Search NASASearch

SEARCH · Search NASA

Results for “reference systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Photovoltaic and thermal energy conversion for solar powered satellites

A summary is provided concerning the most important aspects of present investigations related to a use of solar power satellites (SPS) as a future source of terrestrial energy. General SPS characteristics are briefly considered, early work is reviewed, and a description of current investigations is presented. System options presently under study include a photovoltaic array, a thermionic system, and a closed Brayton cycle. Attention is given to system reference options, basic building blocks, questions of system analysis and engineering, photovoltaic conversion, and the utility interface. It is concluded that an SPS may be cost effective compared to terrestrial systems by 1995.

Von Tiesenhausen, G. F.

Evolution of a high-performance storage system based on magnetic tape instrumentation recorders

In order to provide transparent access to data in network computing environments, high performance storage systems are getting smarter as well as faster. Magnetic tape instrumentation recorders contain an increasing amount of intelligence in the form of software and firmware that manages the processes of capturing input signals and data, putting them on media and then reproducing or playing them back. Such intelligence makes them better recorders, ideally suited for applications requiring the high-speed capture and playback of large streams of signals or data. In order to make recorders better storage systems, intelligence is also being added to provide appropriate computer and network interfaces along with services that enable them to interoperate with host computers or network client and server entities. Thus, recorders are evolving into high-performance storage systems that become an integral part of a shared information system. Data tape has embarked on a program with the Caltech sponsored Concurrent Supercomputer Consortium to develop a smart mass storage system. Working within the framework of the emerging IEEE Mass Storage System Reference Model, a high-performance storage system that works with the STX File Server to provide storage services for the Intel Touchstone Delta Supercomputer is being built. Our objective is to provide the required high storage capacity and transfer rate to support grand challenge applications, such as global climate modeling.

Peters, Bruce

A Cognitive Game Theoretic Analysis of Conflict Alerts in Air Traffic Control

The current research was motivated by the recommendation made by a joint Government/Industry committee to introduce a new traffic control system, referred to as the Free Flight. This system is designed to use recent new technology to facilitate efficient and safe air transportation. We addressed one of the major difficulties that arise in the design of this and similar multi-agent systems: the adaptive (and slippery) nature of human agents. To facilitate a safe and efficient design of this multi-agent system, designers have to rely on assessments of the expected behavior of the different agents under various scenarios. Whereas the behavior of the computerized agents is predictable, the behavior of the human agents (including air traffic controllers and pilots) is not. Experimental and empirical observations suggest that human agents are likely to adjust their behavior to the design of the system. To see the difficulty that the adaptive nature of human agents creates assume that a good approximation of the way operators currently behave is available. Given this information an optimal design can be performed. The problem arises as the human operator will learn to adjust their behavior to the new system. Following this adjustment process the assumptions made by the designer concerning the operators behavior will no longer be accurate and the system might reach a suboptimal state. In extreme situations these potential suboptimal states might involve unnecessary risk. That is, the fact that operators learn in an adaptive fashion does not imply that the system will become safer as they gain experience. At least in the context of Safety dilemmas, experience can lead to a pareto deficient risk taking behavior.

Erev, Ido

The Parachute System Recovery of the Orion Pad Abort Test 1

The Orion Pad Abort Test 1 was conducted at the US Army White Sands Missile range in May 2010. The capsule was successfully recovered using the original design for the parachute recovery system, referred to as the CEV Parachute Assembly System (CPAS). The CPAS was designed to a set of requirements identified prior to the development of the PA-1 test; these requirements were not entirely consistent with the design of the PA-1 test. This presentation will describe the original CPAS design, how the system was modified to accommodate the PA-1 requirements, and what special analysis had to be performed to demonstrate positive margins for the CPAS. The presentation will also discuss the post test analysis and how it compares to the models that were used to design the system.

Machin, Ricardo

The Potential for Health Monitoring in Expandable Space Modules: The Bigelow Expandable Activity Module on the ISS

Expandable modules for use in space and on the Moon or Mars offer a great opportunity for volume and mass savings in future space exploration missions. This type of module can be compressed into a relatively small shape on the ground, allowing them to fit into space vehicles with a smaller cargo/fairing size than a traditional solid, metallic structure based module would allow. In April 2016, the Bigelow Expandable Activity Module (BEAM) was berthed to the International Space Station (ISS). BEAM is the first human-rated expandable habitat/module to be deployed and crewed in space. BEAM is a NASA managed ISS payload project in partnership with Bigelow Aerospace. BEAM is intended to stay attached to ISS for an operational period of 2 years to help advance the technology readiness for future expandable modules. BEAM has been instrumented with a suite of space flight certified sensors systems which will help characterize the module's performance for thermal, radiation shielding and impact monitoring against potential Micro Meteoroid/Orbital Debris (MM/OD) providing fundamental information on the BEAM environment for potential health monitoring requirements and capabilities. This paper will provide an overview of how the sensors/instrumentation systems were developed, tested, installed and an overview of the current sensor system operations. It will also discuss how the MM/OD impact detection system referred to as the Distributed Impact Detection System (DIDS) data is being processed and reviewed on the ground by the principle investigators.

