Search NASASearch

SEARCH · Search NASA

Results for “Long Lifetime”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

190 records · Page 11

Additively manufactured refractory high-entropy alloys with superior radiation resistance

Refractory high-entropy alloys (RHEAs) are promising candidates for next-generation nuclear and high-temperature applications. Among many approaches to manufacture RHEAs, additive manufacturing (AM) represents the most recent and advanced metal manufacturing method which allows near-net-shape manufacturing to reduce material waste and post-processing time. However, performance of AM RHEAs under complex irradiation conditions remains largely unexplored. Here, in this study, we demonstrate for the first time the response of directed energy deposition (DED) AM quaternary RHEAs (HfTaVW, CrTaVW) subjected to sequential dual-beam ion irradiation, consisting of helium pre-implantation followed by high-dose heavy ion bombardment. Compositions of DED AM RHEAs were selected using Monte Carlo (MC) simulations based on a cluster expansion (CE) Hamiltonian parameterized by density functional theory (DFT). Post-irradiation microstructural characterization revealed that the AM RHEA maintained remarkable stability, with suppressed helium bubble growth and reduced defect accumulation compared to conventional alloys. Even at high doses (∼100 dpa), the alloy exhibited no void swelling, a low density of dislocation loops, and no evidence of severe degradation. These results highlight the intrinsic ability of AM-derived microstructures and multicomponent chemistry to synergistically mitigate irradiation effects. Our findings establish AM RHEAs as a class of materials with superior resistance to radiation damage under conditions relevant to advanced fusion and fission environments and demonstrate the importance of sequential ion beam studies in evaluating their long-term performance.

36 MATERIALS SCIENCE

Power and particle exhaust in the ST-E1 fusion power plant

Power exhaust challenges and potential solutions for a 5 m major radius, low-aspect ratio burning tokamak have been explored. 1D edge plasma models have been used to screen for access to detachment using short and long outer divertor legs in double and single null configurations, using Ar as the primary impurity and assuming tungsten plasma-facing components (PFCs). These show that detachment access can be accessed for all but the most conservative assumptions on scrape-off layer (SOL) width and power, but that trade-offs will be required between magnet engineering and the size of the acceptable window of as-yet uncertain plasma parameters. SOLPS-ITER was used to further model selected plasma scenarios, confirming that Ar seeding can be used to achieve dissipative divertor scenarios with peak deposited heat fluxes below 15 MWm -2 . Initial scoping of first wall loads and positioning of limiters has been carried out, showing the feasibility of protecting the breeding blanket wall during steady state without impeding tritium breeding. Initial PFC technology selection is also presented, identifying this as a critical area where further work is needed to find an attractive solution for helium-cooled PFCs that can handle high heat fluxes without excessive power requirements. Key questions and trade-offs for concept development have been identified, including: how to achieve high radiation for reduction of SOL power without core performance degradation; whether power exhaust can be well-controlled in a double null plasma; mechanical design and materials challenges of high-heat flux PFCs; and control of material erosion, redeposition and tritium retention.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

String-Breaking Dynamics in Quantum Adiabatic and Diabatic Processes

Confinement prohibits isolation of color charges, e.g., quarks, in nature via a process called string breaking : the separation of two charges results in an increase in the energy of a color flux, visualized as a string, connecting those charges. Eventually, creating additional charges is energetically favored, hence breaking the string. Such a phenomenon can be probed in simpler models, including quantum spin chains, enabling enhanced understanding of string-breaking dynamics. A challenging task is to understand how string breaking occurs as time elapses, in an out-of-equilibrium setting. This work establishes the phenomenology of dynamical string breaking induced by a gradual increase of string tension over time. It, thus, goes beyond instantaneous quench processes and enables tracking the real-time evolution of strings in a more controlled setting. We focus on domain-wall confinement in a family of quantum Ising chains. Our results indicate that, for sufficiently short strings and slow evolution, string breaking can be described by the transition dynamics of a two-state quantum system akin to a Landau-Zener process. For longer strings, a more intricate spatiotemporal pattern emerges: the string breaks by forming a superposition of bubbles (domains of flipped spins of varying sizes), which involve highly excited states. We finally demonstrate that string breaking driven only by quantum fluctuations can be realized in the presence of sufficiently long-ranged interactions. This work holds immediate relevance for studying string breaking in quantum-simulation experiments.

