Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Large-Scale Molecular Dynamics Simulation of the Dehydration of a Suspension of Smectite Clay Nanoparticles

Fine-grained sediments and sedimentary rocks play important roles in a variety of modern energy technologies from petroleum geology to geological carbon sequestration and radioactive waste management. However, despite their utility and ubiquity, many of their properties remain poorly understood. In particular, the ability to predict the permeability and mechanics of these media remains a persistent fundamental challenge in the geosciences. In the present work, we show how large-scale classical molecular dynamics (MD) simulations can help interpret the properties of fine-grained sedimentary material. All-atom simulations containing 30 discrete clay particles are utilized to understand the evolution of a clay nanoparticle suspension during its progressive dehydration. Microstructural (pore size distribution, tortuosity, anisotropy), thermodynamic (enthalpy and free energy of hydration, anion exclusion), mechanical (total suction), and transport properties (diffusion coefficient tensors of water and sodium) are calculated and compared to the experiment. Overall, our results provide new insight into the coupled chemistry, mechanics, and transport properties of disordered nanoparticle assemblages and shed light upon the important role of water films in controlling these properties.

02 PETROLEUM↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Base Case

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1 Chg. 1, Radioactive Waste Management, a composite analysis (CA) must be completed for the Central Plateau at the Hanford Site. The updated Hanford Site CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within and downgradient of the Central Plateau. Numerical simulations using the MT3D-MST computer code were conducted to evaluate the fate and transport of existing distributions of 16 radionuclides as identified in CP-62184, Hanford Site Composite Analysis: Radionuclide Selection for Groundwater Pathway Evaluation: tritium (H-3), carbon-14 (C-14), chloride- 36 (Cl-36), strontium-90 (Sr-90), technetium-99 (Tc-99), rhenium-187 (Re-187), radium-226 (Ra-226), thorium-230 (Th-230), uranium-232 (U-232), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), neptunium-237 (Np-237), and uranium-238 (U- 238). This document details the application of the P2R Model version 8.3 to predict the fate and transport of contaminants in groundwater on the Central Plateau for the 10,052 year simulation to support the CA. The simulation of fate and transport of contaminants reported in this environmental calculation file (ECF) will support dose predictions as part of the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mineral-specific heterogeneous neptunium sorption onto geological repository rocks in oxic and anoxic conditions and various temperatures

Neptunium poses challenges for radioactive wastes management due to its long half-life and ingrowth from americium decay, as well as its high mobility in water in its oxidized forms. Np(V)-bearing aqueous solutions were contacted with polished and crushed gneiss and dolerite from the Yeniseisky site, Russia, which is under consideration as a location for an underground repository, both in oxic and anoxic conditions at 20 and 90 °C. Neptunium sorption on crushed gneiss and dolerite in oxic conditions at 20 °C was quite low, but increased substantially in anoxic conditions. Autoradiography on samples treated at 20 °C revealed that sorbed Np was associated mostly with dark colored iron-bearing minerals, and solvent extraction indicated partial reduction of Np(V) to Np(IV). Sorption of Np from aqueous solutions contacted with dolerite and gneiss at 90 °C was in all cases higher than at the lower temperature. Autoradiography of polished rock samples treated in anoxic conditions at 90 °C revealed that Fe-bearing minerals had 3–4 orders of magnitude more Np sorbed on them than the quartz and feldspar grains. X-ray photoelectron spectroscopy indicated this sorbed Np was present as NpO 2 . This study supports the concept that the geologic conditions present at the planned repository site will retard Np migration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Sustainability in Treatment of Contaminated Metals for Clearance and Recycling - 20290

Cyclife Sweden AB has, for more than 30 years, provided metal treatment services to the domestic and international nuclear industry with the aim of creating value through metal clearance and recycling. These operations are to a large extent based on the concept that the materials, after pre-treatment, including decontamination, will be melted for clearance. During the melting process, some nuclides separate from the metal while the remaining radioactivity becomes fully homogenized in the metal bath and the resulting ingots, along with the samples taken before casting At a time when activities to fight Climate Challenge are in focus, any savings in energy consumption, in addition to the positive environmental effect of recycling metals back to industry, is more than welcome. If the clearance of certain metallic items can be achieved safely, without using melting, it is the environmentally preferred option provided it carries a reasonable cost. It is even better if an object can go through a decontamination and clearance process prior to re-use inside or outside the nuclear sector. Cyclife Sweden is currently investing in a direct clearance process, to be operated in parallel with the melting process. This new process is expected to be fully operational in the late summer of 2020 and includes pre-treatment, decontamination and heavily shielded clearance measurement installations. The treatment will also allow clearance measurements of larger objects without the need for segmentation, along with allowing objects composed of different materials, like electric motors can be accepted for treatment. This paper gives an overview of the circular economy aspects in a nuclear back-end context, the Cyclife approach to further implement a circular economy approach in the processes, Material Acceptance Criteria for treatment, the facility set-up for the new process and how the melting route and the direct route can be combined in an efficient industrial scale process. To put the new capabilities into perspective, the two different treatment and clearance approaches, i.e. direct clearance and melting, are to be compared. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of extraterrestrial disposal of radioactive wastes. Part 2: Preliminary feasibility screening study of extraterrestrial disposal of radioactive wastes in concentrations, matrix materials, and containers designed for storage on earth

The results are reported of a preliminary feasibility screening study for providing long-term solutions to the problems of handling and managing radioactive wastes by extraterrestrial transportation of the wastes. Matrix materials and containers are discussed along with payloads, costs, and destinations for candidate space vehicles. The conclusions reached are: (1) Matrix material such as spray melt can be used without exceeding temperature limits of the matrix. (2) The cost in mills per kw hr electric, of space disposal of fission products is 4, 5, and 28 mills per kw hr for earth escape, solar orbit, and solar escape, respectively. (3) A major factor effecting cost is the earth storage time. Based on a normal operating condition design for solar escape, a storage time of more than sixty years is required to make the space disposal charge less than 10% of the bus-bar electric cost. (4) Based on a 10 year earth storage without further processing, the number of shuttle launches required would exceed one per day.

Hyland, R. E.↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiation Monitoring for Volatilized Zinc Contamination Using Gamma-Ray Imaging and Spectroscopy

Gamma-ray imaging is a tool that has grown in importance in the applications of non-destructive assay (NDA) for radioactive survey and analysis of nuclear facilities. Imaging techniques have shown great promise in providing valuable information involving radioactive waste management and contamination prevention. For the application studied in this work, 65 Zn has been identified as a radioactive contaminant during tritium extraction. Due to the volatile nature of 65 Zn under the pressure and temperature changes during extraction operations, 65 Zn can easily travel through components of the extraction system as vapor, making it difficult to trap. Previous research involving the development of a filtration system showed that the 65 Zn can be trapped, mitigating product contamination. However, during the extraction process, direct analysis of the equipment to confirm that zinc contamination is trapped in the filter and has not spread to other components is impractical. Here, in this situation, the need to assay the location of the contamination with little-to-no interference with operations is vital. In this work, we demonstrate the use of a commercialized 3D position-sensitive CdZnTe (CZT) gamma-ray imaging spectrometer to provide analysis of the 65 Zn contamination. Onsite measurements during an extraction process are studied to assess the location and migration of the 65 Zn. The results obtained from real-time glovebox monitoring demonstrate the feasibility of gamma-ray imaging for localizing the contamination and providing a preliminary qualitative assessment that is intended to be used in future work quantifying the contamination build-up and activity over time.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Validation Testing for Molten Chloride Reactor Experiment Equipment Removal and Disposal Techniques

The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Sulfidation of magnetite with incorporated uranium

Uranium (U) is a radionuclide of key environmental interest due its abundance by mass within radioactive waste and presence in contaminated land scenarios. Ubiquitously present iron (oxyhydr)oxide mineral phases, such as (nano)magnetite, have been identified as candidates for immobilisation of U via incorporation into the mineral structure. Studies of how biogeochemicalprocesses, such as sulfidation from the presence of sulfate-reducing bacteria, may affect iron (oxyhydr)oxides and impact radionuclide mobility are important in order to underpin geological disposal of radioactive waste and manage radioactively contaminated land. Here, this study utilised a highly controlled abiotic method for sulfidation of U(V) incorporated into nanomagnetite to determine the fate and speciation of U. Upon sulfidation, transient release of U into solution occurred (~8.6 % total U) for up to 3 days, despite the highly reducing conditions. As the system evolved, lepidocrocite was observed to form over a period of days to weeks. After 10 months, XAS and geochemical data showed all U was partitioned to the solid phase, as both nanoparticulate uraninite (U(IV)O2) and a percentage of retained U(V). Further EXAFS analysis showed incorporation of the residual U(V) fraction into an iron (oxyhydr)oxide mineral phase, likely nanomagnetite or lepidocrocite. Overall, these results provide new insights into the stability of U(V) incorporated iron (oxyhydr)oxides during sulfidation, confirming the longer term retention of U in the solid phase under complex, environmentally relevant conditions.

Townsend, Luke↗

DECOVALEX-2019: An international collaboration for advancing the understanding and modeling of coupled thermo-hydro-mechanical-chemical (THMC) processes in geological systems

The DECOVALEX Project is an international research collaboration for advancing the understanding and modeling of coupled thermo-hydro-mechanical-chemical (THMC) processes in geological systems. DECOVALEX stands for “DEvelopment of COupled Models and VALidation against EXperiments”. The creation of this international initiative, now running for almost 30 years, was motivated by the recognition that prediction of these coupled effects is an essential part of the performance and safety assessment of geologic disposal systems for radioactive waste and spent nuclear fuel, and also for a range of other sub-surface engineering activities. DECOVALEX emphasizes joint analysis and comparative modeling of state-of-the-art field and laboratory experiments, across a range of host rock options and repository designs. Participating research teams are from radioactive waste management organizations, national research institutes, regulatory agencies, universities, and consulting groups, providing a wide range of perspectives and solutions to these complex problems. The most recent phase of the DECOVALEX Project, here referred to as DECOVALEX-2019, started in 2016 and ended in 2019. Modeling teams from 13 international partner organizations participated in the comparative evaluation of seven modeling tasks involving complex field and/or laboratory experiments. Furthermore, this Virtual Special Issue on DECOVALEX-2019 provides an in-depth overview of these collaborative research efforts and how these have advanced the state-of-the-art of understanding and modeling coupled THMC processes.

58 GEOSCIENCES↗

Proton beam position measurement in air using a BPM

A Beam Position Monitor (BPM) is potentially useful to measure the position and phase of the beam in air in a non-destructive way. An air-gap BPM in experiments, such as beam-induced radioactive waste management and dynamic radiography applications, where a so-called air gap is needed, can be utilized to measure the beam position and phase. In this study, a stripline BPM was used in the air-gap of an 800 MeV proton beam transport line. The downstream end of the primary beamline exit window was made of a thin aluminum plate and allowed the beam to travel 1.2 m in ambient air before re-entering into a vacuum drift section. Such a configuration was arranged to examine the BPM effectiveness in atmospheric temperature and pressure where ionization of air occurs. In this study, a high energy (800 MeV), high current (0.6 A beam peak current/pulse) proton beam of 5 mm radius was transported in the air. The beam position relative to the axis was measured by detecting the signature of the beam in a nanosecond scale. This nanosecond scale detection ability was useful to identify other signals such as plasma effects. The BPM signals were processed at a frequency of 201 MHz; thus, one gets a stronger response in a stripline pattern as it was used in this study instead of a dot-type BPM. Experimental data show that the BPM works well in air, but ionization of air or plasma formation could not be measured over the BPM signal. The design, construction, and performance of a BPM in air environment are presented.

43 PARTICLE ACCELERATORS↗

Review of the Nuclear Energy Agency (NEA) Ancillary Thermodynamic Database (TDB) Volume (DRAFT REV. 0)

The Nuclear Energy Agency (NEA) Ancillary data volume comprises thermodynamic data of mineral and aqueous species that, in addition to Auxiliary Data (as referred to in previous NEA thermodynamic data volumes), is necessary to calculations of chemical interactions relevant to radioactive waste management and nuclear energy. This SAND report is a review of the NEA Ancillary data critical reviews volume of thermodynamic data parameters. The review given in this report mainly involves data comparison with other thermodynamic data assessments, analysis of thermodynamic parameters, and examination of data sources. Only new and updated data parameters were considered in this review. Overall, no major inconsistencies or errors were found as allowed by the comparisons conducted in this review. Some remarks were noted, for example, on the consideration of relevant studies and/or comparisons on the analysis and retrieval of thermodynamic data parameters not cited in the respective sections.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decovalex-2019 (Executive Summary)

The DECOVALEX Project is an on-going international research collaboration, established in 1992, to advance the understanding and modeling of coupled Thermal (T), Hydrological (H), Mechanical (M) and Chemical (C) processes in geological in geological systems. DECOVALEX was initially motivated by the recognition that prediction of these coupled effects is an essential part of the performance and safety assessment of geologic disposal systems for radioactive waste and spent nuclear fuel. Later it was realized that these processes also play a critical role in other subsurface engineering activities, such as subsurface CO 2 storage, enhanced geothermal systems, and unconventional oil and gas production through hydraulic fracturing. Research teams from many countries (e.g., Canada, China, Czech Republic, Finland, France, Germany, Japan, Republic of Korea, Spain, Sweden, Switzerland, Taiwan, United Kingdom, and the United States) various institutions have participated in the DECOVALEX Project over the years, providing a wide range of perspectives and solutions to these complex problems. These institutions represent radioactive waste management organizations, national research institutes, regulatory agencies, universities, as well as industry and consulting groups. The overall aim of DECOVALEX-2019 was to increase the understanding of various thermo-hydro-mechanical-chemical processes of importance for radionuclide release and transport from a repository to the biosphere and how they can be described and modelled using mathematical models. The scientific and technical objectives are: to increase the basic understanding of T-H-M-C coupled processes in fractured rocks (crystalline, sedimentary, argillaceous) and buffer materials; to investigate the predictive capabilities of different codes to field experiments and to perform verification of codes; to exchange experimental data, and improve the understanding of the constitutive behavior of crystalline and argillaceous rock masses and buffer materials; and to perform THMC calculations in a performance/safety assessment context.

58 GEOSCIENCES↗

Historical Data Analysis Supporting the Data Quality Objectives for the INL Site Environmental Soil Monitoring Program

This document represents the initial evaluation and soil monitoring proposed by Battelle Energy Alliance, LLC (BEA) in 2015. The evaluation included analyses of historical soil monitoring data and soil inventories, current emission estimates, and modeled potential deposition/accumulation patterns. The initially proposed monitoring included a 5-year rotation of in-situ gamma measurements augmented by soil sampling with laboratory analyses near each major active and some inactive facilities. It also proposed rotational in-situ gamma measurements and soil sampling at two centrally located onsite air monitoring locations coinciding with sampling at the traditional offsite soil monitoring locations. The chosen alternative includes only physical soil sampling with laboratory analysis and only at the Radioactive Waste Management Complex (RWMC), the two air monitors and the offsite locations as documented in Data Quality Objectives Supporting the Environmental Soil Monitoring Program for the Idaho National Laboratory (INL) Site, INL/EXT-15-34909, Revision 0, February 2016. The data and evaluations in this document are valid for comparisons with future soil data that may be collected in many INL site locations.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Composite Analysis: Dose Sensitivity Analyses

This environmental calculation file (ECF) documents the methodologies, assumptions, and results of five analyses that evaluate parameter changes to the revised Hanford Site Composite Analysis (CA) (DOE-RL-2019-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau). Specifically, this ECF describes the impact on total dose and analyte-specific doses for five sensitivity cases where changes to the following exposure-related parameters were implemented – (1) inventory, (2) recharge rate, (3) external dose conversion factors (DCFs) based on Federal Guidance Report (FGR) No. 15 in (EPA-402-R-19-002, Federal Guidance Report No. 15, External Exposure to Radionuclides in Air, Water, and Soil) instead of FGR No. 12 (EPA 402-R-93-081, Federal Guidance Report No. 12, External Exposure to Radionuclides in Air, Water, and Soil) for groundwater pathway scenario; (4) use of mean instead of 95th percentile intake assumptions for groundwater pathway scenario; and (5) consideration of limited sources based on U.S. Department of Energy (DOE) owned waste sites regulated under DOE O 435.1, Radioactive Waste Management. It should be noted that dose assessments for both base and sensitivity cases are based on the all-pathways representative person groundwater exposure scenario presented in DOE/RL-2022-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

INL Environmental Monitoring Plan (DOE/ID-11088 Rev. 5)

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

54 ENVIRONMENTAL SCIENCES↗