satellite mission potential.

SmallSat↗

Commercial Off-the-Shelf (COTS) Components and Enterprise Component Information System (eCIS)

The purpose of the project was to develop the processes for using commercial off-the-shelf (COTS) parts for WR production and to put in place a system for implementing the data management tools required to disseminate, store, track procurement, and qualify vendors. Much of the effort was devoted to determining if the use of COTS parts was possible. A basic question: How does the Nuclear Weapons Complex (NWC) begin to use COTS in the weapon Stockpile Life Extension Programs with high reliability, affordability, while managing risk at acceptable levels? In FY00, it was determined that a certain weapon refurbishment program could not be accomplished without the use of COTS components. The elements driving the use of COTS components included decreased cost, greater availability, and shorter delivery time. Key factors that required implementation included identifying the best suppliers and components, defining life cycles and predictions of obsolescence, testing the feasibility of using COTS components with a test contractor to ensure capability, as well as quality and reliability, and implementing the data management tools required to disseminate, store, track procurement, and qualify vendors. The primary effort of this project then was to concentrate on the risks involved in the use of COTS and address the issues of part and vendor selection, procurement and acceptance processes, and qualification of the parts via part and sample testing. The Enterprise Component Information System (eCIS) was used to manage the information generated by the COTS process. eCIS is a common interface for both the design and production of NWC components and systems integrating information between SNL National Laboratory (SNL) and the Kansas City Plant (KCP). The implementation of COTS components utilizes eCIS from part selection through qualification release. All part related data is linked across an unclassified network for access by both SNL and KCP personnel. The system includes not only NWC part information but also includes technical reference data for over 25 Million electronic and electromechanical commercial and military parts via a data subscription. With the capabilities added to the system through this project, eCIS provides decision support, parts list/BOM analysis, editing, tracking, workflows, reporting, and history/legacy information integrating manufacturer reference, company technical, company business, and design data.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Probabilistic ecological risk assessment and source apportionment of polycyclic aromatic hydrocarbons in surface sediments from Yellow Sea

Based on the concentrations of polycyclic aromatic hydrocarbons (PAHs) in 12 surface sediment samples from Yellow Sea, the relative risk of 9 PAHs was investigated using joint risk probability distribution curves and overlapping area, which were generated based on the distributions of exposure and acute toxicity data (LC50), and the sources of PAHs were apportioned using principal component analysis. It was found that joint probability curve and overlapping area indicated the acceptable ecological risk of individual PAHs, only a small fraction of the benthic organisms was affected. Among the nine PAHs studied, the overall risk of pyrene was the highest, with that of naphthalene the lowest. For lower exposure levels at which the percentage of species affected was less than 10%, the risk associated with phenanthrene and fluorene were clearly higher than that of the other seven PAHs. It was indicated that PAHs in surface sediments mainly originated from vehicular emissions, coal combustion sources, coke oven emission and wood combustion, petroleum origin made little influence on sources of PAHs by PCA.

01 COAL, LIGNITE, AND PEAT↗

Full-Scale Cask Testing and Public Acceptance of Spent Nuclear Fuel Shipments - 12254

