Search NASASearch

SEARCH · Search NASA

Results for “electrical system testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,816 records · Page 10

20V, 40 Ah Lithium Ion Polymer Battery for the Spacesuit

Objective: Consider a new battery design for EMU. Results: a) Electrovaya s aerospace cell production line is improving, but must further improve to achieve acceptable reliability; b) Completed functional, vibration, and thermal cycling of LIB; c) So far, electrical safety tests have produced good results; d) Completed functional, vibration, thermal cycling, power quality and EMI of LIB Charger; e) Completed CDR on 9/23/04; and f) Manufacturing Readiness Review for flight cell/battery production scheduled for Dec 04.

Darcy, Eric

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Evaluating alternative steam generation pathways in the food industry

Steam generation in the food sector requires substantial energy and cost expenditures, requiring nearly half of its energy intake. Here, we used life cycle assessment and life cycle cost assessment to investigate the cost and energy impacts of steam generating alternatives: NG, biomass and hydrogen boilers and grid-supplied and self-generated electric steam generation systems (electric boilers, renewable thermal energy storage and industrial heat pumps). The analysis starts with a set of average U.S. conditions, where biomass boilers are the most cost-competitive alternative to NG. In a series of scenarios beyond average conditions, the analysis shows energy procurement costs dominate the total life cycle cost for all technologies and, unfortunately, are highly variable geographically and temporally, significantly affecting the viability of the alternatives. Results show that site-energy consumption ranges from 0.3 MMBtu/klb for industrial heat pumps to 1.6 MMBtu/klb for biomass boilers, with heat pumps achieving up to 78% lower energy use compared to natural gas systems. For the steam costs, the results show a range between $\$$8 and $\$$50/klb for NG, with biomass following closely ($\$$11 – $\$$44/klb) and grey hydrogen and IHP next ($\$$13 – $\$$33/klb and $\$$6 - $\$$78/klb), with cost reductions if IHP's cooling is utilized. Factors like operating hours, the need for cooling, and the ability to negotiate utility rates complicate the decision, making site-specific analyses critical. Therefore, we present a decision-making matrix to help manufacturers identify which steam generating technology is the best business decision for their situation. Overall, these results highlight the importance of steam generation for the facility's organizational goals, as well as the criticality of conducting individual site analyses.

Biomass boilers

A Unified Scaling Framework for Comparative Analysis of Major Electrical Machine Topologies

This paper presents a unified framework for comparing major electrical machine topologies under identical output and thermal constraints, with emphasis on supply-chain-aware selection among rare-earth-intensive, reduced-rare-earth, and rare-earth-free solutions. Using power factor and air-gap flux density as the principal descriptors, the framework links topology choice to relative size, copper demand, magnet dependence, cost sensitivity, and inertia. To support robust early-stage screening, the deterministic scaling model is combined with uncertainty representation, Monte Carlo scenario propagation, and hesitationaware ranking. The results show that rare-earth-rich machines remain compact and dense, whereas reduced-rare-earth and rare-earth-free alternatives become more attractive under specific material-risk and cost scenarios.

Kumar, Praveen [ORNL] (ORCID:0000000291877857)

PACT Center: Perovskite PV Accelerator for Commercializing Technologies (Final Technical Report)

The Perovskite PV Accelerator for Commercializing Technologies (PACT) center was established in July 2021 as a national resource to accelerate the commercialization of perovskite photovoltaic (PV) technology in the United States. Since its inception, PACT has been led by Sandia National Laboratories (Sandia) in partnership with the National Laboratory of the Rockies (NLR), formerly known as NREL. From FY20-FY23, Los Alamos National Laboratory (LANL), CFV Labs, Black & Veatch (B&V), and the Electric Power Research Institute (EPRI) were part of the project team. LANL brought expertise in perovskite PV device designs and processing, CFV Labs (now GroundWork Renewables) provided initial indoor and outdoor measurement hardware technology, B&V led the initial effort on perovskite PV bankability, and EPRI worked on reviewing testing standards, identifying commercialization gaps, and helping to run PACT’s Industry Advisory Board, a group including representatives from commercial testing labs, independent engineering firms, insurance companies, state regulators, and electric utilities. To source perovskite PV module samples, PACT contracted with the University of North Carolina (UNC), the University of Toledo, the University of Washington, and SLAC/Stanford University to provide a steady stream of research-grade perovskite mini modules, enabling protocol development in advance of commercial module availability. The project period ran from July 1, 2021, through December 31, 2025, including a No Cost Extension. Starting in FY25, the project was continued as a Core Capability in the Lab Call portfolio and continues at a reduced budget with only Sandia and NLR as funded recipients. Notably, starting in FY25 PACT expanded its scope beyond MHP modules to accept all emerging PV mini module technologies for testing, including organic PV (OPV) and all-thin-film tandems, with the aim of supporting commercialization across the broader emerging PV ecosystem. With this change in scope the program was renamed the PV Accelerator for Commercializing Technologies, dropping perovskite from the name.

