Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Materials response under hypersonic flow conditions probed by multi-modal diagnostics in a benchtop wind tunnel

In this LDRD “Materials response under hypersonic flow conditions probed by multi-modal diagnostics in a benchtop wind tunnel” a peer-reviewed lab-scale hypersonic wind tunnel (WT) was planned to be assembled in-house, along with time and space resolved and related flow and materials diagnostics to derive high quality measurements and the science that is able to inform the development of our modeling and simulation codes for the hypersonic regime. The baseline capability to achieve Mach 3 flow was scheduled to be completed in Q4 2020, in the first year of the LDRD. However due to the COVID-19 delays and travel restrictions starting in March, 2020 this task could not be completed to carry out the materials response studies in-house, or those planned with external partners that were engaged during this LDRD (NASA Langley, NASA Ames, Texas A&M university, and Virginia Tech). Still, using our hypersonic computational fluid simulation codes, many of the hypersonic components have been designed (for Mach 3, 5, and 7) and procured (or in procurement phase), and a new dedicated hypersonic laboratory was facilitized, 2 WT test sections have been manufactured, and a Mach 3 nozzle was 3D printed for prototyping. In parallel, unique materials diagnostics have been tested under static conditions and fully specified and awaiting validation in our partner facilities. Due to the new hypersonic initiative announced in January, 2020 we proposed a related scope increase in hypersonics research requiring energy interactions and new diagnostics well beyond what could be supported by an LDRD ER. A decision was made to end the current LDRD ER and formally propose a new LDRD SI that leverages the current effort, which will be starting in FY21. As a result of the uniqueness of this LDRD work, our early efforts have been encouraged and well received in the hypersonic research community, and is now part of multiple unsolicited internal and external project proposals expected to be funded in the coming years, which is encouraging to make LLNL a leader in experimentally probing extreme physics of local energetics critical to hypersonics.

36 MATERIALS SCIENCE↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Design of Sustainable Ammonia-Based Food–Energy–Water Systems with Nitrogen Management

As the basis for virtually any form of nitrogen fertilizers, ammonia plays a vital role in agriculture; in addition, there has been an increased interest in its use as a carbon-free energy carrier. However, ammonia is also associated with two major environmental concerns: CO 2 emissions from the conventional production process and nitrogen pollution from the excessive use of ammonia-based fertilizers. To mitigate these environmental impacts, we develop an optimization framework for the design of a sustainable ammonia-based agricultural system that synergistically integrates the production of ammonia from renewable resources and effective measures for nitrogen management. The proposed model captures the effect of intermittency by incorporating both design and detailed operational decisions. Here, by applying a multiscale time representation that reduces the problem size and a tailored surrogate model that accurately approximates model nonlinearity, we are able to achieve optimal solutions within reasonable computation times. A computational case study is conducted using real-world data from a local farm in Morris, Minnesota, and the results indicate the trade-off between cost and nitrogen loss. Importantly, we show that practicing effective nitrogen management can significantly reduce the nitrogen loss with only a small increase in net present cost.

10 SYNTHETIC FUELS↗

City-level impacts of building tune-ups: Findings from Seattle's building tune-ups program

Many U.S. cities are implementing policies to reduce greenhouse gas (GHG) emissions of their buildings. These range from building energy benchmarking and disclosure to building performance standards (BPS) that require buildings to meet specific targets of energy use or emissions. The City of Seattle adopted a climate action plan in 2013 that set a goal of zero net GHG emissions in the road transportation, buildings, and waste sectors by 2050, with a number of near and long term actions. Seattle implemented mandatory building tune-ups in 2016, applying to commercial buildings larger than 50,000 sqft. Building tune-ups1 involve assessment and implementation of operational and maintenance (O + M) improvements to achieve energy and water efficiency, such as changes to thermostat set points or adjusting lighting or irrigation schedules. Seattle's tune-ups program covered 27 such improvements in HVAC, lighting, domestic hot water, and envelope systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CRADA Number NFE-24-10110 with Qubit Engineering Inc. (CRADA Final Report)

