Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerators,ACCPHY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

The Injection System of the INFN-SuperB Factory Project: Preliminary Design

The ultra high luminosity B-factory (SuperB) project of INFN requires a high performance and reliable injection system, providing electrons at 4 GeV and positrons at 7 GeV, to fulfil the very tight requirements of the collider. Due to the short beam lifetime, continuous injection of electron and positron bunches in both LER and HER rings is necessary to maintain an high average luminosity. Polarized electrons are required for experiments and must be delivered by the injection system, due to the beam lifetime shorter than the ring polarization build-up: they will be produced by means of a SLAC-SLC polarized gun. The emittance and the energy spread of the e{sup -}/e{sup +} beams are reduced in a 1 GeV Damping Ring (DR) before injection in the main rings. Two schemes for positron production are under study, one with e{sup -}/e{sup +} conversion at low energy (< 1 Gev) and one with conversion at 6 GeV and a recirculation line to bring the positrons back to the DR. Acceleration through the Linac is provided by a 2856 MHz RF system made of travelling wave (TW), room temperature accelerating structures.

43 PARTICLE ACCELERATORS↗

Advances in X-Band TW Accelerator Structures Operating in the 100 MV/M Regime

A CERN-SLAC-KEK collaboration on high gradient X-band accelerator structure development for CLIC has been ongoing for three years. The major outcome has been the demonstration of stable 100 MV/m gradient operation of a number of CLIC prototype structures. These structures were fabricated using the technology developed from 1994 to 2004 for the GLC/NLC linear collider initiative. One of the goals has been to refine the essential parameters and fabrication procedures needed to realize such a high gradient routinely. Another goal has been to develop structures with stronger dipole mode damping than those for GLC/NLC. The latter requires that the surface temperature rise during the pulse be higher, which may increase the breakdown rate. One structure with heavy damping has been RF processed and another is nearly finished. The breakdown rates of these structures were found to be higher by two orders of magnitude compared to those with equivalent acceleration mode parameters but without the damping features. This paper presents these results together with some of the earlier results from non-damped structures.

43 PARTICLE ACCELERATORS↗

500 MW X-Band RF System of a 0.25 GeV Electron LINAC for Advanced Compton Scattering Source Application

A Mono-Energetic Gamma-Ray (MEGa-Ray) Compton scattering light source is being developed at LLNL in collaboration with the SLAC National Accelerator Laboratory. The electron beam for the Compton scattering interaction will be generated by a X-band RF gun and a X-band LINAC at the frequency of 11.424 GHz. High power RF in excess of 500 MW is needed to accelerate the electrons to energy of 250 MeV or greater for the interaction. Two high power klystron amplifiers, each capable of generating 50 MW, 1.5 msec pulses, will be the main high power RF sources for the system. These klystrons will be powered by state of the art solid-state high voltage modulators. A RF pulse compressor, similar to the SLED II pulse compressor, will compress the klystron output pulse with a power gain factor of five. For compactness consideration, we are looking at a folded waveguide setup. This will give us 500 MW at output of the compressor. The compressed pulse will then be distributed to the RF gun and to six traveling wave accelerator sections. Phase and amplitude control are located at the RF gun input and additional control points along the LINAC to allow for parameter control during operation. This high power RF system is being designed and constructed. In this paper, we will present the design, layout, and status of this RF system.

43 PARTICLE ACCELERATORS↗

Advanced X-Band Test Accelerator for High Brightness Electron and Gamma Ray Beams

In support of Compton scattering gamma-ray source efforts at LLNL, a multi-bunch test stand is being developed to investigate accelerator optimization for future upgrades. This test stand will enable work to explore the science and technology paths required to boost the current 10 Hz monoenergetic gamma-ray (MEGa-Ray) technology to an effective repetition rate exceeding 1 kHz, potentially increasing the average gamma-ray brightness by two orders of magnitude. Multiple bunches must be of exceedingly high quality to produce narrow-bandwidth gamma-rays. Modeling efforts will be presented, along with plans for a multi-bunch test stand at LLNL. The test stand will consist of a 5.5 cell X-band rf photoinjector, single accelerator section, and beam diagnostics. The photoinjector will be a high gradient standing wave structure, featuring a dual feed racetrack coupler. The accelerator will increase the electron energy so that the emittance can be measured using quadrupole scanning techniques. Multi-bunch diagnostics will be developed so that the beam quality can be measured and compared with theory. Design will be presented with modeling simulations, and layout plans.

