Search NASA⌕ Search

SEARCH · Search NASA

Results for “Tribal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

CMCSCFCB—Critical Minerals in Coaly Strata of the Cherokee-Forest City Basin

This report summarizes results of CMCSCFCB—Critical Minerals in Coaly Strata of the Cherokee-Forest City Basin, a multiyear and multidisciplinary study funded through DE-FOA-0002364 as part of the Department of Energy Office of Fossil Energy and Carbon Management (FECM) Carbon Ore, Rare Earth and Critical Minerals (CORE-CM) Initiative for U.S. Basins. Our working group of state and tribal agencies collected data and made interpretations included herein. It also surveyed the regional potential for critical mineral/material production.

01 COAL, LIGNITE, AND PEAT↗

Enhanced Outcrop Methane Capture (Final Project Report)

This report provides the final status of the “Enhanced Outcrop Methane Capture (EOMC) Project” which was focused on drilling two new methane capture wells along the Fruitland Formation Outcrop for capture of methane and carbon dioxide which are naturally seeping from the Outcrop. The EOMC Project was focused on evaluating whether novel horizontal drilling technology will result in improved capture of methane and carbon dioxide which are naturally seeping from the Fruitland Formation Outcrop on Southern Ute tribal trust lands within the Southern Ute Indian Reservation (the “Reservation”).

01 COAL, LIGNITE, AND PEAT↗

Hanford Site Freshwater Mussel Monitoring Report for Calendar Year 2024

The U.S. Department of Energy, Hanford Field Office (HFO) conducts ecological monitoring at the Hanford Site to collect and maintain data to ensure compliance with an array of environmental laws, regulations, and policies governing HFO activities. Ecological monitoring data provides baseline information about the plants, animals, and habitats under HFO stewardship at the Hanford Site that is required for decision making under the National Environmental Policy Act of 1969 and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. In addition, ecological monitoring helps ensure that HFO, its contractors, and other entities conducting activities at the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement. HFO places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements that are rare and/or declining (i.e., federal or state listed endangered, threatened, or sensitive species) or are of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Freshwater Mussel Monitoring Report for Calendar Year 2022

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and maintain data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provides baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site that is required for decision making under the National Environmental Policy Act of 1969 and Comprehensive Environmental Response, Compensation, and Liability Act of 1980. In addition, ecological monitoring helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with the Hanford Site Comprehensive Land Use Plan (DOE/EIS-0222-F). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species) or are of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Evaluating Movement Patterns of the Rattlesnake Hills Elk Herd on Hanford for Calendar Years 2019-2024

Biologists first documented elk on the Hanford Site in 1972; since then, the elk herd known as the Rattlesnake Hills Elk Herd (RHEH) has grown substantially (PNNL-13331, Population Characteristics and Seasonal Movement Patterns of the Rattlesnake Hills Elk Herd: Status Report 2000). Through the 1990s, the core range of the RHEH was focused on the portion of the Hanford Reach National Monument known as the Fitzner-Eberhardt Arid Lands Ecology (ALE) Reserve. More recently, larger numbers of elk have been occupying the U.S. Department of Energy (DOE), Hanford Field Office (HFO), formerly the DOE, Richland Operations Office managed portion- of the Hanford Site, known as central Hanford (Figure 1-1). This began with bachelor groups of bulls occupying the site intermittently, and the herd has grown to resident herds, including bulls, cows, and calves. The Washington Department of Fish and Wildlife (WDFW) established a target herd size for the RHEH of less than 350 animals to minimize damages on adjacent private agricultural lands (Washington State Elk Herd Plan–Yakima Elk Herd [WDFW 2002]). Attempts to control the RHEH population through hunting on private lands and a relocation effort during 2000 have failed to limit growth of the population toward the WDFW target, and the herd exceeds 1,600 according to recent counts (PNNL-13331; DOE/RL- 2023-20, Hanford Annual Site Environmental Report for Calendar Year 2022). Although elk are present on central Hanford year-round, they continue to move between areas offsite, the ALE Reserve, and central Hanford throughout the year, and it is these movements that result in many of the elk-vehicle collisions (EVC) that occur along Hanford Site roads and on the Washington State highways bordering the site. In addition, changes in management strategies on the ALE Reserve, including recent and potential future tribal elk hunts, may alter herd behavior and result in additional animals transiting onto and off central Hanford.

54 ENVIRONMENTAL SCIENCES↗

Townsend’s Ground Squirrel Conservation on the Hanford Site for Calendar Year 2023: Translocation to Support At-Risk Ground Squirrel Populations

The U.S. Department of Energy, Richland Operations Office (RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under RL stewardship at the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; or that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species) or of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Townsend’s Ground Squirrel Conservation on the Hanford Site for Calendar Year 2022: Translocation to Support At-Risk Ground Squirrel Populations

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at the Hanford Site required for accurate ecological impact assessment decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In addition, ecological monitoring helps ensure that DOE-RL, its contractors and other entities conducting activities on the Hanford Site are in compliance with the Hanford Site Comprehensive Land Use Plan (DOE/EIS-0222-F). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; or that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Ground Squirrel Monitoring Report for Calendar Year 2021

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing U.S. Department of Energy (DOE) activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at the Hanford Site required for accurate ecological impact assessment decision making under the National Environmental Policy Act and Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS- 0222-F, Hanford Site Comprehensive Land Use Plan (CLUP). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or of significant interest to federal, state, or Tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Townsend's Ground Squirrel Conservation on the Hanford Site for Calendar Year 2025

The U.S. Department of Energy (DOE), Hanford Field Office (HFO) conducts ecological monitoring on the DOE-managed portion of Hanford Site (hereby referred to as Central Hanford) to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing HFO activities. Ecological monitoring data provides baseline information about the plants, animals, and habitat under HFO stewardship on the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that HFO, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. HFO places priority on monitoring plant and animal species or habitats that have specific regulatory protections or requirements; that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or are of significant interest to federal, state, or tribal governments or to the public.

54 ENVIRONMENTAL SCIENCES↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

High Penetration Solar and Battery Project in Noatak, Alaska

Through funding from the Department of Energy’s Office of Indian Energy, the Northwest Arctic Borough (NAB) and the Native Village of Noatak (NNV) formed a Tribal Energy Development Organization (TEDO) to implement the Noatak Solar and Battery Project to reduce reliance on costly imported diesel, stabilize energy costs, and strengthen local energy sovereignty.

14 SOLAR ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

Basin-Scale Relicensing Opportunity

This dataset contains 1,261 hydropower facilities with associated Federal Energy Regulatory Commission (FERC) relicensing metrics. Anticipated FERC license renewal dates are summarized by river reach for observing areas of opportunities for basin-wide collaboration on environmental mitigations. Identifying rivers and basins with facilities that have similar anticipated Federal Energy Regulatory Commission (FERC) relicensing dates may be one potential indicator that multiple licensees within the same basin may be willing to collaborate on a basin-scale relicensing effort. The hydropower relicensing process requires long-term resource allocation by agencies, hydropower owner/operators, non-governmental organizations, and tribal, state, and federal governments. Basin-scale hydropower relicensing has begun to receive attention as a potential solution for reducing licensing timelines, costs, and uncertainty which can provide benefits to a broad spectrum of participants in the licensing process. This dataset contains one a data file in comma separated (*.csv) format, a data dictionary in *.csv format, and a user guide in *.pdf format. These data are also available as an interactive web map available at:

13 HYDRO ENERGY↗

Low-Income Energy Affordability Data - LEAD Tool - 2022 Update

The Low-Income Energy Affordability Data (LEAD) Tool was created by the Better Building's Clean Energy for Low Income Communities Accelerator (CELICA) to help state and local partners understand housing and energy characteristics for the low- and moderate-income (LMI) communities they serve. The LEAD Tool provides estimated LMI household energy data based on income, energy expenditures, fuel type, housing type, and geography, which stakeholders can use to make data-driven decisions when planning for their energy goals. From the LEAD Tool website, users can also create and download customized heat-maps and charts for various geographies, housing, energy characteristics, and population demographics and educational attainment. Datasets are available for 50 states plus Puerto Rico and Washington D.C., along with their cities, counties, and census tracts, as well as tribal areas. The file below, "01. Description of Files," provides a list of all files included in this dataset. A description of the abbreviations and units used in the LEAD Tool data can be found in the file below titled "02. Data Dictionary 2022". A list of geographic regions used in the LEAD Tool can be found in files 04-11. The Low-Income Energy Affordability Data comes primarily from the 2022 U.S. Census American Community Survey 5-Year Public Use Microdata Samples and is calibrated to 2022 U.S. Energy Information Administration electric utility (Survey Form-861) and natural gas utility (Survey Form-176) data. The methodology for the LEAD Tool can viewed below (3. Methodology Document). For more information, and to access the interactive LEAD Tool platform, please visit the "10. LEAD Tool Platform" resource link below. For more information on the Better Building's Clean Energy for Low Income Communities Accelerator (CELICA), please visit the "11. CELICA Website" resource below.

AMI↗

Human Factors Design for Particle Accelerator Control Room Interfaces

Fermilab, the birthplace of many scientific discoveries in physics and particle accelerator sciences, is in the midst of a widescale modernization effort. The Accelerator Control Operations Research Network (ACORN project’s goal is to modernize the accelerator control system by replacing end-of-life power supplies and enhance future operations of the Fermilab accelerator complex with megawatt particle beams. Within ACORN, opportunities for process improvement concerning software development, human-system interface design, and task performance are also being considered. Human factors researchers from Idaho National Laboratory in collaboration with usability experts from Fermilab, are currently investigating human-centered design improvements for the accelerator control system. For example, substantial tribal knowledge and memory recall are required to effectively operate the accelerator system. This contributes to high cognitive workload and potential burnout of accelerator operators. Developing guidance for consistent visual and functional design enables a more intuitive interaction and relieves operators of cognitive burden. Additionally, developing more intuitive and integrated interfaces can also lead to improved accelerator efficacy by empowering operators with greater understanding and control of the systems. The challenge in developing such interfaces is in designing for a wide variety of user goals, system specifications, and level of experience in users. The challenges need to be met while e also considering the maintainability of the control system. The purpose of this paper is to detail the human factors process and design within the ACORN project, describe results gathered thus far, and discuss the larger implications for this work.

43 PARTICLE ACCELERATORS↗

Harmonized Database of Western U.S. Water Rights (HarDWR)

From Lisk et al. (in review): "In the arid and semi-arid western U.S., access to water is regulated through a legal system of water rights. Individuals, companies, organizations, municipalities, and tribal entities have documents that declare their water rights. State water regulatory agencies collate and maintain these records, which can be used in legal disputes over access to water. While these records are publicly available data in all western U.S. states, the data have not yet been readily available in digital form from all states. Furthermore, there are many differences in data format, terminology, and definitions between state water regulatory agencies. Here, we have collected water rights data from 11 western U.S. state agencies, harmonized terminology and use definitions, formatted them consistently, and tied them to a western U.S.-wide shapefile of water administrative boundaries. We demonstrate how these data enable consistent regional-scale western U.S. hydrologic and economic modeling."

Economics↗

Harmonized Database of Western U.S. Water Rights (HarDWR)

From Lisk et al. (2024): "In the arid and semi-arid western U.S., access to water is regulated through a legal system of water rights. Individuals, companies, organizations, municipalities, and tribal entities have documents that declare their water rights. State water regulatory agencies collate and maintain these records, which can be used in legal disputes over access to water. While these records are publicly available data in all western U.S. states, the data have not yet been readily available in digital form from all states. Furthermore, there are many differences in data format, terminology, and definitions between state water regulatory agencies. Here, we have collected water rights data from 11 western U.S. state agencies, harmonized terminology and use definitions, formatted them consistently, and tied them to a western U.S.-wide shapefile of water administrative boundaries. We demonstrate how these data enable consistent regional-scale western U.S. hydrologic and economic modeling."

Economics↗