Over the past year, the Qubit Engineering team has pushed the frontiers of power‑grid optimization, working in close collaboration with Oak Ridge National Laboratory (ORNL) and the Tennessee Valley Authority (TVA). Their progress is reflected in three newly submitted conference papers, “Unified Relational GNN Architecture for AC Optimal Power Flow Calculations in Electric Grids,” “Graph‑Based Attention Mechanisms for Solving the AC Optimal Power Flow Problem in Electrical‑Power Networks,” and “Enhanced Power‑Grid Maintenance Planning and Quantum‑Inspired Combinatorial Prospects.” These publications showcase state‑of‑the‑art graph‑neural‑network methods for AC‑OPF and novel quantum‑inspired heuristics for maintenance scheduling. Beyond the academic results, the Qubit team has converted the research into two production‑grade tools built on TVA data: Neuro‑Grid, an AI‑driven power‑flow simulator that provides instant, interactive full‑grid load‑flow visualizations, and Quanta‑Grid, a quantum‑inspired maintenance‑scheduling engine to support logistics optimization for power utilities. Together, these advances demonstrate how Qubit’s partnership with ORNL and TVA is delivering practical, physics‑grounded analytics for next‑generation grid management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Work In Progress: Using Internships as Means for Indirect Assessment of ABET Criteria 3 "1-7" Student Outcomes

PSU operates the Power Engineering Internship program with funding from two U.S. Department of Energy grants. The program is operated in partnership with the lead organizations of these grants, an investor-owned utility, Portland General Electric (PGE), and the Confederated Tribes of the Warm Springs (CTWS). One of the programmatic goals of the PEI is to create and sustain a clean energy engineering workforce pipeline on behalf of these lead organizations. Both grants support internships at PGE, which is also a partner on the CTWS grant. The PEI provides engineering students with year-long internships, spanning both the academic year and the summer. The interns work at PGE facilities located throughout the Portland metropolitan area. Interns are employed full-time during summers and part-time during the academic year. Proximity of the worksites to the PSU campus enables the interns to participate in the program while attending school full-time. During the academic year, students average fifteen hours per week, adjusting their work schedule according to their academic workload. The interns are allocated 930 hours per year, 480 in the summer and 450 during the academic year, which they can plan as they see fit. The internships provide meaningful financial support for the students, who can earn up to $21k if they use all of their allocated hours. Such funding is particularly important for the typical student who attends a minority serving institutions,

99 GENERAL AND MISCELLANEOUS↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of a Mixed Fleet of Aerial Drones for Medical Supplies: A Case Study of Blood Delivery Logistics

Aerial drones have emerged as an innovative solution for faster transportation of time-sensitive items (e.g., emergency medical supplies), potentially reducing the transmission of contagious diseases and enhancing healthcare availability through contactless autonomous delivery. We study fleet sizing and efficient scheduling of a mixed fleet of drones for delivering time-sensitive medical items having distinct release and due times to minimize the required fleet size and fleet composition, the required number of additional batteries, and the total energy consumption. We continuously track the remaining battery energy of drones to determine the optimal timing for battery replacement, rather than replacing the battery at each node. Using actual drone flight test data, we employed a machine learning (ML) method to estimate the energy consumption of different drone types during flight segments for different operating parameters. We present a novel mixed-integer programming model to efficiently formulate the problem that integrates the estimated energy consumption functions from ML. We propose a new greedy heuristic (GH) algorithm and a customized genetic algorithm (GA) for solving large-scale instances of this problem faster. Results demonstrate that the GH algorithm is substantially faster than the accelerated CPLEX and the GA, while sacrificing the solution quality by a small amount. Results based on an actual blood sample delivery case study from Pendleton, Oregon, United States, show that using a mixed fleet of drones reduces the total cost and total energy consumption up to 18.18% and 28.7%, respectively, compared to using a homogeneous fleet.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Summary of US DOE R&D Activities on Graphite Oxidation (2006–2021)

The objective of the international collaboration between United States Department of Energy (U.S.-DOE) and Generation IV International Forum (GIF) is the development of the next generation of nuclear energy systems. The current GIF Project Arrangement (PA) on Materials (2018-2022) was revised in 2019 and extended for another 10 years (2020-2030). The Work Package 1 (“Graphite”) of the extended Project Plan (PP) on Materials specifies technical tasks and High Level Deliverables for research and development (R&D) activities related to using graphite in fuel elements, reflectors, and support structures of Very High Temperature Reactors (VHTR). The graphite tasks include specification and acquisition, qualification and development of new grades, characterization of properties, and development of behavior models. Specifically, Task 1.4 (“Graphite Oxidation Behavior”) outlines planned activities related to acute oxidation by air and chronic oxidation by impurities in the helium coolant. A final report on experimental data regarding graphite oxidation behavior is scheduled for 2022 (deliverable 3.1.1.4.a). In preparation of this deliverable, this document summarizes the R&D activities funded by U.S.-DOE from 2006 (the inception of the VHTR system arrangement) through present (2021). This report is being submitted to the GIF Graphite Working Group (GWG) to serve as input for the GWG high-level deliverable to the Project Management Board (PMB) of PA on Materials. Besides U.S.-DOE, other organizations participating to Task 1.4 of the current PA on Materials are: European Commission’s Joint Research Center (JRC), Korea Atomic Energy Research Institute (KAERI), and Japan Atomic Energy Agency (JAEA). U.S.-DOE is the main contributor on graphite oxidation R&D, with 85 % commitment of total funding during 2018-2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cloud and Precipitation Experiment at Kennaook (Cape-K) Science Plan