43 PARTICLE ACCELERATORS↗

Ultra-High Gradient Compact S-Band Linac for Laboratory and Industrial Applications

There is growing demand from the industrial and research communities for high gradient, compact RF accelerating structures. The commonly used S-band SLAC-type structure has an operating gradient of only about 20 MV/m; while much higher operating gradients (up to 70 MV/m) have been recently achieved in X-band, as a consequence of the substantial efforts by the Next Linear Collider (NLC) collaboration to push the performance envelope of RF structures towards higher accelerating gradients. Currently however, high power X-band RF sources are not readily available for industrial applications. Therefore, RadiaBeam Technologies is developing a short, standing wave S-band structure which uses frequency scaled NLC design concepts to achieve up to a 50 MV/m operating gradient at 2856 MHz. The design and prototype commissioning plans are presented.

43 PARTICLE ACCELERATORS↗

Fabrication Technologies of the High Gradient Accelerator Structures at 100MV/M Range

A CERN-SLAC-KEK collaboration on high gradient X-band structure research has been established in order to demonstrate the feasibility of the CLIC baseline design for the main linac stably operating at more than 100 MV/m loaded accelerating gradient. Several prototype CLIC structures were successfully fabricated and high power tested. They operated at 105 MV/m with a breakdown rate that meets the CLIC linear collider specifications of < 5 x 10{sup -7}/pulse/m. This paper summarizes the fabrication technologies including the mechanical design, precision machining, chemical cleaning, diffusion bonding as well as vacuum baking and all related assembly technologies. Also, the tolerances control, tuning and RF characterization will be discussed.

43 PARTICLE ACCELERATORS↗

RF Choke for Standing Wave Structures and Flanges

SLAC participates in the U.S. High Gradient collaboration whose charter includes basic studies of rf breakdown properties in accelerating structures. These studies include experiments with different materials and construction methods for single cell standing wave accelerating structures. The most commonly used method of joining cells of such structures is the high temperature bonding and/or brazing in hydrogen and/or vacuum. These high temperature processes may not be suitable for some of the new materials that are under consideration. We propose to build structures from cells with an rf choke, taking the cell-to-cell junction out of the electromagnetic field region. These cells may be clamped together in a vacuum enclosure, the choke joint ensuring continuity of rf currents. Next, we propose a structure with a choke joint in a high gradient cell and a view port which may allow us microscopic, in-situ observation of the metal surface during high power tests. And third, we describe the design of a TM01 choke flange for these structures.

08 HYDROGEN↗

A 12 GHz RF Power Source for the CLIC Study

The CLIC RF frequency has been changed in 2008 from the initial 30 GHz to the European X-band 11.9942 GHz permitting beam independent power production using klystrons for CLIC accelerating structure testing. A design and fabrication contract for five klystrons at that frequency has been signed by different parties with SLAC. France (IRFU, CEA Saclay) is contributing a solid state modulator purchased in industry and specific 12 GHz RF network components to the CLIC study. RF pulses over 120 MW peak at 230 ns length will be obtained by using a novel SLED-I type pulse compression scheme designed and fabricated by IAP, Nizhny Novgorod, Russia. The X-band power test stand is being installed in the CLIC Test Facility CTF3 for independent structure and component testing in a bunker, but allowing, in a later stage, for powering RF components in the CTF3 beam lines. The design of the facility, results from commissioning of the RF power source and the expected performance of the Test Facility are reported.

43 PARTICLE ACCELERATORS↗

ILC RF System R and D

The Linac Group at SLAC is actively pursuing a broad range of R&D to improve the reliability and reduce the cost of the L-band (1.3 GHz) rf system proposed for the ILC linacs. Current activities include the long-term evaluation of a 120 kV Marx Modulator driving a 10 MW Multi-Beam Klystron, design of a second-generation Marx Modulator, testing of a sheet-beam gun and beam transport system for a klystron, construction of an rf distribution system with remotely-adjustable power tapoffs, and development of a system to combine the power from many klystrons in low-loss circular waveguide where it would be tapped-off periodically to power groups of cavities. This paper surveys progress during the past few years.

