Search NASA⌕ Search

SEARCH · Search NASA

Results for “CHECKOUT EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Independent Orbiter Assessment (IOA): Analysis of the instrumentation subsystem

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The independent analysis results for the Instrumentation Subsystem are documented. The Instrumentation Subsystem (SS) consists of transducers, signal conditioning equipment, pulse code modulation (PCM) encoding equipment, tape recorders, frequency division multiplexers, and timing equipment. For this analysis, the SS is broken into two major groupings: Operational Instrumentation (OI) equipment and Modular Auxiliary Data System (MADS) equipment. The OI equipment is required to acquire, condition, scale, digitize, interleave/multiplex, format, and distribute operational Orbiter and payload data and voice for display, recording, telemetry, and checkout. It also must provide accurate timing for time critical functions for crew and payload specialist use. The MADS provides additional instrumentation to measure and record selected pressure, temperature, strain, vibration, and event data for post-flight playback and analysis. MADS data is used to assess vehicle responses to the flight environment and to permit correlation of such data from flight to flight. The IOA analysis utilized available SS hardware drawings and schematics for identifying hardware assemblies and components and their interfaces. Criticality for each item was assigned on the basis of the worst-case effect of the failure modes identified.

Howard, B. S.↗

STS-74 Mission Highlights Resource Tape

The flight crew of the STS-74 Space Shuttle Orbiter Atlantis Cmdr. Ken Cameron, Pilot Jim Halsell, and Mission Specialists Chris Hadfield, Jerry Ross, and William McArthur present an overview of their flight mission, whose primary objective is the rendezvous and space docking with the Russian Mir Space Station. Video film footage includes the following: prelaunch and launch activities; shuttle launch; in-orbit rendezvous; installation of the Russian-made docking module; in-orbit docking between Mir and the orbiter; general crew activities; transfer of supplies, equipment, and a crystal growth experiment to Mir; data collection from Mir thruster firings; undocking maneuvers and a Mir fly around; pre-return checkout of flight systems; and the reentry and landing of the orbiter. Earth views include horizon sunsets, atmospheric boundary layers, and a variety of geographical location footage (New Orleans; Atlanta; James Bay, Canada; Poland; Turkey; Mt. Pinatubo, Philippines; Salt Lake City, Utah; and Colorado).

Source record↗

The 25 kW power module evolution study. Part 3: Conceptual design for power module evolution. Volume 6: WBS and dictionary

Program elements of the power module (PM) system, are identified, structured, and defined according to the planned work breakdown structure. Efforts required to design, develop, manufacture, test, checkout, launch and operate a protoflight assembled 25 kW, 50 kW and 100 kW PM include the preparation and delivery of related software, government furnished equipment, space support equipment, ground support equipment, launch site verification software, orbital verification software, and all related data items.

Source record↗

STARPAHC. Part 1: Final summary report

A ground-based demonstration of IMBLMS Space Technology was conducted in a remote geographical area of the U.S. The STARPAHC program, designed to improve the capability for delivering health care to the Papago Indians, is divided into three areas: (1) design and definition; (2) system assembly, test, installation, checkout, and training; and (3) operations and evaluation. The accomplishments achieved in the program are summarized emphasizing system requirements in the areas of communication, specialized medical equipment, display, and computer software. Budgetary history and future cost plans are presented and planned activities are summarized.

Riley, F. E.↗

Evolution of solid rocket booster component testing

The evolution of one of the new generation of test sets developed for the Solid Rocket Booster of the U.S. Space Transportation System. Requirements leading to factory checkout of the test set are explained, including the evolution from manual to semiautomated toward fully automated status. Individual improvements in the built-in test equipment, self-calibration, and software flexibility are addressed, and the insertion of fault detection to improve reliability is discussed.

Lessey, Joseph A.↗

STS-96 FD Highlights and Crew Activities Report: Flight Day 10

On this tenth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen making final preparation for their return to Earth. Rominger Husband, and Ochoa checkout the flight control systems, perform hot-fired tests and verify the performance of Discovery's small steering jets. Jernigan and Tokarev stow all the equipment used in the mission. Payette deploys a small student-built payload called STARSHINE. The crew also tests all the communications channels.

