Search NASA⌕ Search

SEARCH · Search NASA

Results for “DELTA LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Wind Prelaunch Mission Operations Report (MOR)

The National Aeronautics and Space Administration (NASA) Wind mission is the first mission of the Global Geospace Science (GGS) initiative. The Wind laboratory will study the properties of particles and waves in the region between the Earth and the Sun. Using the Moon s gravity to save fuel, dual lunar swing-by orbits enable the spacecraft to sample regions close to and far from the Earth. During the three year mission, Wind will pass through the bow shock of Earth's magnetosphere to begin a thorough investigation of the solar wind. Mission objectives require spacecraft measurements in two orbits: lunar swing- by ellipses out to distances of 250 Earth radii (RE) and a small orbit around the Lagrangian point L-l that remains between the Earth and the Sun. Wind will be placed into an initial orbit for approximately 2 years. It will then be maneuvered into a transition orbit and ultimately into a halo orbit at the Earth-Sun L-l point where it will operate for the remainder of its lifetime. The Wind satellite development was managed by NASA's Goddard Space Flight Center with the Martin Marietta Corporation, Astro-Space Division serving as the prime contractor. Overall programmatic direction was provided by NASA Headquarters, Office of Space Science. The spacecraft will be launched under a launch service contract with the McDonnell Douglas Corporation on a Delta II Expendable Launch Vehicle (ELV) within a November l-l4, 1994 launch window. The Wind spacecraft carries six U.S. instruments, one French instrument, and the first Russian instrument ever to fly on an American satellite. The Wind and Polar missions are the two components of the GGS Program. Wind is also the second mission of the International Solar Terrestrial Physics (ISTP) Program. The first ISTP mission, Geotail, is a joint project of the Institute of Space and Astronautical Science of Japan and NASA which launched in 1992. The Wind mission is planned to overlap Geotail by six months and Polar by one year. The Wind and Polar missions, together with the Geotail mission (launched on July 24, 1992) and supporting equatorial measurements, will provide simultaneous data to enable the study of solar wind input to the magnetosphere and key elements of the magnetospheric response: ring current energy storage, geomagnetic tail energy storage, and ionospheric energy input.

Source record↗

Planetary Mission Capability of Small Low Power Solar Electric Propulsion Systems

Planetary mission performance is presented for small, low power Solar Electric Propulsion spacecraft launched on a Delta II (7925) launch vehicle. The planetary missions presented in this paper are those that appear most attractive for a small, low-cost, solar electric propulsion mission.

power comet rendevous asteroid belt rendevous↗

(abstract) MEASURE-Jupiter: Low Cost Missions to Explore Jupiter in the Post-Galileo Era

MEASURE-Jupiter is a new mission concept for the exploration of giant planets, with initial application to Jupiter. By flying sets of lightweight spacecraft with highly focused measurement objectives, it is designed to break the apparent impass in giant planet exploration beyond Cassini. The MEASURE-Jupiter concept is characterized by: 1) intensive exploration of a giant planet system, 2) multiple small missions flown in focused waves using spacecraft costing $100M to $200M, and 3) mission sets launched every 2 to 3 years. Why Jupiter? Jupiter is the most complex planetary system in the Solar System with many scientifically intriguing bodies and phenomena to explore. The Galileo mission will scratch the surface of the exploration of Jupiter, posing many questions for the MEASURE-Jupiter missions to address. Jupiter is also the easiest planet in the Outer Solar System to reach, making possible flight times of 2 years and total mission durations of 3 years or less. Concept design studies have uncovered a number of scientifically rewarding, simple, low-cost mission options. These options have the additional attraction of being able to launch on 2-year trajectories to Jupiter with low-cost Delta II expendable launch vehicles. A partial list of mission concepts studied to date include: Io Very Close Flyby, Jupiter Close Polar Pass, Mini-Orbiters, and Galilean Satellite Penetrators. Key to the realization of the MEASURE-Jupiter missions is the judicious use of the new low power consuming advanced technology and applicable systems from the Pluto Fast Flyby mission spacecraft design. Foremost of the new technologies planned for inclusion are the elements of hybrid solar array/battery power systems which make it possible to perform the identified missions without the need for Radioactive Thermoelectric Generators (RTGs). This relieves the mission design of the attendant programmatic complexities, cost, and constraints attendant with the use of RTGs.

