Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Advanced regenerative environmental control and life support systems - Air and water regeneration

Extended manned space missions will require regenerative life support techniques. Past U.S. manned missions used nonregenerative expendables, except for a molecular sieve-based carbon dioxide removal system aboard Skylab. The resupply penalties associated with expandables becomes prohibitive as crew size and mission duration increase. The U.S. Space Station, scheduled to be operational in the 1990's, is based on a crew of four to sixteen and a resupply period of 90 days or greater. It will be the first major spacecraft to employ regenerable techniques for life support. The paper uses the requirements for the Space Station to address these techniques.

Schubert, F. H.↗

A scheduling and resource management system for space applications

Every spacecraft, whether in orbit around the earth or an a deep space flight, has at its disposal limited amounts of the resources for it to accomplish its mission. Activity scheduling is currently a costly, human intensive task which requires a great deal of expertise. It belongs to a class of problems whose complexity increases exponentially with the number of operations. NASA has in the past accomplished this task by using a great deal of manpower, a large number of negotiating sessions, interminable bouts of phone tag, and mountains of paperwork. Lately the situation has improved with the introduction of automated scheduling techniques, but these to date still require expert involvement and fall short in some important ways. A prototype activity scheduler, MAESTRO, is introduced which is capable of meeting the needs of many NASA missions, eventually to include the Space Station. The approach to resource constrained scheduling is first discussed, then the intended domain for MAESTRO is described along with its design and current capabilities. A description of planned enhancements and revisions to the systems is also presented.

Britt, Daniel L.↗

Advanced Regenerative Environmental Control and Life Support Systems: Air and Water Regeneration

Extended manned space missions will require regenerative life support techniques. Past manned missions used nonregenerative expendables, except for a molecular sieve based carbon dioxide removal system aboard Skylab. The resupply penalties associated with expendables becomes prohibitive as crew size and mission duration increase. The Space Station scheduled to be operational in the 1990's is based on a crew of four to sixteen and a resupply period of 90 days or greater. It will be the first major spacecraft to employ regenerable techniques for life support. The techniques to be used in the requirements for the space station are addressed.

Schubert, F. H.↗

Operations mission planner beyond the baseline

The scheduling of Space Station Freedom must satisfy four major requirements. It must ensure efficient housekeeping operations, maximize the collection of science, respond to changes in tasking and available resources, and accommodate the above changes in a manner that minimizes disruption of the ongoing operations of the station. While meeting these requirements the scheduler must cope with the complexity, scope, and flexibility of SSF operations. This requires the scheduler to deal with an astronomical number of possible schedules. The Operations Mission Planner (OMP) is centered around minimally disruptive replanning and the use of heuristics limit search in scheduling. OMP has already shown several artificial intelligence based scheduling techniques such as Interleaved Iterative Refinement and Bottleneck Identification using Process Chronologies.

Biefeld, Eric↗

NASA Tech Briefs, May 2013

Topics include: Test Waveform Applications for JPL STRS Operating Environment; Pneumatic Proboscis Heat-Flow Probe; Method to Measure Total Noise Temperature of a Wireless Receiver During Operation; Cursor Control Device Test Battery; Functional Near-Infrared Spectroscopy Signals Measure Neuronal Activity in the Cortex; ESD Test Apparatus for Soldering Irons; FPGA-Based X-Ray Detection and Measurement for an X-Ray Polarimeter; Sequential Probability Ratio Test for Spacecraft Collision Avoidance Maneuver Decisions; Silicon/Carbon Nanotube Photocathode for Splitting Water; Advanced Materials and Fabrication Techniques for the Orion Attitude Control Motor; Flight Hardware Packaging Design for Stringent EMC Radiated Emission Requirements; RF Reference Switch for Spaceflight Radiometer Calibration; An Offload NIC for NASA, NLR, and Grid Computing; Multi-Scale CNT-Based Reinforcing Polymer Matrix Composites for Lightweight Structures; Ceramic Adhesive and Methods for On-Orbit Repair of Re-Entry Vehicles; Self-Healing Nanocomposites for Reusable Composite Cryotanks; Pt-Ni and Pt-Co Catalyst Synthesis Route for Fuel Cell Applications; Aerogel-Based Multilayer Insulation with Micrometeoroid Protection; Manufacturing of Nanocomposite Carbon Fibers and Composite Cylinders; Optimized Radiator Geometries for Hot Lunar Thermal Environments; A Mission Concept: Re-Entry Hopper-Aero-Space-Craft System on-Mars (REARM-Mars); New Class of Flow Batteries for Terrestrial and Aerospace Energy Storage Applications; Reliability of CCGA 1152 and CCGA 1272 Interconnect Packages for Extreme Thermal Environments; Using a Blender to Assess the Microbial Density of Encapsulated Organisms; Mixed Integer Programming and Heuristic Scheduling for Space Communication; Video Altimeter and Obstruction Detector for an Aircraft; Control Software for Piezo Stepping Actuators; Galactic Cosmic Ray Event-Based Risk Model (GERM) Code; Sasquatch Footprint Tool; and Multi-User Space Link Extension (SLE) System.