Wells, Nathan D.

Civil helicopter flight operations using differential GPS

The results of NASA flight trials of a dual-receiver differential global positioning system (DGPS) for civilian helicopter navigation applications, are presented. The three principal components of the DGPS system are described, including the GPS ground-reference system, a range tracking system, and an on-board sequential GPS receiver. The ground-based receiver in the DGPS operates at a known fixed location and receives C/A code signals from NAVSTAR satellites. System bias errors in the ground receiver are subtracted from the airborne solution for the navigational fix. Calculations of the differential bias error are carried out using an on-board PDP-11/34 M research computer. The ground-reference differential corrections for satellites are given in a table. It is shown that the differential correction signal of the DGPS contains only a small (0.1 rad/sec) high-frequency component which can be attributed to system error. A schematic diagram of the DGPS postflight data processing routine is provided.

Edwards, F. G.

Satellite power systems (SPS) concept definition study. Volume 1: Executive summary

System definition studies resulted in a further definition of the reference system using gallium arsenide solar arrays, analysis of alternative subsystem options for the reference concept, preliminary solid state microwave concept studies, and an environmental analysis of laser transmission systems. The special emphasis studies concentrated on satellite construction, satellite construction base definition, satellite construction base construction, and rectenna construction. Major emphasis in the transportation studies was put on definition of a two stage parallel burn, vertical takeoff/horizontal landing concept. The electric orbit transfer vehicle was defined in greater detail. Program definition included cost analyses and schedule definition.

Hanley, G. M.

Large Space Telescope support systems module thermal control

In 1982, an unmanned three-meter class Cassegrainian telescopic system referred to as the Large Space Telescope (LST) will be placed in earth orbit by the Shuttle. The LST consists of a telescope system and surrounding support structure that is referred to as the support system module (SSM). This paper summarizes the thermal control subsystem for several candidate SSM designs. Major emphasis has been given to the LST/SSM design concept that includes a thermally isolated aft cylinder compartment that contains subsystem components. Requirements, interfaces and thermal math modeling methods are presented. Analysis results demonstrate that a cold-biased thermal design using electrical heaters is promising.

Chapter, J. J.

Space shuttle: A comparison of wind tunnel facility data on the Grumman H-33 delta winged orbiter

A comparison of longitudinal and lateral directional stability and control characteristics of the Phase B Grumman H-33 orbiter configuration obtained from 6 tests conducted in 4 different facilities is presented. The H-33 orbiter configuration does not include drop tanks. Slope data are used as the medium for comparison. The slope data were computed using the SADSAC system and have been reduced to a common reference system. Data used for comparison were selected based on common configurations wherever possible. Where direct configuration comparisons were not possible, the parameters selected for comparison are regarded as insensitive to the noted differences. Factors considered in comparing the various data were scaling effects, balance operating ranges, balance sensitivities and control deflection accuracies. All factors considered, the comparison among data obtained from the various facilities is excellent. The minor differences in stability and control characteristics are well within the accuracy band of preliminary design model construction specifications.

Gyorfi, R. A.

Microwave system performance for a solar power satellite during startup/shutdown operations

The paper investigates the system performance and antenna characteristics under startup/shutdown conditions for the high power beam from a solar power satellite. Attention is given to the present microwave system reference configuration together with the dc power distribution system in the solar array and in the antenna. The pattern characteristics for the main beam, sidelobes, and grating lobes are examined for eight types of energizing configurations which include: random sequences, two types of concentric circles, and three types of line strips. In conclusion, it is noted that a proper choice of sequences should not cause environmental problems due to increased microwave radiation levels during the short time periods of energizing and de-energizing the antenna.

Arndt, G. D.

Self-replicating systems: A systems engineering approach

A first approach to conceptualize self-replicating systems was developed from past and present abstract theories. The engineering elements of self-replicating systems are defined in terms of a basic reference system. A number of options are investigated. The growth characteristics and their problems are analyzed, the mathematics of various exponential growth options are outlined, and the problems of universal parts production and systems closure are discussed. Selected areas of further study are defined and a 20 year development and demonstration program is presented.

Vontiesenhausen, G.