Ising model

Fluidized Bed Gasification For Conversion of Biomass and Waste Materials to Renewable Hydrogen

This project was undertaken in order to study the potential for hydrogen production, at low cost, from mixtures of biomass and municipal solid waste (MSW). This approach allows for the production of hydrogen with a very low fossil carbon burden, while taking advantage of tipping fees (associated with MSW) to improved process economics. The team sourced three primary feedstocks (wood, MSW, and waste plastics) and characterized them comprehensively using established techniques with a long track record in the field of gasification. All three primary feedstocks were highly reactive and lost most of their mass during initial devolatilization. The production of tars, including heavy tars, was quite high, and was most problematic in the case of the MSW and Waste Plastics feedstocks. Little practical difference was identified between the MSW and Waste Plastics materials, and the addition of bed-forming materials (dolomite and brown alumina) to the feedstocks was found to reduce production of tars during devolatilization under thermogravimetric analysis and/or Fischer Assay conditions. A series of four tests in a lab-scale bubbling-fluidized-bed gasifier, at 50 psig of pressure and about 825 C, confirmed these findings. Pellet feedstocks, broken into fragments, were used for these tests, and pellets comprised of 50% MSW and 50% biomass were found to be the best option in terms of fossil carbon burden, economic potential, and gasification characteristics. Tests were then undertaken in a pilot-scale gasifier facility based on the GTI U-Gas fluidized-bed gasification technology. The feedstock handling train of the 20 TPD U-Gas pilot-scale gasifier located in Des Plaines, IL, was operated under simulated gasification conditions, and the 50/50 pellets were found to be very robust and unproblematic. An improved design for the forward end of the feedstock injection screw of the gasifier was developed and installed. The design approach was based on improved passive cooling of the front-most shroud at the end of the screw, since this approach was found in comprehensive modeling studies to be more than sufficient to accomplish the project objectives associated with this phase of the work, while also avoiding thermal gradients that could have caused heat-stress-induced damage to the refractory around the feedstock inlet if an active cooling approach had been applied. Careful technoeconomic analysis (TEA) of two possible 1000 TPD facilities was carried out. The TEA of conversion of MSW with corn stover in one case, and MSW with woody feedstock in the other case, showed that both had the potential to provide hydrogen at about $1/kg (minimum selling price, 2018 dollar basis). Of the two TEA cases, the one that was based on the conversion of wood in the southeastern USA was found to have slightly better economic potential. The other TEA case was based on a real location in Nebraska and called for corn stover feedstock conversion along with MSW. An underserved communities outreach program plan was developed in cooperation with personnel from the Nebraska Public Power District.

08 HYDROGEN

Nuclear Safety [Vol. 34, No. 1, January-March 1993]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 An Integrated Regional Approach To Risk Management of Industrial Systems, S. Chakraborty and R. Stratton; 9 Annual Technical Meeting of the NRC Cooperative Severe Accident Research Program, E. G. Silver; ACCIDENT ANALYSIS: 13 Deterministic Severe Accident Criteria as Severe Accident Design Criteria and Policy for the New Production Reactor-Heavy Water Reactor, P. T. Rhoads; 20 Proposed Deterministic Severe Accident Criteria for the Heavy Water Reactor-New Production Reactor Containment, K. D. Bergeron, S. E. Slezak, and C. E. Leach; 33 Quasi-Static Core Liquid Level Depression and Long-Term Core Uncovery During a PWR LOCA, Y. Kukita, R. R. Schultz, H. Nakamura, and J. Katayama; 49 LIRA: An Advanced Containment System to Minimize the Accidental Radioactivity Releases, A. Turricchia; 63 Errata to “A Review of Hydrogen Production During Melt/Water Interaction in LWRs,” Vol. 33, No. 4; CONTROL AND INSTRUMENTATION: 64 The Nuplex 80+™ Advanced Control Complex from ABB Combustion Engineering, F. Ridolfo, D. Harmon, and K. Scarola; DESIGN FEATURES: 76 A Scheme for Passive Isolation of the Containment of a Reactor, A. K. Ghosh, V. V. Raj, and K. Kakodkar; 84 Utility Requirements for Safety in the Passive Advanced Light-Water Reactor, T. U. Marston, W. H. Layman, and G. Bockhold, Jr.; WASTE AND SPENT FUEL MANAGEMENT: 91 Activities Related to Waste and Spent Fuel Management, Compiled by M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 103 Testing Deficiencies in Auxiliary Systems Feedwater Systems, J. D. Kueck; 110 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 113 Selected Safety-Related Events, Compiled by G. A. Murphy; 115 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; RECENT DEVELOPMENTS: 133 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 145 Reports, Standards, and Safety Guides, D. S. Queener; 150 Proposed Rule Changes as of Sept. 30, 1992; ANNOUNCEMENTS: 75 Harvard Short Course on Risk: Science, Assessment, and Management; 102 International Conference on Reactor Physics and Reactor Computations; 102 The Fourth International Conference on Nuclear Waste Reprocessing and Waste Management [RECOD ’94]; 132 International Symposium on the Radiological Exposure of the Population of the European Community from Radioactivity in the Mediterranean Sea [MARINA-MED]; 162 International High-Level Radioactive Waste Conference ‘Technology Integration—Above and Below”; 154 The Authors; 158 Indexes to Nuclear Safety, Volume 33.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Evolution of the Antarctic Ice Sheet from 2000–2300 and beyond: model sensitivity and uncertainty analysis using MPAS-Albany Land Ice