MEASURE-Jupiter Jupiter Pluto Fast Flyby low cost ↗

Spitzer Space Telescope mission design

This paper gives a description of the mission design, launch, orbit, and navigation results for the Spitzer space telescope mission. The Spitzer telescope was launched by the Delta II Heavy launch vehicle into a heliocentric Earth trailing orbit. This orbit is flown for the first time and will be used by several future astronomical missions such as Kepler, SIM, and LISA. This paper describes the launch strategy for a winter versus a summer launch and how it affects communications. It also describes how the solar orbit affects the design and operations of the Observatory. It describes the actual launch timeline, launch vehicle flight performance, and the long term behavior of the as flown orbit. It also provides the orbit knowledge from in-flight navigation data.

Mission Design↗

Update on the Wide-field Infrared Survey Explorer (WISE)

The Wide-field Infrared Survey Explorer (WISE), a NASA MIDEX mission, will survey the entire sky in four bands from 3.3 to 23 microns with a sensitivity 1000 times greater than the IRAS survey. The WISE survey will extend the Two Micron All Sky Survey into the thermal infrared and will provide an important catalog for the James Webb Space Telescope. Using 1024(sup 2) HgCdTe and Si:As arrays at 3.3, 4.7, 12 and 23 microns, WISE will find the most luminous galaxies in the universe, the closest stars to the Sun, and it will detect most of the main belt asteroids larger than 3 km. The single WISE instrument consists of a 40 cm diamond-turned aluminum afocal telescope, a two-stage solid hydrogen cryostat, a scan mirror mechanism, and reimaging optics giving 5 resolution (full-width-half-maximum). The use of dichroics and beamsplitters allows four color images of a 47' x47' field of view to be taken every 8.8 seconds, synchronized with the orbital motion to provide total sky coverage with overlap between revolutions. WISE will be placed into a Sun-synchronous polar orbit on a Delta 7320-10 launch vehicle. The WISE survey approach is simple and efficient. The three-axis-stabilized spacecraft rotates at a constant rate while the scan mirror freezes the telescope line of sight during each exposure. WISE has completed its mission Preliminary Design Review and its NASA Confirmation Review, and the project is awaiting confirmation from NASA to proceed to the Critical Design phase. Much of the payload hardware is now complete, and assembly of the payload will occur over the next year. WISE is scheduled to launch in late 2009; the project web site can be found at www.wise.ssl.berkeley.edu.

aster↗

Managing the Development of the Wide-Field Infrared Survey Explorer Mission

The Wide-field Infrared Survey Explorer (WISE), a NASA Medium-Class Explorer (MIDEX) mission, is surveying the entire sky in four bands from 3.4 to 22 microns with a sensitivity hundreds to hundreds of thousands times better than previous all-sky surveys at these wavelengths. The single WISE instrument consists of a 40 cm three-mirror anastigmatic telescope, a two-stage solid hydrogen cryostat, a scan mirror mechanism, and reimaging optics giving 6" resolution (full-width-half-maximum). WISE was placed into a Sun-synchronous polar orbit on a Delta II 7320 launch vehicle on December 14, 2009. NASA selected WISE as a MIDEX in 2002 following a rigorous competitive selection process. To gain further confidence in WISE, NASA extended the development period one year with an option to cancel the mission if certain criteria were not met. MIDEX missions are led by the principal investigator who in this case delegated day-to-day management to the project manager. With a cost cap and relatively short development schedule, it was essential for all WISE partners to work seamlessly together. This was accomplished with an integrated management team representing all key partners and disciplines. The project was developed on budget and on schedule in spite of the need to surmount significant technical challenges. This paper describes our management approach, key challenges and critical decisions made. Results are described from a programmatic, technical and scientific point of view. Lessons learned are offered for projects of this type.