Lunar rovers and local positioning system

Telerobotic rovers equipped with adequate actuators and sensors are clearly necessary for extraterrestrial construction. They will be employed as substitutes for humans, to perform jobs like surveying, sensing, signaling, manipulating, and the handling of small materials. Important design criteria for these rovers include versatility and robustness. They must be easily programmed and reprogrammed to perform a wide variety of different functions, and they must be robust so that construction work will not be jeopardized by parts failures. The key qualities and functions necessary for these rovers to achieve the required versatility and robustness are modularity, redundancy, and coordination. Three robotic rovers are being built by CSC as a test bed to implement the concepts of modularity and coordination. The specific goal of the design and construction of these robots is to demonstrate the software modularity and multirobot control algorithms required for the physical manipulation of constructible elements. Each rover consists of a transporter platform, bus manager, simple manipulator, and positioning receivers. These robots will be controlled from a central control console via a radio-frequency local area network (LAN). To date, one prototype transporter platform frame was built with batteries, motors, a prototype single-motor controller, and two prototype internal LAN boards. Software modules were developed in C language for monitor functions, i/o, and parallel port usage in each computer board. Also completed are the fabrication of half of the required number of computer boards, the procurement of 19.2 Kbaud RF modems for inter-robot communications, and the simulation of processing requirements for positioning receivers. In addition to the robotic platform, the fabrication of a local positioning system based on infrared signals is nearly completed. This positioning system will make the rovers into a moving reference system capable of performing site surveys. In addition, a four degree mechanical manipulator especially suited for coordinated teleoperation was conceptually designed and is currently being analyzed. This manipulator will be integrated into the rovers as their end effector. Twenty internal LAN cards fabricated by a commercial firm are being used, a prototype manipulator and a range finder for a positioning system were built, a prototype two-motor controller was designed, and one of the robots is performing its first telerobotic motion. In addition, the robots' internal LAN's were coordinated and tested, hardware design upgrades based on fabrication and fit experience were completed, and the positioning system is running. The rover system is able to perform simple tasks such as sensing and signaling; coordination systems which allow construction tasks to begin were established, and soon coordinated teams of robots in the laboratory will be able to manipulate common objects.

Avery, James

C-Band Airport Surface Communications System Standards Development, Phase I

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." The proposed future C-band (5091- to 5150-MHz) airport surface communication system, referred to as the Aeronautical Mobile Airport Communications System (AeroMACS), is anticipated to increase overall air-to-ground data communications systems capacity by using a new spectrum (i.e., not very high frequency (VHF)). Although some critical services could be supported, AeroMACS will also target noncritical services, such as weather advisory and aeronautical information services as part of an airborne System Wide Information Management (SWIM) program. AeroMACS is to be designed and implemented in a manner that will not disrupt other services operating in the C-band. This report defines the AeroMACS concepts of use, high-level system requirements, and architecture; the performance of supporting system analyses; the development of AeroMACS test and demonstration plans; and the establishment of an operational AeroMACS capability in support of C-band aeronautical data communications standards to be advanced in both international (International Civil Aviation Organization, ICAO) and national (RTCA) forums. This includes the development of system parameter profile recommendations for AeroMACS based on existing Institute of Electrical and Electronics Engineering (IEEE) 802.16e- 2009 standards

Hall, Edward

Performance analysis and simulation of the SPS reference phase control system

Key results pertinent to the SPS reference phase control system design are summarized. These results are a consequence of extensive system engineering tradeoffs provided via mathematical modeling, optimization, analysis and the development/utilization of a computer simulation tool called SOLARSIM.

Lindsey, W. C.

Performance Testing of TRL4-6 LISA Laser System

The Laser Interferometer Space Antenna (LISA) is an ESA-led future mission to measure gravitational waves from astronomical sources in space. LISA has been adopted as a formal mission by ESA in January 2024, and is expected to become a formal project at NASA within 2024. The laser system (LS), which includes four laser heads (LH) each containing a laser optical module (LOM) and laser electronics module (LEM), a frequency reference system (FRS, optical frequency reference) and four power monitor detectors (PMON), is one of the three U.S. contributions to LISA from NASA. The Lasers and Electro-Optics Branch at NASA GSFC has been developing and managing the design of the LISA LS. Currently, the TRL (technology readiness level) of the NASA LISA laser system is transitioning from 4 to 6. TRL 4/5 LISA LOM was sent to ESA in early 2023 and has undergone optical performance testing. [1] By late summer of 2024, NASA plans to deliver the TRL 6 LOM to ESA for performance evaluation. Since the delivery of the TRL4/5 LOM to ESA, we have taken steps to advance the TRL of the overall LS and have also started end-to-end system level testing involving other subsystems. They include 1) optical performance test of TRL6 LOM and TRL 5 LEM under thermal cycling, 2) end-to-end test of the laser head (LH) and the GSE (ground support equipment) FRS, driven by TRL 4 FRS electronics (FRS-E) provided by Ball Aerospace, 3) end-to-end test of the laser head (LH) with the GSE phase meter system (PMS) provided by Albert Einstein Institute, and 4) optical performance test of the LH with the PMON subsystem developed by NASA. The FRS, PMS, and PMON provide necessary frequency stability, relative phase stability between lasers, and output power stability, respectively. Since they are all vital for the sensitive laser interferometry performed in LISA, it is necessary to perform these system level testing by combining the LH and other subsystems, and to prove the optical performance at an early stage during the LS development. Our recent work has successfully demonstrated the intra-connectivity of the LS, as well as critical external interface with the PMS to meet the LISA’s performance requirements. In this talk, we will report on the latest status of the LH testing and system level test. We will also discuss the paths to bring each subsystem to TRL6+ and plans for future system level testing.

LISA