The Cloud and Precipitation Experiment at Kennaook (CAPE-K) will augment ongoing measurements at the Kennaook/Cape Grim Baseline Air Pollution Station (KCG) with components of the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility’s second Mobile Facility (AMF2) in a deployment that is scheduled to extend from April 2024 through September 2025. Located at Kennaook/Cape Grim on the northwestern tip of Tasmania (40.68° S, 144.69° E), KCG has produced the longest and most consequential record of Southern Hemisphere aerosol and gas-phase chemistry; however, extensive cloud and precipitation measurements have not been collected at this site. CAPE-K is motivated by the fact that model uncertainty in the surface radiation budget due to clouds and precipitation remain significant in this region, where strong latitudinal gradients in cloud feedbacks are found and there are strong and well-documented seasonal variations in marine aerosol properties. Satellite data suggest that cloud properties co-vary with the seasonal cycle in aerosol in the Southern Ocean (SO), yet detailed vertically resolved measurements of cloud and precipitation in the marine boundary layer are sparse. CAPE-K will provide the first such seasonal cycle of measurements in this important latitude band. CAPE-K will provide detailed cloud and precipitation observations over two winter seasons and align with complementary high-value-add activities planned by Australian colleagues, including a voyage of the Research Vessel Investigator (RVI) in May 2025 that will conduct measurements just offshore of KCG.

54 ENVIRONMENTAL SCIENCES↗

EVI-Rental: A Scalable Model to Quantify the Impact of Rental Car Electrification

This fact sheet describes the Electric Vehicle Infrastructure - Rental Car (EVI-Rental) tool, a flexible and comprehensive simulation tool that addresses key questions about the charging demand, infrastructure needs, and business impacts of adding growing numbers of electric vehicles (EVs) to rental fleets. To validate the EVI-Rental model, the Athena research team conducted a case study at Dallas-Fort Worth International Airport (DFW) to understand the impact of state-of-charge requirements, different charger types and charging schedules, solar power generation, and behind-the-meter storage on a fully electrified rental car fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

2010-2012 California Household Travel Survey

The 2010-2012 California Household Travel Survey (CHTS) was administered by the California Department of Transportation, which collected demographic and travel behavior characteristics for residents across the entire state. At the time, it was the largest such regional or statewide survey ever conducted in the United States. Detailed travel behavior information was obtained from more than 42,500 households via multiple data-collection methods, including computer-assisted telephone interviewing, online and mail surveys, wearable (7,574 participants) and in-vehicle (2,910 vehicles) global positioning system devices, and on-board diagnostic sensors that gathered data directly from a vehicle's engine. Details of personal travel behavior were gathered within the region of residence, inter-regionally within the state, and in adjoining states and Mexico. The survey sampling plan was designed to ensure an accurate representation of the entire population of the state. The CHTS included additional features, such as vehicle-acquisition decisions, parking choices, work schedules and flexibility, use of toll lanes/priced facilities, and walk and bicycle trips, to support advanced model development.

