Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Development of a FELIX based readout system for ITk strip hybrid module demonstrator for ATLAS Phase-II Upgrade

The Large Hadron Collider (LHC) will undergo a major upgrade around 2024 with a roughly tenfold increase in luminosity. It results in corresponding increases in particle rates and radiation doses that the current ATLAS Inner Tracking Detector cannot cope with. Therefore the ATLAS experiment will build a new all-silicon tracking system called the ITk (Inner Tracker) that includes an inside pixel detector close to the beam line and a strip detector in outside layer. Meanwhile the ATLAS experiment will adopt the Front-End Link eXchange (FELIX) system as the interface between the data acquisition and front-end electronics for all sub-detectors in the Phase II Upgrade. In this contribution, we present a prototype of FELIX based readout system for the strip hybrid module. Its hardware, firmware and software GUI application will be discussed, as well as integration test results.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The upgrade of the ALICE TPC with GEMs and continuous readout

The upgrade of the ALICE TPC will allow the experiment to cope with the high interaction rates foreseen for the forthcoming Run 3 and Run 4 at the CERN LHC. In this article, we describe the design of new readout chambers and front-end electronics, which are driven by the goals of the experiment. Gas Electron Multiplier (GEM) detectors arranged in stacks containing four GEMs each, and continuous readout electronics based on the SAMPA chip, an ALICE development, are replacing the previous elements. The construction of these new elements, together with their associated quality control procedures, is explained in detail. Finally, the readout chamber and front-end electronics cards replacement, together with the commissioning of the detector prior to installation in the experimental cavern, are presented. After a nine-year period of R&D, construction, and assembly, the upgrade of the TPC was completed in 2020.

47 OTHER INSTRUMENTATION↗

Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS phase-2 muon system upgrade

Abstract The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward region. The GE2/1 triple-gas electron multiplier detector, which has recently entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing process, and the future plans for the frontend electronics of these two detector systems by the CMS GEM collaboration.

Instruments & Instrumentation↗

ALICE upgrades during the LHC Long Shutdown 2

A Large Ion Collider Experiment (ALICE) has been conceived and constructed as a heavy-ion experiment at the LHC. During LHC Runs 1 and 2, it has produced a wide range of physics results using all collision systems available at the LHC. In order to best exploit new physics opportunities opening up with the upgraded LHC and new detector technologies, the experiment has undergone a major upgrade during the LHC Long Shutdown 2 (2019–2022). This comprises the move to continuous readout, the complete overhaul of core detectors, as well as a new online event processing farm with a redesigned online-offline software framework. These improvements will allow to record Pb-Pb collisions at rates up to 50 kHz, while ensuring sensitivity for signals without a triggerable signature.

47 OTHER INSTRUMENTATION↗

Upgrades of the ATLAS zero degree calorimeter system for Run 3 at the Large Hadron Collider

Experimental studies of ultra-relativistic heavy ion collisions at the Large Hadron Collider (LHC) depend crucially on Zero Degree Calorimeters (ZDCs) that measure neutrons produced at near-beam rapidity in nucleus-nucleus collisions. In hadronic nuclear collisions these neutrons are mainly spectator neutrons, those that do not scatter from opposing nucleons during the collision. As a result, the ZDCs provide a vital probe of heavy ion collision geometry. The ZDCs are also essential in the study of ultra-peripheral collisions that are initiated by photons associated with the electric fields of one or both nuclei. Coherent photon emission typically leaves the photon emitter intact, making the observation of no ZDC signal, on one or both sides, a tag of such processes. The ATLAS ZDCs, built prior to Run 1, were substantially upgraded for LHC Run 3. The primary upgrades included replacement of the quartz Cherenkov radiator with H_2-doped fused silica rods; installation of fast air-core signal cables between the ZDC and the ATLAS USA15 cavern; a new LED-based calibration system; and new electronics implemented for readout and fully-digital triggering. The ZDCs were also augmented with new “Reaction Plane Detectors” (RPDs) designed to measure the transverse centroid of multi-neutron showers to allow event-by-event reconstruction of the directed-flow plane in nuclear collisions. The Run 3 ZDC detectors, including the RPDs, are described in detail with emphasis on aspects that are new for Run 3.