cryogenic↗

Orion Exploration Flight Test 1 (EFT-1) Best Estimated Trajectory Development

The Orion Exploration Flight Test 1 (EFT-1) mission successfully flew on Dec 5, 2014 atop a Delta IV Heavy launch vehicle. The goal of Orions maiden flight was to stress the system by placing an uncrewed vehicle on a high-energy trajectory replicating conditions similar to those that would be experienced when returning from an asteroid or a lunar mission. The Orion navigation team combined all trajectory data from the mission into a Best Estimated Trajectory (BET) product. There were significant challenges in data reconstruction and many lessons were learned for future missions. The team used an estimation filter incorporating radar tracking, onboard sensors (Global Positioning System and Inertial Measurement Unit), and day-of-flight weather balloons to evaluate the true trajectory flown by Orion. Data was published for the entire Orion EFT-1 flight, plus objects jettisoned during entry such as the Forward Bay Cover. The BET customers include approximately 20 disciplines within Orion who will use the information for evaluating vehicle performance and influencing future design decisions.

Holt, Greg N.↗

Space Interferometry Mission

The Space Interferometry Mission (SIM) fligt system will be launched in June of 2005 into a nearly circular orbit arount the Earth. A Delta II 7920 launch vehicle will boost the SIM flight System from the Vandenberg Air Force Base into Earth orbit.

science↗

Kuiper Express: A Sciencecraft

The Kuiper Express is a mission to achieve the first reconnaissance of one of the primitive objects in the Kuiper Belt. The Kuiper Express is a sciencecraft mission. It will be launched using a Delta vehicle and will use solar electric propulsion to shape its trajectory in the inner Solar System, while executing two Earth gravity-assist flybys.

Kuiper↗

Monitoring Direct Effects of Delta, Atlas, and Titan Launches from Cape Canaveral Air Station

Launches of Delta, Atlas, and Titan rockets from Cape Canaveral Air Station (CCAS) have potential environmental effects that could arise from direct impacts of the launch exhaust (e.g., blast, heat), deposition of exhaust products of the solid rocket motors (hydrogen chloride, aluminum oxide), or other effects such as noise. Here we: 1) review previous reports, environmental assessments, and environmental impact statements for Delta, Atlas, and Titan vehicles and pad areas to clarity the magnitude of potential impacts; 2) summarize observed effects of 15 Delta, 22 Atlas, and 8 Titan launches; and 3) develop a spatial database of the distribution of effects from individual launches and cumulative effects of launches. The review of previous studies indicated that impacts from these launches can occur from the launch exhaust heat, deposition of exhaust products from the solid rocket motors, and noise. The principal effluents from solid rocket motors are hydrogen chloride (HCl), aluminum oxide (Al2O3), water (H2O), hydrogen (H2), carbon monoxide (CO), and carbon dioxide (CO2). The exhaust plume interacts with the launch complex structure and water deluge system to generate a launch cloud. Fall out or rain out of material from this cloud can produce localized effects from acid or particulate deposition. Delta, Atlas, and Titan launch vehicles differ in the number and size of solid rocket boosters and in the amount of deluge water used. All are smaller and use less water than the Space Shuttle. Acid deposition can cause damage to plants and animals exposed to it, acidify surface water and soil, and cause long-term changes to community composition and structure from repeated exposure. The magnitude of these effects depends on the intensity and frequency of acid deposition.

Schmalzer, Paul A.↗

Results of Evaluation of Solar Thermal Propulsion

The solar thermal propulsion evaluation reported here relied on prior research for all information on solar thermal propulsion technology and performance. Sources included personal contacts with experts in the field in addition to published reports and papers. Mission performance models were created based on this information in order to estimate performance and mass characteristics of solar thermal propulsion systems. Mission analysis was performed for a set of reference missions to assess the capabilities and benefits of solar thermal propulsion in comparison with alternative in-space propulsion systems such as chemical and electric propulsion. Mission analysis included estimation of delta V requirements as well as payload capabilities for a range of missions. Launch requirements and costs, and integration into launch vehicles, were also considered. The mission set included representative robotic scientific missions, and potential future NASA human missions beyond low Earth orbit. Commercial communications satellite delivery missions were also included, because if STP technology were selected for that application, frequent use is implied and this would help amortize costs for technology advancement and systems development. A C3 Topper mission was defined, calling for a relatively small STP. The application is to augment the launch energy (C3) available from launch vehicles with their built-in upper stages. Payload masses were obtained from references where available. The communications satellite masses represent the range of payload capabilities for the Delta IV Medium and/or Atlas launch vehicle family. Results indicated that STP could improve payload capability over current systems, but that this advantage cannot be realized except in a few cases because of payload fairing volume limitations on current launch vehicles. It was also found that acquiring a more capable (existing) launch vehicle, rather than adding an STP stage, is the most economical in most cases.