Full-scale physical testing of spent fuel shipping casks has been proposed by the National Academy of Sciences (NAS) 2006 report on spent nuclear fuel transportation, and by the Presidential Blue Ribbon Commission (BRC) on America's Nuclear Future 2011 draft report. The U.S. Nuclear Regulatory Commission (NRC) in 2005 proposed full-scale testing of a rail cask, and considered 'regulatory limits' testing of both rail and truck casks (SRM SECY-05-0051). The recent U.S. Department of Energy (DOE) cancellation of the Yucca Mountain project, NRC evaluation of extended spent fuel storage (possibly beyond 60-120 years) before transportation, nuclear industry adoption of very large dual-purpose canisters for spent fuel storage and transport, and the deliberations of the BRC, will fundamentally change assumptions about the future spent fuel transportation system, and reopen the debate over shipping cask performance in severe accidents and acts of sabotage. This paper examines possible approaches to full-scale testing for enhancing public confidence in risk analyses, perception of risk, and acceptance of spent fuel shipments. The paper reviews the literature on public perception of spent nuclear fuel and nuclear waste transportation risks. We review and summarize opinion surveys sponsored by the State of Nevada over the past two decades, which show consistent patterns of concern among Nevada residents about health and safety impacts, and socioeconomic impacts such as reduced property values along likely transportation routes. We also review and summarize the large body of public opinion survey research on transportation concerns at regional and national levels. The paper reviews three past cask testing programs, the way in which these cask testing program results were portrayed in films and videos, and examines public and official responses to these three programs: the 1970's impact and fire testing of spent fuel truck casks at Sandia National Laboratories, the 1980's regulatory and demonstration testing of MAGNOX fuel flasks in the United Kingdom (the CEGB 'Operation Smash Hit' tests), and the 1980's regulatory drop and fire tests conducted on the TRUPACT II containers used for transuranic waste shipments to the Waste Isolation Pilot Plant in New Mexico. The primary focus of the paper is a detailed evaluation of the cask testing programs proposed by the NRC in its decision implementing staff recommendations based on the Package Performance Study, and by the State of Nevada recommendations based on previous work by Audin, Resnikoff, Dilger, Halstead, and Greiner. The NRC approach is based on demonstration impact testing (locomotive strike) of a large rail cask, either the TAD cask proposed by DOE for spent fuel shipments to Yucca Mountain, or a similar currently licensed dual-purpose cask. The NRC program might also be expanded to include fire testing of a legal-weight truck cask. The Nevada approach calls for a minimum of two tests: regulatory testing (impact, fire, puncture, immersion) of a rail cask, and extra-regulatory fire testing of a legal-weight truck cask, based on the cask performance modeling work by Greiner. The paper concludes with a discussion of key procedural elements - test costs and funding sources, development of testing protocols, selection of testing facilities, and test peer review - and various methods of communicating the test results to a broad range of stakeholder audiences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved Verification for Aerospace Systems

Aerospace systems are subject to many stringent performance requirements to be verified with low risk. This report investigates verification planning using conditional approaches vice the standard classical statistical methods, and usage of historical surrogate data for requirement validation and in verification planning. The example used in this report to illustrate the results of these investigations is a proposed mission assurance requirement with the concomitant maximum acceptable verification risk for the NASA Constellation Program Orion Launch Abort System (LAS). This report demonstrates the following improvements: 1) verification planning using conditional approaches vice classical statistical methods results in plans that are more achievable and feasible; 2) historical surrogate data can be used to bound validation of performance requirements; and, 3) incorporation of historical surrogate data in verification planning using conditional approaches produces even less costly and more reasonable verification plans. The procedures presented in this report may produce similar improvements and cost savings in verification for any stringent performance requirement for an aerospace system.

Powell, Mark A.↗

Geologic carbon sequestration as a global strategy to mitigate CO2 emissions: Sustainability and environmental risk