We present a description of the Antarctic Ice Sheet model configuration submitted to the ISMIP6-Antarctica-2300 experiment using the MPAS-Albany Land Ice model, along with three new sets of simulations: (1) a set of extended simulations to 2500 for three forced experiments and to 2775 for the control experiment; (2) a sensitivity analysis of our model configuration to parameters controlling basal sliding and sub-shelf melt, and to model structural choices including the choice of the energy and stress balances; and (3) a 72-member ensemble run on graphics processing units (GPUs) and analysis of variance to determine the primary sources of uncertainty in our ice-sheet model projections. Our extended simulations predict rapid retreat beginning after 2300 for SSP1-2.6 forcing and after 2500 for present-day (control) forcing, primarily in the Amundsen Sea Embayment. We find that varying the sub-shelf melt parameter between the 5th to 95th percentile values for a mean-Antarctic calibration target results in an up to ∼ ± 40 % change in sea-level contribution relative to our baseline simulations that used the median value. Using a linear basal sliding law reduces sea-level contribution by 51 %–73 % relative to our baseline nonlinear sliding law with an exponent of 1/5. When using basal sliding law exponents of 1/3 and 1/10, the overall difference from our baseline simulations at 2300 is on the order of 10 %. The Amundsen Sea Embayment region displays a strongly non-linear dependence of mass loss on the sliding law exponent, with no discernible relationship between the sliding law exponent and the mass loss by 2300, while the sectors feeding the Ross and Filchner-Ronne ice shelves exhibit more mass loss with a more-plastic sliding law. Our model fidelity sensitivity experiments reveal a 9 %–31 % increase in sea-level contribution when using a depth-integrated stress balance approximation relative to our three-dimensional solver, while using a fixed-in-time temperature field increases sea-level contribution by 14 %–88 % relative to two thermomechanically coupled configurations. Our 72-member ensemble and analysis of variance show that the uncertainty in long-term projections is dominated by the choice of Earth system model forcing and the presence or absence of hydrofracture forcing, rather than uncertainty in sliding and sub-shelf melt parameters.

58 GEOSCIENCES

Recrystallization, cracking, and erosion of dispersoid-strengthened tungsten materials during exposure to divertor plasmas

In this study, we investigated the effects of combined intense particle and heat flux exposure on advanced tungsten plasma-facing materials within the DIII-D fusion facility. Our test matrix included two types of dispersoid-strengthened tungsten (containing either 100 nm diameter TiO 2 or Ni particles), along with high-purity polycrystalline tungsten as a reference. This experiment relied on a sample geometry angled at 15° relative to the divertor surface, thereby allowing the surfaces to intercept steady-state perpendicular heat fluxes (q ⟂ ) ranging from 10.1 to 19.6 MW/m 2 . During each shot, the samples were exposed to 42 Hz edge-localized modes (ELMs), allowing us to test the material response to transient heating. We correlated the exposure conditions with extensive post-test surface composition analysis and microscopy to determine how the plasma modified each surface. The angled specimens closest to the strike point received the highest combined heat and particle flux and melted midway through the experiment. EBSD analysis revealed they were completely recrystallized throughout, with an average grain size >100 µm. On the other hand, the specimens that received a lower steady state heat flux survived with more superficial surface damage. Whereas the high-purity polycrystalline tungsten exhibited a higher surface roughness, the dispersoid-strengthened material exhibited more extensive shallow inter-granular cracking. In addition, the surface was depleted of dispersoids following plasma exposure, possibly because of evaporation and/or sputtering. The results described here provide insights into the performance of these materials in a fusion environment which can guide further optimization for use in long-pulse devices.