Woodcock, Gordon↗

INSAT-1A launch on Delta

The INSAT-1A, the first in a series of 12 transponder communications satellites developed for India, is described as well as the launch plans. The launch vehicle will be the Delta 3910 configuration which incorporates an extended long tank Thor booster, nine Castor IV strap-on motors, a TR-201 second stage, and an 8 foot fairing. The satellite will be placed in a suborbital trajectory. A DAM-D stage will then thrust it into a synchronous transfer orbit. An apogee kick motor will be fired to circularize its orbit at a geosynchronous altitude of 19,300 nautical miles.

Source record↗

Control of NASA's Space Launch System

The flight control system for the NASA Space Launch System (SLS) employs a control architecture that evolved from Saturn, Shuttle & Ares I-X while also incorporating modern enhancements. This control system, baselined for the first unmanned launch, has been verified and successfully flight-tested on the Ares I-X rocket and an F/A-18 aircraft. The development of the launch vehicle itself came on the heels of the Space Shuttle retirement in 2011, and will deliver more payload to orbit and produce more thrust than any other vehicle, past or present, opening the way to new frontiers of space exploration as it carries the Orion crew vehicle, equipment, and experiments into new territories. The initial 70 metric ton vehicle consists of four RS-25 core stage engines from the Space Shuttle inventory, two 5- segment solid rocket boosters which are advanced versions of the Space Shuttle boosters, and a core stage that resembles the External Tank and carries the liquid propellant while also serving as the vehicle's structural backbone. Just above SLS' core stage is the Interim Cryogenic Propulsion Stage (ICPS), based upon the payload motor used by the Delta IV Evolved Expendable Launch Vehicle (EELV).

VanZwieten, Tannen S.↗

Postflight analysis for Delta Program Mission no. 113: COS-B Mission

On 8 August 1975, the COS-B spacecraft was launched successfully from the Western Test Range (Delta Program Mission No. 113). The launch vehicle was a three stage Extended Long Tank Delta DSV-3P-11B vehicle. Postflight analyses performed in connection with flight are presented. Vehicle trajectory, stage performance, vehicle reliability and the propulsion, guidance, flight control, electronics, mechanical and structural systems are evaluated.