Fossil fuels are abundant, inexpensive to produce, and are easily converted to usable energy by combustion as demonstrated by mankind's dependence on fossil fuels for over 80% of its primary energy supply (13). This reliance on fossil fuels comes with the cost of carbon dioxide (CO{sub 2}) emissions that exceed the rate at which CO{sub 2} can be absorbed by terrestrial and oceanic systems worldwide resulting in increases in atmospheric CO{sub 2} concentration as recorded by direct measurements over more than five decades (14). Carbon dioxide is the main greenhouse gas linked to global warming and associated climate change, the impacts of which are currently being observed around the world, and projections of which include alarming consequences such as water and food shortages, sea level rise, and social disruptions associated with resource scarcity (15). The current situation of a world that derives the bulk of its energy from fossil fuel in a manner that directly causes climate change equates to an energy-climate crisis. Although governments around the world have only recently begun to consider policies to avoid the direst projections of climate change and its impacts, sustainable approaches to addressing the crisis are available. The common thread of feasible strategies to the energy climate crisis is the simultaneous use of multiple approaches based on available technologies (e.g., 16). Efficiency improvements (e.g., in building energy use), increased use of natural gas relative to coal, and increased development of renewables such as solar, wind, and geothermal, along with nuclear energy, are all available options that will reduce net CO{sub 2} emissions. While improvements in efficiency can be made rapidly and will pay for themselves, the slower pace of change and greater monetary costs associated with increased use of renewables and nuclear energy suggests an additional approach is needed to help bridge the time period between the present and a future when low-carbon energy is considered cheap enough to replace fossil fuels. Carbon dioxide capture and storage (CCS) is one such bridging technology (1). CCS has been the focus of an increasing amount of research over the last 15-20 years and is the subject of a comprehensive IPCC report that thoroughly covers the subject (1). CCS is currently being carried out in several countries around the world in conjunction with natural gas extraction (e.g., 2, 3) and enhanced oil recovery (17). Despite this progress, widespread deployment of CCS remains the subject of research and future plans rather than present action on the scale needed to mitigate emissions from the perspective of climate change. The reasons for delay in deploying CCS more widely are concerns about cost (18), regulatory and legal uncertainty (19), and potential environmental impacts (21). This chapter discusses the long-term (decadal) sustainability and environmental hazards associated with the geologic CO{sub 2} storage (GCS) component of large-scale CCS (e.g., 20). Discussion here barely touches on capture and transport of CO{sub 2} which will occur above ground and which are similar to existing engineering, chemical processing, and pipeline transport activities and are therefore easier to evaluate with respect to risk assessment and feasibility. The focus of this chapter is on the more uncertain part of CCS, namely geologic storage. The primary concern for sustainability of GCS is whether there is sufficient capacity in sedimentary basins worldwide to contain the large of amounts of CO{sub 2} needed to address climate change. But there is also a link between sustainability and environmental impacts. Specifically, if GCS is found to cause unacceptable impacts that are considered worse than its climate-change mitigation benefits, the approach will not be widely adopted. Hence, GCS has elements of sustainability insofar as capacity of the subsurface for CO{sub 2} is concerned, and also in terms of whether the associated environmental risks are acceptable or not to the public.

01 COAL, LIGNITE, AND PEAT↗

Streamlining Ground Station Network Compatibility Test for Small Satellites

A team of eight subject matter experts at NASA Goddard Space Flight Center (GSFC) completed a Lean Six Sigma project to identify process improvements for the compatibility test process for small satellites planning to use the NASA Near Earth Network (NEN). Ground station network compatibility testing is designed to reduce the risk to missions by resolving issues between the spacecraft's flight communication and navigation components and the ground systems prior to launch. Compatibility testing, which consists of a series of tests performed over a period of months and documented in reports, is an important step meant to prevent post-launch anomalies that could lead to expensive troubleshooting or mission failure. Compared to traditional missions, small satellite missions typically have a smaller budget and compressed schedules, which can result in small satellite projects' willingness to accept the risk associated with less comprehensive compatibility testing. Optimization and or refinement of the compatibility test process for small satellite missions could alleviate some of the pressures inherent with these factors. The goal of the Lean Six Sigma project was to develop alternative scalable methods of compatibility testing for small satellites. The Lean Six Sigma approach and the results of the project are reviewed in this paper.

Streamlining↗

Improving Efficacy and Safety of Pharmacological Treatment Through Precision Medicine and Pharmacogenomics for Human Deep Space Exploration