Kolasinski, Robert D. [Sandia National Laboratorie

Nuclear Safety [Vol. 34, No. 1, January-March 1993]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 An Integrated Regional Approach To Risk Management of Industrial Systems, S. Chakraborty and R. Stratton; 9 Annual Technical Meeting of the NRC Cooperative Severe Accident Research Program, E. G. Silver; ACCIDENT ANALYSIS: 13 Deterministic Severe Accident Criteria as Severe Accident Design Criteria and Policy for the New Production Reactor-Heavy Water Reactor, P. T. Rhoads; 20 Proposed Deterministic Severe Accident Criteria for the Heavy Water Reactor-New Production Reactor Containment, K. D. Bergeron, S. E. Slezak, and C. E. Leach; 33 Quasi-Static Core Liquid Level Depression and Long-Term Core Uncovery During a PWR LOCA, Y. Kukita, R. R. Schultz, H. Nakamura, and J. Katayama; 49 LIRA: An Advanced Containment System to Minimize the Accidental Radioactivity Releases, A. Turricchia; 63 Errata to “A Review of Hydrogen Production During Melt/Water Interaction in LWRs,” Vol. 33, No. 4; CONTROL AND INSTRUMENTATION: 64 The Nuplex 80+™ Advanced Control Complex from ABB Combustion Engineering, F. Ridolfo, D. Harmon, and K. Scarola; DESIGN FEATURES: 76 A Scheme for Passive Isolation of the Containment of a Reactor, A. K. Ghosh, V. V. Raj, and K. Kakodkar; 84 Utility Requirements for Safety in the Passive Advanced Light-Water Reactor, T. U. Marston, W. H. Layman, and G. Bockhold, Jr.; WASTE AND SPENT FUEL MANAGEMENT: 91 Activities Related to Waste and Spent Fuel Management, Compiled by M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 103 Testing Deficiencies in Auxiliary Systems Feedwater Systems, J. D. Kueck; 110 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 113 Selected Safety-Related Events, Compiled by G. A. Murphy; 115 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; RECENT DEVELOPMENTS: 133 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 145 Reports, Standards, and Safety Guides, D. S. Queener; 150 Proposed Rule Changes as of Sept. 30, 1992; ANNOUNCEMENTS: 75 Harvard Short Course on Risk: Science, Assessment, and Management; 102 International Conference on Reactor Physics and Reactor Computations; 102 The Fourth International Conference on Nuclear Waste Reprocessing and Waste Management [RECOD ’94]; 132 International Symposium on the Radiological Exposure of the Population of the European Community from Radioactivity in the Mediterranean Sea [MARINA-MED]; 162 International High-Level Radioactive Waste Conference ‘Technology Integration—Above and Below”; 154 The Authors; 158 Indexes to Nuclear Safety, Volume 33.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Evidence for large baryonic feedback at low and intermediate redshifts from kinematic Sunyaev-Zel’dovich observations with ACT and DESI photometric galaxies

Recent advances in cosmological observations have provided an unprecedented opportunity to investigate the distribution of baryons relative to the underlying matter. In this work, we show that the gas is more extended than the dark matter, and the amount of baryonic feedback at $z \lesssim 1$ disfavors low-feedback models such as that of state-of-the-art hydrodynamical simulation IllustrisTNG compared with high-feedback models such as that of the original Illustris simulation. This has important implications for bridging the gap between theory and observations and understanding galaxy formation and evolution. Furthermore, a better grasp of the baryon-dark matter link is critical to future cosmological analyses, which are currently impeded by our limited knowledge of baryonic feedback. Here, we measure the kinematic Sunyaev-Zel'dovich (kSZ) effect from the Atacama Cosmology Telescope (ACT), stacked on the luminous red galaxy (LRG) sample of the Dark Energy Spectroscopic Instrument (DESI) imaging survey. This is the first analysis to use photometric redshifts for reconstructing galaxy velocities. Due to the large number of galaxies comprising the DESI imaging survey, this is the highest signal-to-noise stacked kSZ measurement to date: we detect the signal at 13$σ$, finding strong evidence that the gas is more spread out than the dark matter, as well as a preference for larger feedback compared to some commonly used state-of-the-art hydrodynamical simulations. Here, our work opens up the possibility of recalibrating large hydrodynamical simulations using the kSZ effect. In addition, our findings highlight the importance of properly accounting for baryonic feedback with future surveys such as LSST through direct probes such as the kSZ, and shed light on long-standing enigmas in astrophysics, such as the “missing baryon” problem.

79 ASTRONOMY AND ASTROPHYSICS

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI