Search NASASearch

SEARCH · Search NASA

Results for “Flight Control System Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,087 records · Page 11

New Developments in Nickel-Hydrogen Dependent Pressure Vessel (DPV) Cell and Battery Design

THe Dependent Pressure Vessel (DPV) Nickel-Hydrogen (NiH2) design is being developed as an advanced battery for military and commercial, aerospace and terrestrial applications. The DPV cell design offers high specific energy and energy density as well as reduced cost, while retaining the established Individual Pressure Vessel (IPV) technology flight heritage and database. This advanced DPV design also offers a more efficient mechanical, electrical and thermal cell and battery configuration and a reduced part count. The DPV battery design promotes compact, minimum volume packaging and weight efficiency, and delivers cost and weight savings with minimal design risk.

Caldwell, Dwight B.

The Entry Plasma Sheath and Its Effects on Space Vehicle Electromagnetic Systems, Volume 1

This symposium is the fourth in a series on the plasma sheath. The first three were held in Boston, Massachusetts, and were sponsored by the Air Force Cambridge Research Laboratories. The papers included in the symposium cover theoretical and experimental results of research and flight tests of many different specific aspects of the general problem of plasma sheath degradation of reentry vehicle electromagnetic systems. Only the newer advances and more recent developments in the field are included in the Fourth Plasma Sheath Symposium, with no particular attempt being made to review the general background and history of the problem or to cover those aspects discussed in the previous symposia. Flight data from both NASA and DOD programs are included.

Source record

Microprocessor controlled advanced battery management systems

The advanced battery management system described uses the capabilities of an on-board microprocessor to: (1) monitor the state of the battery on a cell by cell basis; (2) compute the state of charge of each cell; (3) protect each cell from reversal; (4) prevent overcharge on each individual cell; and (5) control dual rate reconditioning to zero volts per cell.

W. T. Payne

Evaluating Energy Absorption Methods for Integrated Composite Seat Designs

Composite materials have become ubiquitous in the aerospace industry due to their exceptionally light weight and high strength characteristics, as well as their unique ability to be engineered and tailored to meet specific loading conditions and performance requirements. These advanced materials offer superior strength-to-weight ratios compared to traditional metallic materials, making them particularly valuable in weight-critical aerospace applications where every pound saved translates to improved efficiency and performance. In currently operating fleets of commercial and military aircraft, composite materials have been successfully applied to critical structural components, including primary load-bearing elements such as the fuselage sections and flooring structures, which must withstand significant in-flight loads and provide passenger safety. Additionally, these materials have been specifically tailored and optimized for aerodynamic components such as wings and tail assemblies, where their ability to be molded into complex shapes while maintaining structural integrity is particularly advantageous. The application of composite materials extends beyond primary structural elements into the realm of internal cabin components, most notably in innovative seat designs where weight reduction and structural integration are paramount concerns. Modern composite seat structures can be designed to integrate multiple functions, including structural support, comfort features, and safety systems, all while maintaining the lightweight characteristics essential for aircraft performance.

Digital image correlation

Risk Reduction Project in Pad Abort-1 Launch Vehicle Loads & Dynamics

The Pad Abort (PA-1) system includes the Launch Abort System (LAS) and the Command Module (CM). The PA-1 abort flight test will launch from the White Sands Missile Range. Prior to the ignition, the vehicle will be resting, without restraints, on a short support structure. The Launch Abort Motor will ignite and burn for less than 5 seconds before a 20 second coast. Then the LAS will separate from the CM and the CM will descend via parachute to a soil landing. The static firing of the Abort Motor (ST-1) for PA-1 Launch Vehicle resulted in unexpected higher levels that superseded the environment predictions and all the design and test loads of all subassemblies and components. A rapid project was put in place to develop the flight environments, loads and associated uncertainties for the Verification Load Cycle (VLC) of PA-1. An acoustic test and shaker test of the CM were planned and executed in support of the developments of damping and transfer functions. Instead of using the traditional structure-borne envelops, the actual ST-1 pressures and forces were used to develop the internal accelerations. The PA-1 motor was cooled to 60 Deg F using thermal conditioning to reduce the thrust profile. The plumes of the abort motor were studied to determine if the airborne environments would be reduced. The combination of all items, noted above, allowed a reduction in loads for VLC.

Sasan C Armand

Life test of NiH2 flight battery

Life cycle tests being run on the 50 A lightweight nickel hydrogen flight battery are discussed and the preliminary results are presented.

Gandel, M. G.

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. In a previous publication, we discussed how we selected the three tools based primarily on their ability to be certified for human spaceflight and described our plans for the prototype. This abstract is due October 23, 2009, and the Ares I-X launch is currently scheduled for October 27, 2009. If this abstract is accepted, then the full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes. Also, the paper will describe the three tools and how they are used in the prototype. It will include a description of the TEAMS models of the Ares I-X first-stage TVC and associated ground hydraulics and how we adapted the TVC model for use in real-time diagnostics. It will describe the SHINE rules used for fault detection and mode identification and the software architecture that interfaces the various pieces of existing software that are part of the prototype to one another. It will describe how we selected the sensor values and commands that were used to train the IMS model and how we optimized the number of clusters in the IMS model. It will include screen shots of the graphical display that we developed in Java to display the outputs of the three tools. Because Ares I-X data was not yet available to us while we were developing the prototype, we used historical data from the Space Shuttle's Solid Rocket Booster (SRB) TVCs and the associated ground hydraulics to train IMS and to test the entire prototype. Because most of the failure modes that we modeled have never occurred in the Shuttle we inserted simulated failures into the Shuttle data. The Ares I-X first-stage TVC is very similar to the SRB TVC and we expect the data will be very similar. After the launch, we will determine how similar the data actually is and report how any differences in the data affected the diagnostic accuracy of the prototype. Finally, although we did not get the prototype certified, we designed it in a way that it could be certified and wrote a preliminary certification plan. The paper will include a brief summary of how we considered the need for certification in the design of the prototype, how we tested the prototype before deploying it to Hangar AE, and how we would propose to get it certified if it were deployed as an operational system. The paper will conclude with a description of some of the challenges we faced and some of the lessons learned in developing and deploying the prototype.

International Space Station

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

NRHO

Mission Design Considerations for a Low-Thrust Spacecraft

Developing an executable low-thrust trajectory for use in a spaceflight mission requires the design and optimization of a deterministic trajectory as well as the validation that the selected architecture is robust to some set of uncertainties, execution errors, and potential contingencies. Uncertainty in the ability of the spacecraft and its launch vehicle to execute a trajectory as well as potential deviations such as in-flight anomalies combine with design-to constraints and requirements to complicate the optimization problem. The approach by which robust mission design was accomplished for the initial capability of NASA’s Gateway is presented as well as associated results.

mission design