43 PARTICLE ACCELERATORS↗

Test and Development of a 10 MW 1.3 GHz Sheet Beam Klystron for the ILC

The SLAC National Accelerator Laboratory Klystron Department is developing a 10 MW, 5 Hz, 1.6 ms, 1.3 GHz plug-compatible Sheet-Beam Klystron as a less expensive and more compact alternative to the ILC baseline Multiple-Beam Klystron. Earlier this year a beam tester was constructed and began test. Device fabrication issues have complicated the analysis of the data collected from an intercepting cup for making beam quality measurements of the 130 A, 40-to-1 aspect ratio beam. Since the goal of the beam tester is to confirm 3d beam simulations it was necessary to rebuild the device in order to mitigate unwanted effects due to imperfect focusing construction. Measurements are underway to verify the results of this latest incarnation. Measurement will then be made of the beam after transporting through a drift tube and magnetic focusing system. In the klystron design, a TE oscillation was discovered during long simulation runs of the entire device which has since prompted two design changes to eliminate the beam disruption. The general theory of operation, the design choices made, and results of testing of these various devices will be discussed.

43 PARTICLE ACCELERATORS↗

Intensity Effects of the FACET Beam in the SLAC Linac

The beam for FACET (Facility for Advanced aCcelerator Experimental Tests) at SLAC requires an energy-time correlation ('chirp') along the linac, so it can be compressed in two chicanes, one at the midpoint in sector 10 and one W-shaped chicane just before the FACET experimental area. The induced correlation has the opposite sign to the typical used for BNS damping, and therefore any orbit variations away from the center kick the tail of the beam more than the head, causing a shear in the beam and emittance growth. Any dispersion created along the linac has similar effects due to the high (>1.2% rms) energy spread necessary for compression. The initial huge emittances could be reduced by a factor of 10, but were still bigger than expected by a factor of 2-3. Normalized emittance of 3 {micro}m-rad in Sector 2 blew up to 150 {micro}m-rad in Sector 11 but could be reduced to about 6-12 {micro}m-rad, for the vertical plane although the results were not very stable. Investigating possible root causes for this, we found locations where up to 10 mm dispersion was created along the linac, which were finally verified with strong steering and up to 7 mm settling of the linac accelerator at these locations.

43 PARTICLE ACCELERATORS↗

An Undulator Based Polarized Positron Source for CLIC

A viable positron source scheme is proposed that uses circularly polarized gamma rays generated from the main 250 GeV electron beam. The beam passes through a helical superconducting undulator with a magnetic field of {approx} 1 Tesla and a period of 1.15 cm. The gamma-rays produced in the undulator in the energy range between {approx} 3 MeV - 100 MeV will be directed to a titanium target and produce polarized positrons. The positrons are then captured, accelerated and transported to a Pre-Damping Ring (PDR). Detailed parameter studies of this scheme including positron yield, and undulator parameter dependence are presented. Effects on the 250 GeV CLIC main beam, including emittance growth and energy loss from the beam passing through the undulator are also discussed.

43 PARTICLE ACCELERATORS↗

Compact Couplers for Photonic Crystal Laser-Driven Accelerator Structures

Photonic crystal waveguides are promising candidates for laser-driven accelerator structures because of their ability to confine a speed-of-light mode in an all-dielectric structure. Because of the difference between the group velocity of the waveguide mode and the particle bunch velocity, fields must be coupled into the accelerating waveguide at frequent intervals. Therefore efficient, compact couplers are critical to overall accelerator efficiency. We present designs and simulations of high-efficiency coupling to the accelerating mode in a three-dimensional photonic crystal waveguide from a waveguide adjoining it at 90{sup o}. We discuss details of the computation and the resulting transmission. We include some background on the accelerator structure and photonic crystal-based optical acceleration in general.