14 SOLAR ENERGY

Electric spiking activity in epithelial cells

Epithelial cells (human keratinocyte cells and the canine MDCK cell line), traditionally viewed as electrically non-self-excitable and involved primarily in physiological functions such as barrier presentation, absorption, secretion, and protection, are shown here to exhibit traveling extracellular electric charge when they recover from spatially focused, laser-induced wounding of confluent monolayers cultured on a multielectrode array chip. Voltage spikes measured on these electrodes display depolarization, repolarization, and hyperpolarization phases with amplitudes similar to the action potentials of neurons but with the markedly slower duration of 1 to 2 s. Some propagate distances up to hundreds of μm from the wound with a mean speed of around 10 mm s −1 . Generation and transmission of bioelectric signals are significantly influenced by the perturbation of mechanosensitive cationic ion channels. These direct measurements confirm bioelectric signaling that previous work has hypothesized to regulate epithelial cell development and may have relevance to the frequency parameter selection of bioelectric devices.

Science & Technology - Other Topics

Online Prediction of Battery Discharge and Estimation of Parasitic Loads for an Electric Aircraft

Predicting whether or not vehicle batteries contain sufficient charge to support operations over the remainder of a given flight plan is critical for electric aircraft. This paper describes an approach for identifying upper and lower uncertainty bounds on predictions that aircraft batteries will continue to meet output power and voltage requirements over the remainder of a flight plan. Battery discharge prediction is considered here in terms of the following components; (i) online battery state of charge estimation; (ii) prediction of future battery power demand as a function of an aircraft flight plan; (iii) online estimation of additional parasitic battery loads; and finally, (iv) estimation of flight plan safety. Substantial uncertainty is considered to be an irremovable part of the battery discharge prediction problem. However, high-confidence estimates of flight plan safety or lack of safety are shown to be generated from even highly uncertain prognostic predictions.

Battery Discharge Prediction

Space Telescope Optical Telescope Assembly/Scientific Instruments: Phase B - Preliminary Design and Program Definition Study: Volume 2A - Planetary Camera

Development of the F/48, F/96 Planetary Camera for the Large Space Telescope is discussed. Instrument characteristics, optical design, and CCD camera submodule thermal design are considered along with structural subsystem and thermal control subsystem. Weight, electrical subsystem, and support equipment requirements are also included.

Itek Optical Systems

Battery Evaluation Profiles for X-57 and Future Urban Electric Aircraft

Battery energy density is one of the most critical design parameters for sizing all-electric aircraft, however it’s easily overestimated. Establishing the effective, usable energy density is confused by varying degrees of margin needed to account for structural and thermal management between different cell chemistry and pack designs. Therefore, a better methodology is needed to fairly compare emerging battery technologies for electric aircraft. Currently, there is a loss of critical information when vehicle trade studies are performed using “nominal” published cell-level performance metrics. Aircraft power demands rarely match these nominal power profiles, and aircraft designers lack the ability to accurately simulate the battery performance and temperature off-nominally unless the battery chemistry is well established. Conversely, battery suppliers have no generalized reference cases to publish more realistic performance metrics. This can lead to poor assumptions, such as aircraft studies assuming a fixed discharge efficiency of a battery, when in reality the usable energy in a pack is dependent on the power and thermal profile. Information needed to properly assess weight penalties for thermal management is also typically poorly characterized when assessing candidate batteries. This paper serves to better inform battery development, and similarly, provide aircraft designers with more realistic assumptions for applying knockdown margins in their designs. Detailed power and thermal performance estimates are provided, which provide a starting point for sizing power and thermal budgets using experimentally derived battery models. Results show that the X-57 battery-to-shaft efficiency is 77.3% for a particular optimized mission. Considering a 25% reserve on the battery capacity, this means that only roughly half of the original 55.3kWh ‘nominal’ pack energy can be converted to useful work during a mission. Further estimates on a clean-sheet VTOL optimization show an average 82.7% battery-to-shaft efficiency, using 98% peak efficiency inverters and 97.4% peak efficiency motors. Although higher battery efficiencies are possible, the resulting weight penalty negates improvement in vehicle performance. These trade-offs and resulting power profiles are provided as a starting point to better assess future battery designs.

Battery

Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities 2026 Update

Electricity demand from large-load customers such as data centers is projected to grow significantly in the near term. While these large loads play an important role in advancing technology innovation and economic growth in the United States, meeting their energy needs requires utilities and regulators to consider important operational and financial risks, such as insufficient energy supply or underutilized investments, that can impact all customers. This paper builds on similar research published in January 2025, providing an overview of how utilities and regulators are managing these risks through different tariffs, including rate structures and electric service agreements. Regulators, utilities, customers, and other stakeholders can use this paper as a foundation when discussing issues and sharing perspectives on developing or reviewing large-load tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION