Nevada National Security Site - E-Tunnel Wastewater Disposal System: Fourth Quarter 2019
This report includes the results of monthly inspections and monitoring for October, November, and December 2019. Monthly inspections and monitoring were conducted on October 15, November 26, and December 18, 2019. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurements of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the E-Tunnel Wastewater Disposal System (ETDS) discharge. Annual sample results of the effluent water from the ETDS are also included in this report. The effluent sample was collected on September 11, 2019, and analyzed for the parameters listed in Table 1-B of Permit NEV 96021. In addition, Permit NEV 96021 requires the collection and analysis of representative groundwater samples from Well ER 12-1 every 24 months. This summary report provides the information pertaining to the sampling and analysis of groundwater samples collected on April 10, 2019.