Source record↗

Mission Design Overview for Mars 2003/2005 Sample Return Mission

In May 2003, a new and exciting chapter in Mars exploration will begin with the launch of the first of three spacecraft that will collectively contribute toward the goal of delivering samples from the Red Planet to Earth. This mission is called Mars Sample Return (MSR) and will utilize both the 2003 and 2005 launch opportunities with an expected sample return in October 2008. NASA and CNES are major partners in this mission. The baseline mission mode selected for MSR is Mars orbit rendezvous (MOR), analogous in concept to the lunar orbit rendezvous (LOR) mode used for Apollo in the 1960s. Specifically, MSR will employ two NASA-provided landers of nearly identical design and one CNES-provided orbiter carrying a NASA payload of rendezvous sensors, orbital capture mechanisms, and an Earth entry vehicle (EEV). The high-level concept is that the landers will launch surface samples into Mars orbit, and the orbiter will retrieve the samples in orbit and then carry them back to Earth. The first element to depart for Mars will be one of the two landers. Currently, it is proposed that an intermediate class launch vehicle, such as the Boeing Delta 3 or Lockheed Martin Atlas 3A, will launch this 1800-kg lander from Cape Canaveral during the May 2003 opportunity. The lander will utilize a Type-1 transfer trajectory with an arrival at Mars in mid-December 2003. Landing will be aided by precision approach navigation and a guided hypersonic entry to achieve a touchdown accuracy of 10 km or better. Although the exact landing site has not yet been determined, it is estimated that lander resource constraints will limit the site to between 15 degrees north and south latitudes. Following touchdown, the lander will deploy a six-wheeled, 60-kg rover carrying an extensive suite of instruments designed to aid in the analysis of the local terrain and collection of core samples from selected rocks. The surface mission is currently designed around a concept called the surface traverse. Each traverse will involve the rover exploring a selected area of terrain up to 100 meters from the lander, the collection of rock core samples, and the delivery of the samples from the traverse back to a sample canister on the lander. Planning estimates indicate that up to three traverses may be possible during the expected 90-sol lifetime of the lander. The canister that will receive the samples from the rover will be attached to the top stage of a small solid-fueled rocket mounted to the deck of the lander. This rocket is called the Mars Ascent Vehicle (MAV) and consists of three stages weighing a total of about 140 kg. After the conclusion of the surface mission, the MAV will lift-off and insert the sample canister into a near-circular orbit with an altitude of about 600 km and inclination of 45 degrees. The sample canister will wait in this orbit until it is retrieved by the orbiter sometime in early 2007. In August 2005, the second lander and a CNES-provided orbiter weighing 2700 kg will depart for Mars. Currently, it is proposed that a single Ariane 5 provided by CNES will launch both of these two elements onto a Type-2 transfer trajectory. Although the orbiter and lander will be launched together, they will separate shortly after injection and will fly to Mars as two independent spacecraft. However, both spacecraft will perform a maneuver between 10 and 15 days after launch so that their arrival times at Mars differ by between 12 and 24 hours. This scheme will reduce the operational complexity at the encounter date. A set of four 60-kg surface probes will ride piggyback on the orbiter to Mars. These CNES-provided probes are called Netlanders and will serve as surface stations for scientific investigations independent of the Mars Sample Return goals. Starting approximately one month prior to arrival at Mars, the orbiter will begin to release the Netlanders one at a time. Each release cycle will take several days, and will include time for precision navigation to execute one or two maneuvers that will target the Netlanders to their proper landing site. All four deployment cycles will be completed prior to 10 days before arrival. Both the orbiter and lander will arrive in late-July 2006. Upon arrival, the lander will perform a precision landing and surface mission similar in concept to the one that was executed during the 2003 opportunity. Although the landing site for the 2005 opportunity has not been selected, it is expected to be different from the 2003 site to enhance the diversity of the collected samples. The orbiter's arrival at Mars will be highlighted by the first use of aerocapture to insert a spacecraft into a capture orbit around another planet. The choice of aerocapture, as opposed to a propulsive orbit insertion, was considered mission enabling due to a reduction of over 2000 m/s in mission AV. Aerocapture will be targeted to produce a 250 km x 1400 km capture orbit with an inclination of 45 degrees. Current analysis indicates that achieving this goal will require approximately six minutes of flight deep in the atmosphere with a targeted periapsis of approach of about 43 km. After factoring into account the penalty for carrying a heat shield to survive aerocapture, the net savings compared to a propulsive orbital insertion amounts to several hundred kilograms.