INTRODUCTION: Future spaceflight will require increased crew medical autonomy as exploration class missions expanding duration and distance from Earth, especially for Mars missions. As mission duration increases, it will be even more essential to have appropriate amounts of effective medication to ensure the maintenance of crew health and performance. Conversely, mass and volume constraints will become more severe as future spaceflight expands beyond low Earth orbit, where resupply is difficult or becomes impossible. These constraints thus convey an urgency to further tailor medications included in the spacecraft formulary and increased examination of appropriate dosing regimens. BACKGROUND: Precision Health is an exciting area of cutting-edge research and medicine focused on maintaining an individual’s health and performance through in-depth understanding of an individual’s unique factors and molecular profiles. This approach can be adapted to better predict, monitor, and address physiological responses to the spaceflight environment. One example is the field of pharmacogenomics (PGX),the study of how the expressed genome impacts drug responses with the goal of prescribing the right dose of the right drug at the right time. Specifically, PGX testing provides valuable information on an individual’s precise allelic variations to guide physicians in making informed decisions on pharmaceutical choice and dosing to avoid adverse drug events and maximize pharmacological efficacy. The goal of this study was to evaluate which drugs in the current space pharmacy could be evaluated using PGX testing and to understand the potential impact on the health and wellness of the astronaut population. Additionally, we sought to evaluate clinically available FDA-approved PGX testing solutions to better understand its applicability. METHODS: A complete list of drugs onboard the International Space Station (ISS) was analyzed for risk and likelihood of drug failure and PGX actionability. This analysis encompassed both personal astronaut medications, including supplements and over the counter drugs (n=151) and ISS MedKit formulary medications (n=95). Duplicate medications and different formulations were removed, which resulted in 157 total drugs used in the subsequent analysis. A 5x5 risk assessment table was produced by examining the likelihood of drug failure compared to the consequence of drug failure. Likelihood of individual drug failure was defined by whether existing processes are sufficient to prevent adverse events, as ranked from 1 (very low, can easily be prevented) to 5 (very high, cannot be prevented) during a Mars mission. In contrast, the consequence of drug failure was defined by impact to safety, schedule, cost or technical and ranked from 1 (very low) to 5 (very high).A comprehensive assessment of commercially available PGX solutions is currently underway to evaluate specimen requirements, cost/benefit analysis (cost vs. number of alleles assessed), utility of variant analysis, relevance to inflight medication usage, quality of reporting in enabling clinical application, and ease of integration into electronic medical records. RESULTS: Risk assessments(LxC 5x5 table) indicated29medicationswere in the yellow or red zone driven predominantly by drug failure or safety concerns, with the remainder(n=128)of the medications in the green zone where risk is acceptable. We found that current PGX testing results could impact 21% of the total medications in the ISS MedKit and IMAK; of these, 9 medications currently have direct clinically actionable guidance available. Results of the clinical PGX solution evaluations as related to these medications will be presented. CONCLUSION: PGX testing has demonstrated clear benefits in terrestrial medicine and clinical environments for the selection of proper medications, avoiding adverse drug reactions, and maximizing drug efficacy. We propose that similar benefits would be bestowed on the astronaut and commercial spaceflight passenger population by performing preemptive pre-flight PGX testing to reduce risk of mission failure due to ineffective or toxic medications, improve targeting drug efficacy and safety, and further open the door to countermeasure research exploring PGX-related allelic variants. For example, PGX results could allow tailoring of specific medications at optimal doses more precisely to each individual astronaut, particularly in areas of space motion sickness, sleep aids, and analgesics. An additional benefit is that PGX results could provide information for better planning of the components of a space pharmacy for deep space missions to be more cost effective and more efficient in the utilization of limited pharmaceutical resources. Finally, while PGX testing of the astronaut corps is not currently conducted, this approach could provide immediate impact in support of mission success by reducing risks, optimizing astronaut performance, and providing valuable insights into long-term astronaut health. Such advancements in clinical decision making are important next steps in building dynamic individual risk profiles for astronauts, increasing crew autonomy and providing tailored countermeasures

Alice R W Tang↗

Improving Efficacy and Safety of Pharmacological Treatment Through Precision Health and Pharmacogenomics