43 PARTICLE ACCELERATORS↗

Upgrade and characterization of the fast-channels of Imaging Neutral Particle Analyzers in the DIII-D tokamak

This publication presents the characterization of the recently upgraded fast (MHz) channels of the DIII-D Imaging Neutral Particle Analyzers. The new system allows for a phase space resolution of < 10 keV and < 10 cm. The main source of noise is due to the background radiation (neutrons and gammas) present in the diagnostic lab during experiments, which can hit the photomultipliers and generate large spikes in signal. Good linear correlations (r 2 > 0.9) are found between the average rate of noise spikes in the fast channels and the average neutron rate. Additional noise is caused by the scintillation of the optical fibers used to guide the signal to the acquisition system, which is induced by neutron and gamma impacts. A correlation factor r 2 > 0.6 between the baseline noise caused by this scintillation and the signals in the neutron diagnostic was found. Possible mitigation strategies, such as the use of shielding and filters, are discussed. These allow to reduce the noise spike rate by an order of magnitude and the noise baseline by a factor 4. Despite the noise, it is shown that the upgraded fast channels provide enough signal-to-noise ratio to observe coherent fluctuations of the energetic particle population.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Performance of Oak Ridge National Laboratory spallation neutron source proton power upgrade cavities and cryomodule production

The Proton Power Upgrade initiative at Oak Ridge National Lab’s Spallation Neutron Source aims to greatly boost the capability of proton beam power. This upgrade involves the integration of seven additional cryomodules, each housing four six-cell high-beta ( β = 0.81 ) superconducting radio frequency cavities. These cavities, manufactured and processed by Research Instruments in Germany, underwent meticulous treatment, including electropolishing as the bulk and final vital step. Upon delivery to Jefferson Lab, a total of 28 cavities for seven cryomodules, along with an additional four cavities for a spare cryomodule, underwent thorough vertical qualification tests, meeting the required specifications. Following cavity tanking and subsequent rf testing, the assembly of eight cryomodules was successfully executed, with all 32 cavities demonstrating compliance with acceptance criteria. The transportation of the cryomodule to SNS for high-power testing in the tunnel yielded exceptional results. Notably, the performance surpassed specifications, in terms of quality factor and accelerating gradient. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Progress in the Development of the Nb 3 Sn MQXFB Quadrupole for the HiLumi Upgrade of the LHC

The high-luminosity upgrade of the Large Hadron Collider (HL-LHC) requires new high field and large-aperture quadrupole magnets for the low-beta inner triplets (MQXF). With a nominal operating gradient of 132.2 T/m in a 150 mm aperture and a conductor peak field of 11.3 T, the new quadrupole magnets are based on Nb 3 Sn superconducting technology. After a series of short models constructed in close collaboration by LARP (LHC Accelerator Research Program) and CERN, the development program is entering in the series production phase with CERN on one side and the US Accelerator Upgrade Project (US-AUP) on the other side assembling and testing full-length magnets. This paper describes the status of the development activities at CERN, in particular on the cold powering test of the first MQFXB prototype and on the construction of the second full scale prototype. Critical operations such as reaction heat treatment, coil impregnation and magnet assembly are discussed. Finally, the plan towards the series production is described.

43 PARTICLE ACCELERATORS↗

Field quality of the 4.5 m-long MQXFA pre-series magnets for the HL-LHC Upgrade as observed during magnet assembly

We report that the U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) is developing MQXFA magnets, a series of 4.5 m long 150 mm aperture high-field Nb 3 Sn quadrupole magnets for the HL-LHC upgrade at CERN. Five pre-series magnets, MQXFA03 through MQXFA07, have been developed. During the magnet assembly stage, we perform magnetic measurements on the coil-pack sub-assembly and magnets after loading to track the field quality for two purposes. First, it serves as a quality assurance tool to check if the magnetic field quality is on track to meet the acceptance criteria. Magnetic measurements are used to understand if magnetic shims are needed to compensate low-order field errors and to meet the field quality targets. Second, the measurements during the assembly stage can also help understand the field quality, especially the geometric field errors, for Nb 3 Sn accelerator magnets. Here we summarize the measurement results of the pre-series MQXFA magnets, including the magnetic axis and twist angle. The results will provide useful feedback for the series production of Nb 3 Sn magnets and on the optimization of field quality of accelerator magnets based on the wind-and-react Nb 3 Sn technology.

43 PARTICLE ACCELERATORS↗

Analysis of the Mechanical Performance of the 4.2-m-Long MQXFA Magnets for the Hi-Lumi LHC Upgrade

Under the U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), the 150 mm bore, high-field Nb 3 Sn low-{eta}_MQXFA quadrupole magnets are being fabricated, assembled and tested, in the context of the CERN Hi-Luminosity LHC (HL-LHC) upgrade. These magnets have 4.2 m magnetic length and 4.56 m long iron yoke. To date, eight MQXFA magnets have been tested. One of the magnets additionally underwent a successful endurance test with 40 triggered quenches, and two magnets did not perform as expected. This work summarizes for the first time the available strain gauge data from eight identical Nb 3 Sn MQXFA tested magnets, focusing on the endurance test, and on a possible cause of underperformance of the two magnets that did not pass the vertical test. Here we applied methods to prevent this from happening in future MQXFA magnets, which shown to be effective for last two tested magnets.

43 PARTICLE ACCELERATORS↗

Predicting the Cetane Number, Yield Sooting Index, Kinematic Viscosity, and Cloud Point for Catalytically Upgraded Pyrolysis Oil Using Artificial Neural Networks

Abstract The conversion of biomass using fast pyrolysis has the potential to be significantly less expensive at scale compared to alternative methods such as fermentation and gasification. Selective upgrading of the products of fast pyrolysis through chemical catalysis produces compounds with lower oxygen content and lower acidity; however, identifying the specific catalytic pathways for producing viable fuels and fuel additives often requires a trial-and-error approach. Specifically, key properties of the compounds must be experimentally tested to evaluate the viability of the resultant compounds. The present work proposes predictive models constructed with artificial neural networks (ANNs) for cetane number (CN), yield sooting index (YSI), kinematic viscosity (KV), and cloud point (CP), with blind test set median absolute errors of 5.14 cetane units, 3.36 yield sooting index units, 0.07 millimeters squared per second, and 4.89 degrees Celsius, respectively. Furthermore, the cetane number, yield sooting index, kinematic viscosity, and cloud point were predicted for over three hundred expected products from the catalytic upgrading of pyrolysis oil. It was discovered that 130 of these compounds have predicted cetane numbers greater than 40, with four of these compounds possessing predicted yield sooting index values significantly less than that of diesel fuel and predicted viscosities and cloud points comparable to that of diesel fuel.

09 BIOMASS FUELS↗

RPI LINAC refurbishment and upgrade project

The Electron Linear Accelerator at Rensselaer Polytechnic Institute (RPI) was constructed in the late 1950s and started operation in 1961 [1]. The facility was designed and used primarily for measurements of Nuclear Data (ND) with emphasis on the resonance energy region. As such it was designed to produce short pulses of neutrons (5-5000 ns) and equipped with detection stations at different neutron flight path distances from the source (15 m-250 m). When the LINAC started operation it was one of the most powerful accelerators in the world for high energy-resolution measurements in the resonance region. The original LINAC with some upgrades is still in operation but no longer provides world class capabilities for measurements with short pulses. In 2011 discussions between the RPI ND group, Naval Reactors, and the Nuclear Criticality Safety Program about the future of the LINAC concluded that maintaining the capability to perform world-class nuclear data measurements at RPI was desirable. To that end, it was decided to refurbish the facility and upgrade the accelerator capabilities to enable high accuracy measurement in the resonance region with narrow neutron pulse and high electron beam power. Located at a major US technical university, this project provides a needed US nuclear data capability for both research and education, and also includes external users and industrial applications.

43 PARTICLE ACCELERATORS↗

Multiplexer System for the SPEAR3 Booster BPM Upgrade

BPM measurements in booster synchrotrons are often only critical during accelerator commissioning or when a problem occurs. As a result, many facilities do not make large investments in booster BPM signal processors; they either have very few BPMs and/or use older generation processors. The SPEAR3 booster BPM processor system, for instance, has operated since 1990 with commercial multiplexers to switch between BPM button signals into a single dated analog BPM processor that was developed at SLAC*. This system has reached its end-of-life so we are in the process of upgrading to modern multiplexers that feed a pair of turn-by-turn Libera SPARK-ERXR processors. This low-cost solution gives us the ability to arbitrarily multiplex between BPM signals during the energy ramp with modern BPM processors. The system can either measure 2 BPMs turn-by-turn in parallel during the entire energy ramp, or sequentially measure all BPMs (2 at a time) at different time slices within the ramp. Here we show measurements of the MiniCircuits switch we chose as well as our architecture for the upgrade.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Multibunch Studies for LCLS-II High Energy Upgrade

The Linac Coherent Light Source (LCLS) X-ray free-electron laser at SLAC is being upgraded to LCLS-II with a superconducting linac and 1 MHz bunch repetition rate. The proposed high-energy upgrade (LCLS-II-HE) will increase the beam energy from 4 to 8 GeV, extending the reach of accessible X-ray photon energies. With the increased repetition rate and longer linac of LCLS-II-HE, multi-bunch effects are of greater concern. We use recently introduced capabilities in the beam transport code ELEGANT to study dipole and monopole beam breakup effects for LCLS-II HE beam parameters. The results indicate that resonant dipole kicks have steady-state settle times on the order of 500 bunches or less and appear manageable. We also consider a statistical variation of the cavity frequencies and transverse offsets of cavities and quadrupoles. Resonant emittance growth driven by monopole kicks is found to be disrupted by frequency variation between cavities.

43 PARTICLE ACCELERATORS↗

FFA BEAM TRANSPORT DEMONSTRATION DEVELOPMENT FOR THE CEBAF 22 GeV UPGRADE

Jefferson Lab is planning an upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) to deliver highly polarized electron beams up to 22 GeV using Fixed- Field Alternating-gradient (FFA) magnets. As the application of FFA technology in the 10–22 GeV energy range is unprecedented, experimental validation is required prior to full-scale implementation. To support this effort, a dedicated FFA test insert is proposed within the existing CEBAF infrastructure, with candidate locations in the Beam Switchyard (BSY) dump line or the Hall C beamline. The testbed will consist of a half or full FFA cell using combined-function permanent magnets and will enable systematic studies of beam transport, field quality, alignment, and magnet performance under realistic conditions. Operation with polarized beams in the 5–11 GeV range will closely replicate the energy scaling of the full upgrade. This paper presents the current design status and layout options for the proposed FFA beam transport test line.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex

The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam power from the Fermilab Main Injector, over the energy range 60 - 120 GeV, at the start of operation of the LBNF/DUNE program. PIP-II provides a variety of upgrade paths to higher beam power from the Main Injector, as demanded by the neutrino science program and as recommended by the 2014 P5 report. Delivering more than 2 MW to the LBNF target in the future will require a replacement of the existing Booster. This report outlines a cost-effective Booster replacement option and an upgrade path for the Fermilab Accelerator Complex to attain 2.4-MW beam power on the LBNF target, as well as to retain the capability to provide 8-GeV proton beams to the existing Fermilab Muon Campus via the existing Recycler ring. Its cost-effectiveness is achieved by: (1) using a small-diameter metallic vacuum chamber in the Booster replacement and (2) reusing the existing Recycler ring. Reusing the Recycler ring may be of particular advantage since it is presently employed to deliver 8-GeV beams to the Muon Campus experiments. The present concept also retains such a capability.

43 PARTICLE ACCELERATORS↗