Lee, Wayne J.↗

Delta Advanced Reusable Transport (DART): An alternative manned spacecraft

Although the current U.S. Space Transportation System (STS) has proven successful in many applications, the truth remains that the space shuttle is not as reliable or economical as was once hoped. In fact, the Augustine Commission on the future of the U.S. Space Program has recommended that the space shuttle only be used on missions directly requiring human capabilities on-orbit and that the shuttle program should eventually be phased out. This poses a great dilemma since the shuttle provides the only current or planned U.S. means for human access to space at the same time that NASA is building toward a permanent manned presence. As a possible solution to this dilemma, it is proposed that the U.S. begin development of an Alternative Manned Spacecraft (AMS). This spacecraft would not only provide follow-on capability for maintaining human space flight, but would also provide redundancy and enhanced capability in the near future. Design requirements for the AMS studied include: (1) capability of launching on one of the current or planned U.S. expendable launch vehicles (baseline McDonnell Douglas Delta II model 7920 expendable booster); (2) application to a wide variety of missions including autonomous operations, space station support, and access to orbits and inclinations beyond those of the space shuttle; (3) low enough costing to fly regularly in augmentation of space shuttle capabilities; (4) production surge capabilities to replace the shuttle if events require it; (5) intact abort capability in all flight regimes since the planned launch vehicles are not man-rated; (6) technology cut-off date of 1990; and (7) initial operational capability in 1995. In addition, the design of the AMS would take advantage of scientific advances made in the 20 years since the space shuttle was first conceived. These advances are in such technologies as composite materials, propulsion systems, avionics, and hypersonics.

Lewerenz, T.↗

Integrated Vehicle Ground Vibration Testing in Support of NASA Launch Vehicle Loads and Controls Analysis

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the Ares I crew launch vehicle and Ares V cargo launch vehicle. Ares I and V will form the space launch capabilities necessary to fulfill NASA's exploration strategy of sending human beings to the Moon, Mars, and beyond. As with all new space vehicles there will be a number of tests to ensure the design can be Human Rated. One of these is the Integrated Vehicle Ground Vibration Test (IVGVT) that will be measuring responses of the Ares I as a system. All structural systems possess a basic set of physical characteristics unique to that system. These unique characteristics include items such as mass distribution, frequency and damping. When specified, they allow engineers to understand and predict how a structural system like the Ares I launch vehicle behaves under given loading conditions. These physical properties of launch vehicles may be predicted by analysis or measured through certain types of tests. Generally, these properties are predicted by analysis during the design phase of a launch vehicle and then verified through testing before the vehicle is Human Rated. The IVGVT is intended to measure by test the fundamental dynamic characteristics of Ares I during various phases of operational/flight. This testing includes excitations of the vehicle in lateral, longitudinal, and torsional directions at vehicle configurations representing different trajectory points. During the series of tests, properties such as natural frequencies, mode shapes, and transfer functions are measured directly. These data will then be used to calibrate loads and Guidance, Navigation, and Controls (GN&C) analysis models for verifying analyses of Ares I. NASA launch vehicles from Saturn to Shuttle have undergone Ground Vibration Tests (GVTs) leading to successful launch vehicles. A GVT was not performed on the unmanned Delta III. This vehicle was lost during launch. Subsequent analyses indicated that had a GVT been conducted on the vehicle, problems with vehicle modes and control may have been discovered and corrected, avoiding loss of the vehicle/mission. This paper will address GVT planning, set-up, conduction and analyses, for the Saturn and Shuttle programs, and also focus on the current and on-going planning for the Ares I and V IVGVT.

Tuma, Margaret L.↗

Mission Trades for Aerocapture at Neptune

A detailed Neptune aerocapture systems analysis and spacecraft design study was performed to improve our understanding of the techonology requirement for such a hard mission. The primary objective was to engineer a point design based on blunt body aeroshell technology and quantitatively assess feasibility and performance. This paper reviews the launch vehicle, propulsion, and trajectory options to reach Neptune in the 2015-2020 time frame using aerocapture and all-propulsive vehicles. It establishes the range of entry conditions that would be consistent with delivering a - 1900 kg total entry vehicle maximum expected mass to Neptune including a - 790 kg orbiter maximum expected mass to the science orbit. Two Neptune probes would be also be delivered prior to the aerocapture maneuver. Results show that inertial entry velocities in the range of 28 to 30 km/s are to be expected for chemical and solar electric propulsion options with several gravity assists (combinations of Venus, Earth and Jupiter gravity assists). Trip times range from approximately 10-11 years for aerocapture orbiters to 15 years for all-propulsive vehicles. This paper shows that the use of aerocapture enables this mission given the payload to deliver around Neptune compared to an all-propulsive orbit insertion approach. However, an all-propulsive chemical insertion option is possible for lower payload masses than the one needed for this science mission. Both approaches require a Delta IV heavy class launch vehicle.

aerocapture↗