INTRODUCTION: Future spaceflight will require increased crew medical autonomy as exploration class missions expand in duration and distance from Earth, especially for Mars missions. As mission duration increases, it will be essential to have appropriate amounts of effective medication to ensure the maintenance of crew health and performance. Conversely, mass and volume constraints will become more severe as future spaceflight expands beyond low Earth orbit, where resupply is difficult or becomes impossible. These constraints thus convey an urgency to tailor medications for individual crewmembers and further examine appropriate dosing regimens. BACKGROUND: Precision Health is an exciting area of medicine focused on maintaining an individual’s health and performance through in-depth understanding of an individual’s unique clinical and environmental history, genetic makeup, and molecular profiles. This approach can be adapted to better predict, monitor, and address physiological responses to the spaceflight environment. A subset of this field is pharmacogenomics (PGX), the study of how the expressed genome impacts drug responses with the goal of prescribing the right dose of the right drug at the right time. Specifically, PGX testing provides valuable information on an individual’s precise allelic variations to guide physicians in making informed decisions on drug choice and dosing to avoid adverse events and maximize efficacy. The study goal was to identify which current space pharmacy drugs could be evaluated using PGX testing and to understand the potential impact on the health and wellness of the astronaut population. Additionally, we sought to evaluate clinically available FDA-approved PGX testing solutions to better understand its applicability. METHODS: A complete list of drugs on the ISS was analyzed for risk and likelihood of drug failure and PGX actionability. This analysis encompassed both astronauts’ personal medications, including supplements and over the counter drugs (n=151) contained in the ISS medical accessory kit (IMAK), and ISS MedKit formulary medications (n=95). Duplicate medications and different formulations were removed, which resulted in a total of 157 drugs used in the subsequent analysis. A 5x5 risk assessment table was produced by examining the likelihood of drug failure compared to the consequence of drug failure (LxC). Likelihood of individual drug failure was defined by whether existing processes are sufficient to prevent ineffective treatment or impactful side effect events, as ranked from 1 (very low, can easily be prevented) to 5 (very high, cannot be prevented) during a Mars mission. In contrast, the consequence of drug failure was defined by impact to safety, schedule, cost, or technical criteria and ranked from 1 (very low) to 5 (very high). An assessment of PGX reference laboratories is currently underway to evaluate sample requirements, benefit analysis (cost vs. utility of allele variant analysis), relevance to inflight medication usage, quality of reporting in enabling clinical application, and ease of integration into electronic medical records. RESULTS: Risk assessments (LxC 5x5 table) indicated 128 medications were in the green zone where risk is acceptable, with the remaining 29 of the medications in the yellow or red zone driven predominantly due to drug failure or safety concerns. We found that current PGX testing results could impact 21% of the total medications in the ISS MedKit and IMAK; of these, 9 medications currently have direct clinically actionable guidance available. Results of the clinical PGX solution evaluations as related to these medications will be presented. CONCLUSION: PGX testing has demonstrated clear benefits in terrestrial medicine and clinical environments for the selection of proper medications, avoiding adverse drug reactions, and maximizing drug efficacy. We propose that similar benefits would be bestowed on the astronaut and commercial spaceflight passenger population by performing preemptive preflight PGX testing to reduce risk of mission failure due to ineffective or toxic medications, improve drug efficacy, and further open the door to countermeasure research. For example, PGX results could allow tailoring of specific medications at optimal doses more precisely to each individual astronaut, particularly in areas of space motion sickness, sleep aids, and analgesics. An additional benefit is that PGX results could provide information for better planning of the components of a space pharmacy for deep space missions to be more effective and efficient in the utilization of limited pharmaceutical resources. Finally, while PGX testing of the astronaut corps is not currently conducted, this approach could provide immediate impact in support of mission success by reducing risks, optimizing astronaut performance, and providing valuable insights into long-term astronaut health. Such advancements in clinical decision making are important next steps in building dynamic individual risk profiles for astronauts, increasing selection of the best treatment choice, and providing tailored countermeasures for individual crewmembers.

Pharmacogenomics↗

Hanford Tank Waste - Near Source Treatment of Low Activity Waste

Abstract only. Treatment and disposition of Hanford Site waste as currently planned consists of 100+ waste retrievals, waste delivery through up to 8+ miles of dedicated, in-ground piping, centralized mixing and blending operations- all leading to pre-treatment combination and separation processes followed by vitrification at the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The sequential nature of Tank Farm and WTP operations requires nominally 15-20 years of continuous operations before all waste can be retrieved from many Single Shell Tanks (SSTs). Also, the infrastructure necessary to mobilize and deliver the waste requires significant investment beyond that required for the WTP. Treating waste as closely as possible to individual tanks or groups- as allowed by the waste characteristics- is being investigated to determine the potential to 1) defer, reduce, and/or eliminate infrastructure requirements, and 2) significantly mitigate project risk by reducing the potential and impact of single point failures. The inventory of Hanford waste slated for processing and disposition as LAW is currently managed as high-level waste (HLW), i.e., the separation of fission products and other radionuclides has not commenced. A significant inventory of this waste (over 20M gallons) is in the form of precipitated saltcake maintained in single shell tanks, many of which are identified as potential leaking tanks. Retrieval and transport (as a liquid) must be staged within the waste feed delivery capability established by site infrastructure and WTP. Near Source treatment, if employed, would provide for the separation and stabilization processing necessary for waste located in remote farms (wherein most of the leaking tanks reside) significantly earlier than currently projected. Near Source treatment is intended to address the currently accepted site risk and also provides means to mitigate future issues likely to be faced over the coming decades. This paper describes the potential near source treatment and waste disposition options as well as the impact these options could have on reducing infrastructure requirements, project cost and mission schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