43 PARTICLE ACCELERATORS↗

Upgrade of the Drive LINAC for the AWA Facility Dielectric Two-Beam Accelerator

We report on the design of a seven-cell, standing-wave, 1.3-GHz rf cavity and the associated beam dynamics studies for the upgrade of the drive beamline LINAC at the Argonne Wakefield Accelerator (AWA) facility. The LINAC design is a compromise between single-bunch operation (100 nC {at} 75 MeV) and minimization of the energy droop along the bunch train during bunch-train operation. The 1.3-GHz drive bunch-train target parameters are 75 MeV, 10-20-ns macropulse duration, and 16 x 60 nC microbunches; this is equivalent to a macropulse current and beam power of 80 A and 6 GW, respectively. Each LINAC structure accelerates approximately 1000 nC in 10 ns by a voltage of 11 MV at an rf power of 10 MW. Due to the short bunch-train duration desired ({approx}10 ns) and the existing frequency (1.3 GHz), compensation of the energy droop along the bunch train is difficult to accomplish by means of the two standard techniques: time-domain or frequency-domain beam loading compensation. Therefore, to minimize the energy droop, our design is based on a large stored energy rf cavity. In this paper, we present our rf cavity optimization method, detailed rf cavity design, and beam dynamics studies of the drive beamline.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Linear Collider Test Facility: Twiss Parameter Analysis at the IP/Post-IP Location of the ATF2 Beam Line

At the first stage of the ATF2 beam tuning, vertical beam size is usually bigger than 3 {micro}m at the IP. Beam waist measurements using wire scanners and a laser wire are usually performed to check the initial matching of the beam through to the IP. These measurements are described in this paper for the optics currently used ({beta}{sub x} = 4cm and {beta}{sub y} = 1mm). Software implemented in the control room to automate these measurements with integrated analysis is also described. Measurements showed that {beta} functions and emittances were within errors of measurements when no rematching and coupling corrections were done. However, it was observed that the waist in the horizontal (X) and vertical (Y) plane was abnormally shifted and simulations were performed to try to understand these shifts. They also showed that multiknobs are needed in the current optics to correct simultaneously {alpha}{sub x}, {alpha}{sub y} and the horizontal dispersion (D{sub x}). Such multiknobs were found and their linearity and orthogonality were successfully checked using MAD optics code. The software for these multiknobs was implemented in the control room and waist scan measurements using the {alpha}{sub y} knob were successfully performed.

43 PARTICLE ACCELERATORS↗

Lattice Calibration with Turn-By-Turn BPM Data

Turn-by-turn beam position monitor (BPM) data from multiple BPMs are fitted with a tracking code to calibrate magnet strengths in a manner similar to the well known LOCO code. Simulation shows that this turn-by-turn method can be a quick and efficient way for optics calibration. The method is applicable to both linacs and ring accelerators. Experimental results for a section of the SPEAR3 ring is also shown.

43 PARTICLE ACCELERATORS↗

Multi Optical Transition Radiation System for ATF2

In this paper we describe the design, installation and first calibration tests of a Multi Optical Transition Radiation System in the beam diagnostic section of the Extraction (EXT) line of ATF2, close to the multi wire scanner system. This system will be a valuable tool for measuring beam sizes and emittances coming from the ATF Damping Ring. With an optical resolution of about 2 {micro}m an original OTR design (OTR1X) located after the septum at the entrance of the EXT line demonstrated the ability to measure a 5.5 {micro}m beam size in one beam pulse and to take many fast measurements. This gives the OTR the ability to measure the beam emittance with high statistics, giving a low error and a good understanding of emittance jitter. Furthermore the nearby wire scanners will be a definitive test of the OTR as a beam emittance diagnostic device. The multi-OTR system design proposed here is based on the existing OTR1X.

43 PARTICLE ACCELERATORS↗

Design for a Longitudinal Density Monitor for the LHC

Synchrotron radiation is currently used on the LHC for beam imaging and for monitoring the proton population in the 3 microsecond abort gap. In addition to these existing detectors, a study has been initiated to provide longitudinal density profiles of the LHC beams with a high dynamic range and a 50ps time resolution. This would allow for the precise measurement both of the bunch shape and the number of particles in the bunch tail or drifting into ghost bunches. A solution is proposed based on counting synchrotron light photons with two fast avalanche photo-diodes (APD) operated in Geiger mode. One is free-running but heavily attenuated and can be used to measure the core of the bunch. The other is much more sensitive, for measurement of the bunch tails, but must be gated off during the passage of the bunch to prevent the detector from being swamped. An algorithm is then applied to combine the two measurements and correct for the detector dead-time, afterpulsing and pile-up effects. Initial results from laboratory testing of this system are described here.

43 PARTICLE ACCELERATORS↗