Source record↗

Liquid lubrication in space

The requirement for long-term, reliable operation of aerospace mechanisms has, with a few exceptions, pushed the state of the art in tribology. Space mission life requirements in the early 1960s were generally 6 months to a year. The proposed U.S. space station schedule to be launched in the 1990s must be continuously usable for 10 to 20 years. Liquid lubrication systems are generally used for mission life requirements longer than a year. Although most spacecraft or satellites have reached their required lifetimes without a lubrication-related failure, the application of liquid lubricants in the space environment presents unique challenges. The state of the art of liquid lubrication in space as well as the problems and their solutions are reviewed.

Zaretsky, Erwin V.↗

Design and Performance of a Spectrometer for Deployment on MISSE 7

A spectrometer for reflectance and transmission measurements of samples exposed to the space environment has been developed for deployment on the Materials on the International Space Station Experiment (MISSE) 7. The instrument incorporates a miniature commercial fiber optic coupled spectrometer with a computer control system for detector operation, sample motion and illumination. A set of three spectrometers were recently integrated on the MISSE7 platform with launch and deployment on the International Space Station scheduled for summer of this year. The instrument is one of many active experiments on the platform. The performance of the instrument prior to launch will be discussed. Data from samples measured in the laboratory will be compared to those from the instrument prior to launch. These comparisons will illustrate the capabilities of the current design. The space environment challenges many materials. When in operation on the MISSE 7 platform, the new spectrometer will provide real time data on the how the space environment affects the optical properties of thermal control paints and optical coatings. Data obtained from comparison of pre and post flight measurements on hundreds of samples exposed on previous MISSE platforms have been reported at these meetings. With the new spectrometer and the ability to correlate measured changes with time on orbit and the occurrence of both natural events and human activities, a better understanding of the processes responsible for degradation of materials in space will be possible.

Pippin, Gary↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

Automated Scheduling and Planning Environment (ASP↗

The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Languages for artificial intelligence: Implementing a scheduler in LISP and in Ada

A prototype scheduler for space experiments originally programmed in a dialect of LISP using some of the more traditional techniques of that language, was recast using an object-oriented LISP, Common LISP with Flavors on the Symbolics. This object-structured version was in turn partially implemented in Ada. The Flavors version showed a decided improvement in both speed of execution and readability of code. The recasting into Ada involved various practical problems of implementation as well as certain challenges of reconceptualization in going from one language to the other. Advantages were realized, however, in greater clarity of the code, especially where more standard flow of control was used. This exercise raised issues about the influence of programming language on the design of flexible and sensitive programs such as schedule planners, and called attention to the importance of factors external to the languages themselves such as system embeddedness, hardware context, and programmer practice.

Hays, Dan↗

Skylab rescue capability.

Skylab is an experimental manned space station scheduled to be placed into orbit in 1973. The Skylab system is to provide support for occupancy by a three-man crew for a total of up to five months. After an extensive study of various means by which rescue capability could be provided for Skylab, a plan was devised that provides coverage for those situations which are the most likely to arise. Rescue mission requirements are discussed together with a response-time analysis and the rescue vehicle configuration. The time-to-rescue will vary from 48 to 10 days, depending on the launch-readiness state at the time of a mission emergency.