Source record↗

System Administrator for LCS Development Sets

The Spaceport Command and Control System Project is creating a Checkout and Control System that will eventually launch the next generation of vehicles from Kennedy Space Center. KSC has a large set of Development and Operational equipment already deployed in several facilities, including the Launch Control Center, which requires support. The position of System Administrator will complete tasks across multiple platforms (Linux/Windows), many of them virtual. The Hardware Branch of the Control and Data Systems Division at the Kennedy Space Center uses system administrators for a variety of tasks. The position of system administrator comes with many responsibilities which include maintaining computer systems, repair or set up hardware, install software, create backups and recover drive images are a sample of jobs which one must complete. Other duties may include working with clients in person or over the phone and resolving their computer system needs. Training is a major part of learning how an organization functions and operates. Taking that into consideration, NASA is no exception. Training on how to better protect the NASA computer infrastructure will be a topic to learn, followed by NASA work polices. Attending meetings and discussing progress will be expected. A system administrator will have an account with root access. Root access gives a user full access to a computer system and or network. System admins can remove critical system files and recover files using a tape backup. Problem solving will be an important skill to develop in order to complete the many tasks.

Virtualizing in Linux↗

DSS 13 antenna subsystem automation

Unattended station operation was implemented that permitted full operational control from the network operations center (NOCC). Sensors were installed in the mechanical subsystem to monitor critical functions and to permit automated premission checkout of the subsystem, automated reaction to component failure, and identification of failed components under control of the antenna pointing computer. This monitoring installation is a prototype for monitoring equipment to be installed throughout the DSN.

Phillips, H.↗

Automated Plasma Spray (APS) process feasibility study

An automated plasma spray (APS) process was developed to apply two layer (NiCrAlY and ZrO2-12Y2O3) thermal barrier coatings to aircraft and stationary gas turbine engine blade airfoils. The APS process hardware consists of four subsystems: a mechanical positioning subsystem incorporating two interlaced six degree of freedom assemblies (one for coating deposition and one for coating thickness monitoring); a noncoherent optical metrology subsystem (for in process gaging of the coating thickness buildup at specified points on the specimen); a microprocessor based adaptive system controller (to achieve the desired overall thickness profile on the specimen); and commerical plasma spray equipment. Over fifty JT9D first stage aircraft turbine blade specimens, ten W501B utility turbine blade specimens and dozens of cylindrical specimens were coated with the APS process in preliminary checkout and evaluation studies. The best of the preliminary turbine blade specimens achieved an overall coating thickness uniformity of 53 micrometers (2.1 mils), much better than is achievable manually. Comparative evaluations of coating thickness uniformity for manually sprayed and APS coated specimens were performed. One of the preliminary turbine blade evaluation specimens was subjected to a torch test and metallographic evaluation. Some cylindrical specimens coated with the APS process survived up to 2000 cycles in subsequent burner rig testing.

Fetheroff, C. W.↗

Reliability history of the Apollo guidance computer

The Apollo guidance computer was designed to provide the computation necessary for guidance, navigation and control of the command module and the lunar landing module of the Apollo spacecraft. The computer was designed using the technology of the early 1960's and the production was completed by 1969. During the development, production, and operational phase of the program, the computer has accumulated a very interesting history which is valuable for evaluating the technology, production methods, system integration, and the reliability of the hardware. The operational experience in the Apollo guidance systems includes 17 computers which flew missions and another 26 flight type computers which are still in various phases of prelaunch activity including storage, system checkout, prelaunch spacecraft checkout, etc. These computers were manufactured and maintained under very strict quality control procedures with requirements for reporting and analyzing all indications of failure. Probably no other computer or electronic equipment with equivalent complexity has been as well documented and monitored. Since it has demonstrated a unique reliability history, it is important to evaluate the techniques and methods which have contributed to the high reliability of this computer.

Hall, E. C.↗

Operations Nomenclature [Annexes]

The purpose of Operations Nomenclature (OpNom) is to document methods for denoting all hardware and software and associated data referenced by operations products produced by the International Space Station (ISS) operations community. This includes Operations Data File (ODF) procedures, ground and onboard displays, mission rules, commands, messages and advisories, planning products, etc. This document applies to all agencies and individuals participating in or contributing to ISS mission operations. Mission operations include ground checkout, training, and simulations, as well as real-time activities. The document also applies to all operations documentation (paper or electronic media) and other products that refer to ISS-related equipment or activities.

Shannon, Yvette Y.↗

STS-106 Post Flight Presentation

Various shots highlight the STS-106 Atlantis mission. Footage shows the crew suiting up and leaving the Operations and Checkout (O&C) Building, the launch, and landing. Various on-orbit activities are seen, such as docking with the International Space Station (ISS), the spacewalks, eating, exercising, sleeping, and the crew transferring equipment from Atlantis to ISS. Shots show the southern lights and several shots of Earth can be seen, including views of the Mediterranean Sea and the Italian coastline. Footage shows some areas of interest on the ISS, such as the food preparation area, the sleeping rooms, and the toilet.

Source record↗

Orbital transfer vehicle launch operations study. Volume 2: Detailed summary

A series of Operational Design Drivers were identified. Several of these could have significant impact(s) on program costs. These recommendations, for example, include such items as: complete factory assembly and checkout prior to shipment to the ground launch site to make significant reductions in time required at the launch site as well as overall manpower required to do this work; minimize use of nonstandard equipment when orbiter provided equipment is available; and require commonality (or interchangeability) of subsystem equipment elements that are common to the space station, Orbit Maneuvering Vehicles, and/or Orbit Transfer Vehicles. Several additional items were identified that will require a significant amount of management attention (and direction) to resolve. Key elements of the space based processing plans are discussed.

Source record↗

A dynamic integrated test for the Space Shuttle

The dynamic integrated test (DIT) has been designed to perform a final checkout of the assembled Space Shuttle vehicle at Kennedy Space Center. The fact that the vehicle is not in a laboratory environment for the test represents a significant constraint in that the use of test equipment is extremely limited, and environment models cannot be used. In essence, the DIT causes the vehicle to believe that it is flying, so that hardware and software systems are exercised much as they would be for a real flight. This technique provides a tool for verifying such items as data bus activity patterns, critical timing sequences, software and hardware moding as a function of flight parameters, absence of EMI problems and other systems interactions which cannot be tested fully in the laboratory.

Brody, S.↗

Demonstration/Validation of Environmentally-Preferable Coatings for Launch Facilities

Kennedy Space Center (KSC) is responsible for a number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of an applied coating system. Applied coating systems work via a variety of methods (barrier, galvanic and/or inhibitor) and adhere to the substrate through a combination of chemical and physical bonds. Maintenance at KSC and other NASA Centers is governed by NASA-STD-50088 (Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment) which establishes practices for the protective coating of ground support equipment and related facilities used by or for NASA programs and projects. The Standard is for the design of non-flight hardware used to support the operations of receiving, transportation, handling, assembly, inspection, test, checkout, service, and launch of space vehicles and payloads at NASA launch, landing, or retrieval sites. These criteria and practices contained within the Standard may be used for items used at the manufacturing, development, and test sites upstream of the launch, landing, or retrieval sites. The objective of this effort is to demonstrate and validate environmentally-preferable alternatives in accordance with NASA-STD-50088 and KSC requirements which can then be added to the Approved Products List. This Test Protocol contains the critical requirements and tests necessary to qualify alternatives for structural steel applications. These tests were derived from engineering, performance, and operational impact (supportability) requirements defined by a consensus of KSC participants. A Test Report will document the results of the testing as well as any test modifications made during the execution of the testing. Users of this Test Protocol should check the project's Test Report for additional test details or minor modifications that may have been necessary in the execution of the testing. The technical stakeholders will have agreed upon test procedures modifications documented in the Test Report.

Lewis, Pattie↗

2021-2022 Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) 2021-2022 Long-Term Monitoring (LTM) activities and results of the 2023 DPT activities at three of the sites. The NASA IA LTM Program includes the following 14 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Orsino Storage Yard (ORSY) – SWMU 004 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Hypergol Maintenance Facility Hazardous Waste South Staging Area (HMF South) – SWMU 070 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank (UST) [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Groundwater levels were gauged at each site during the 2021 and 2022 LTM field activities. Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. Due to contract transitions and monitoring well installations, 2021 dry season activities were conducted during September 2021, while dry season activities for 2022 resumed in May 2022.

groundwater↗

Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the 2023 groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) Long-Term Monitoring (LTM) activities. Due to the project contract ending in 2023, this report presents one year of LTM activities instead of the two-year timeframe presented in previous reports. The NASA IA LTM Program includes the following 12 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. The current sampling frequencies for the NASA IA LTM sites are as follows: - FSA1 is sampled annually, alternating between wet and dry seasons. - GSSP is sampled annually during the wet season. - Seven sites are sampled biennially, alternating between the wet and dry seasons (RRLF, M505, O&C, VPF, LETF, MOBIL, and SSPF). - EHF and EDL are sampled biennially during the wet season. - KARS Park 1 is sampled once every 5 years.

remediation↗

Payload specialist station study. Volume 2, part 1: Preliminary design document

The details of six tasks of the payload Specialist Station study are discussed: (1) derive payload control and display requirements; (2) perform functional analyses; (3) perform system synthesis; (4) perform trade studies; (5) perform preliminary design; and (6) provide data format. Functional analysis diagrams were developed for the study payloads. These diagrams presented the payload's functional activities flow based on the six mission phases established. These phases are: (1) launch, ascent, orbit insertion; (2) on-orbit checkout and activation; (3) on-orbit operation; (4) deployment/retrieval; (5) on-orbit deactivation; and (6) descent, landing, post-landing. To perform system synthesis the widest variety of available hardware and software, as individual pieces of equipment and as systems, was investigated. The intent was to synthesize a complete AFD system or systems which could accommodate the range of requirements identified for the study missions.

Source record↗