1Hz data↗

Used Nuclear Fuel Management Using the Next Generation System Analysis Model

The U.S. Department of Energy (DOE) is leading the National effort to manage the back end of the nuclear fuel cycle, encompassing the safe transportation, storage/staging, and/or eventual disposal of used nuclear fuel (UNF) and high-level radioactive waste. The Next Generation System Analysis Model (NGSAM) is DOE’s discrete-event, agent-based simulation tool designed to model the full life cycle of UNF from reactor discharge to final disposal. NGSAM supports the DOE Office of Spent Fuel and High-Level Waste Disposition by enabling a detailed, scenario-based analysis of logistics, infrastructure, and shipping strategies. NGSAM replaces legacy models with a modern, flexible platform built on Repast Simphony and enhanced by the Process Analysis Tool. NGSAM simulates the movement and interaction of individual fuel assemblies with system components such as canisters, casks, railcars, and facilities. The model integrates with the Java Transportation Operations Model to plan and execute transportation scenarios, supporting both constrained and unconstrained resource allocation. Key features include customizable allocation and acceptance algorithms, detailed facility-level operations, and a Quick Edit tool for rapid scenario adjustments. NGSAM supports multimodal transportation modeling (e.g. rail, road, barge) and provides comprehensive cost, schedule, and infrastructure data. NGSAM utilizes data from sources such as DOE’s STANDARDS UNF database and DOE’s Stakeholder Tool for Assessing Radioactive Transportation, while also allowing user-defined inputs for scenario customization. NGSAM enables stakeholders to evaluate complex UNF management strategies, assess system performance under varying assumptions, and inform decision making for future infrastructure investments. Its modular architecture and integration with other Integrated Waste Management System tools make it a critical asset for planning the safe and efficient disposition of the Nation’s growing UNF inventory.

Craig, Brian [Argonne National Laboratory (ANL)]↗

Submersible Multistage Centrifugal Pump for Versatile Test Reactor Cartridge Test Loop

Submersible multistage centrifugal pumps are ideal for pumping in narrow confined spaces and achieving necessary head pressures and flow rates. Once a diameter is determined then manipulation of the number of stages and motor speed are all that are required to meet desired flow conditions. The Versatile Test Reactor (VTR) closed loop cartridge systems will need forced convection cooling independent of the main reactor. A multistage centrifugal pump can meet the necessary flow rates and pumping pressures while minimizing space taken. The pump considered for this work was based off a deep well submersible pump, a variation of a multistage centrifugal pump. We experimented with two pump sizes, 5 cm (2 inch) and 7.5 cm (3 inch) diameters. These diameters were chosen to fit into the inner diameter of standard 5 and 7.5 (2 and 3 inch) Schedule 40 pipe, respectively. This made the design for the test loop both simpler and less expensive as the need for an engineered pump housing was eliminated. Initial test cartridge planning indicated space for only a 5 cm (2 inch) diameter pump, though early testing of this size showed the need for an abnormally high-speed and high-power motor. Fine tuning of the cartridge design allowed a pump size increase to 7.5 cm (3 inches), which was the pump size most extensively tested in this work. The test loop is composed of various sizes of PVC and aluminum piping components in a loop configuration. The pump is driven by a Pittman 250 W (1/3 horsepower) electric motor with maximum speed of 3,450 RPM. Testing consisted of running the pump at a constant motor speed while varying a control valve to restrict flow through the loop, with differential pressure and flow rate recorded. This was done for one and two stage configurations for the 5 cm (2 inch) diameter impeller design and one, two, and three stage configurations for the 7.5 cm (3 inch diameter) impeller design, respectively. Due to pumping power requirements, two and three stage 7.5 cm (3 inch) diameter impeller testing at higher flowrates lowered the motor speed substantially. In regions where motor speed could not be maintained constant, the data were discarded. The test loop was also reconfigured to allow for the pump to be tested for pressure drop in a stalled or inoperable (0 RPM) flow condition. Demonstration of adequate natural convection cooling of the test cartridge fuel type is necessary under accident conditions, and this will depend upon the flow resistance through the impeller assembly when the pump is not operating. Thus, accurate knowledge of the effective impeller assembly loss coefficient is important for safety evaluations. The test loop was modified to provide water inlet and outlets on either side of the pump impeller stack, and a metered flow of lab water was provided in order to measure the pressure drop across the cartridges as a function of flowrate. Data from the pump head curve testing developed as part of this work and supported by analysis using pump head affinity laws indicates that a three stage 7.5 cm (3 inch) pump impeller design will meet target requirements for coolant flow within the VTR cartridge sodium cartridge at full power conditions [1] with margin; this corresponds to a flowrate of 45 l/min (12 gpm) at a pressure drop of 6.1 m (20 feet) of water head. The results of the pressure loss measurements across the impeller assembly when the pump is stationary (i.e., at 0 RPM) indicate that the pressure loss coefficient is 0.921 for a two impeller stack configuration; this value is calculated based on the flow velocity through the minimum available flow area within a single stage of the impeller which corresponds to 1.4 cm2.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