Kleinknecht, K. S.↗

DORCA 2 computer program. Volume 1: User's guide

The Dynamic Operational Requirements and Cost Analysis Program (DORCA 2) is described. The computer program provides a top level analysis tool for NASA and relies on a man machine interaction to optimize results based on external criteria. The computer program relies heavily on outside sources to provide cost information and vehicle parameters. Given data describing mission, vehicles, payloads, containers, space facilities, schedules, cost values, and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules, and cost summaries. The program is designed to consider earth orbit, lunar, interplanetary, and automated satellite missions.

Wray, S. T., Jr.↗

DORCA computer program. Volume 1: User's guide

The Dynamic Operational Requirements and Cost Analysis Program (DORCA) was written to provide a top level analysis tool for NASA. DORCA relies on a man-machine interaction to optimize results based on external criteria. DORCA relies heavily on outside sources to provide cost information and vehicle performance parameters as the program does not determine these quantities but rather uses them. Given data describing missions, vehicles, payloads, containers, space facilities, schedules, cost values and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules and cost summaries. The program is designed to consider the Earth Orbit, Lunar, Interplanetary and Automated Satellite Programs. A general outline of the capabilities of the program are provided.

Wray, S. T., Jr.↗

Goldstone (GDSCC) administrative computing

The GDSCC Data Processing Unit provides various administrative computing services for Goldstone. Those activities, including finance, manpower and station utilization, deep-space station scheduling and engineering change order (ECO) control are discussed.

Martin, H.↗

Advanced Platform Systems Technology study. Volume 4: Technology advancement program plan

An overview study of the major technology definition tasks and subtasks along with their interfaces and interrelationships is presented. Although not specifically indicated in the diagram, iterations were required at many steps to finalize the results. The development of the integrated technology advancement plan was initiated by using the results of the previous two tasks, i.e., the trade studies and the preliminary cost and schedule estimates for the selected technologies. Descriptions for the development of each viable technology advancement was drawn from the trade studies. Additionally, a logic flow diagram depicting the steps in developing each technology element was developed along with descriptions for each of the major elements. Next, major elements of the logic flow diagrams were time phased, and that allowed the definition of a technology development schedule that was consistent with the space station program schedule when possible. Schedules show the major milestone including tests required as described in the logic flow diagrams.

Source record↗

Spacelab 2 - A preview

The Spacelab 2 mission, which is scheduled for Space Shuttle Challenger launch in July of 1985, will carry four telescopes for solar study, a dual X-ray telescope for observation of galaxy clusters, and a helium-cooled IR telescope for studies of interstellar clouds and other extended sources. The largest cosmic ray detector carried to space thus far will also be part of the payload. Life science experiment packages will examine the vitamin D chemistry of human blood under zero-G conditions, and the manner in which pine tree seedlings sense gravity and respond to it. Spacelab 2 will carry a crew of seven, including three mission specialists and two payload specialists.

Henize, K. G.↗

Analysis of Satellite Drag and Spin Decay Data

Work was begun as an effort to obtain satellite drag and upper atmospheric wind data from a spinning spherical satellite to be launched from the space shuttle scheduled for the STS-11 flight. The satellite was an inflated sphere having high area-to-mass ratio which would result in measurable orbital decay due to aerodynamic drag forces experienced by the satellite in the Earth's upper atmosphere. The satellite would also experience a spin decay due to the aerodynamic torque acting to slow the satellite spinning. The original proposal was to develop data analysis procedures to be employed to extract the desired information. Work was performed concerning the data analysis procedure prior to the STS-11 launch; however, the major effort was to begin after the data had been obtained. Unfortunately, the launch of the inflatable sphere on STS-11 was a failure in that the sphere did not inflate properly and no data was obtained. The emphasis of the work planned under this effort was then changed to develop a proposal for a series of experiments similar to the one originally planned for STS-11.

Karr, G. R.↗