Search NASA⌕ Search

SEARCH · Search NASA

Results for “Tribal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Townsend's Ground Squirrel Conservation on the Hanford Site for Calendar Year 2025

The U.S. Department of Energy (DOE), Hanford Field Office (HFO) conducts ecological monitoring on the DOE-managed portion of Hanford Site (hereby referred to as Central Hanford) to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing HFO activities. Ecological monitoring data provides baseline information about the plants, animals, and habitat under HFO stewardship on the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that HFO, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. HFO places priority on monitoring plant and animal species or habitats that have specific regulatory protections or requirements; that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or are of significant interest to federal, state, or tribal governments or to the public.

54 ENVIRONMENTAL SCIENCES↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

High Penetration Solar and Battery Project in Noatak, Alaska

Through funding from the Department of Energy’s Office of Indian Energy, the Northwest Arctic Borough (NAB) and the Native Village of Noatak (NNV) formed a Tribal Energy Development Organization (TEDO) to implement the Noatak Solar and Battery Project to reduce reliance on costly imported diesel, stabilize energy costs, and strengthen local energy sovereignty.

14 SOLAR ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

Basin-Scale Relicensing Opportunity

This dataset contains 1,261 hydropower facilities with associated Federal Energy Regulatory Commission (FERC) relicensing metrics. Anticipated FERC license renewal dates are summarized by river reach for observing areas of opportunities for basin-wide collaboration on environmental mitigations. Identifying rivers and basins with facilities that have similar anticipated Federal Energy Regulatory Commission (FERC) relicensing dates may be one potential indicator that multiple licensees within the same basin may be willing to collaborate on a basin-scale relicensing effort. The hydropower relicensing process requires long-term resource allocation by agencies, hydropower owner/operators, non-governmental organizations, and tribal, state, and federal governments. Basin-scale hydropower relicensing has begun to receive attention as a potential solution for reducing licensing timelines, costs, and uncertainty which can provide benefits to a broad spectrum of participants in the licensing process. This dataset contains one a data file in comma separated (*.csv) format, a data dictionary in *.csv format, and a user guide in *.pdf format. These data are also available as an interactive web map available at:

13 HYDRO ENERGY↗

Low-Income Energy Affordability Data - LEAD Tool - 2022 Update

The Low-Income Energy Affordability Data (LEAD) Tool was created by the Better Building's Clean Energy for Low Income Communities Accelerator (CELICA) to help state and local partners understand housing and energy characteristics for the low- and moderate-income (LMI) communities they serve. The LEAD Tool provides estimated LMI household energy data based on income, energy expenditures, fuel type, housing type, and geography, which stakeholders can use to make data-driven decisions when planning for their energy goals. From the LEAD Tool website, users can also create and download customized heat-maps and charts for various geographies, housing, energy characteristics, and population demographics and educational attainment. Datasets are available for 50 states plus Puerto Rico and Washington D.C., along with their cities, counties, and census tracts, as well as tribal areas. The file below, "01. Description of Files," provides a list of all files included in this dataset. A description of the abbreviations and units used in the LEAD Tool data can be found in the file below titled "02. Data Dictionary 2022". A list of geographic regions used in the LEAD Tool can be found in files 04-11. The Low-Income Energy Affordability Data comes primarily from the 2022 U.S. Census American Community Survey 5-Year Public Use Microdata Samples and is calibrated to 2022 U.S. Energy Information Administration electric utility (Survey Form-861) and natural gas utility (Survey Form-176) data. The methodology for the LEAD Tool can viewed below (3. Methodology Document). For more information, and to access the interactive LEAD Tool platform, please visit the "10. LEAD Tool Platform" resource link below. For more information on the Better Building's Clean Energy for Low Income Communities Accelerator (CELICA), please visit the "11. CELICA Website" resource below.

AMI↗

Human Factors Design for Particle Accelerator Control Room Interfaces

Fermilab, the birthplace of many scientific discoveries in physics and particle accelerator sciences, is in the midst of a widescale modernization effort. The Accelerator Control Operations Research Network (ACORN project’s goal is to modernize the accelerator control system by replacing end-of-life power supplies and enhance future operations of the Fermilab accelerator complex with megawatt particle beams. Within ACORN, opportunities for process improvement concerning software development, human-system interface design, and task performance are also being considered. Human factors researchers from Idaho National Laboratory in collaboration with usability experts from Fermilab, are currently investigating human-centered design improvements for the accelerator control system. For example, substantial tribal knowledge and memory recall are required to effectively operate the accelerator system. This contributes to high cognitive workload and potential burnout of accelerator operators. Developing guidance for consistent visual and functional design enables a more intuitive interaction and relieves operators of cognitive burden. Additionally, developing more intuitive and integrated interfaces can also lead to improved accelerator efficacy by empowering operators with greater understanding and control of the systems. The challenge in developing such interfaces is in designing for a wide variety of user goals, system specifications, and level of experience in users. The challenges need to be met while e also considering the maintainability of the control system. The purpose of this paper is to detail the human factors process and design within the ACORN project, describe results gathered thus far, and discuss the larger implications for this work.

43 PARTICLE ACCELERATORS↗

Harmonized Database of Western U.S. Water Rights (HarDWR)

From Lisk et al. (in review): "In the arid and semi-arid western U.S., access to water is regulated through a legal system of water rights. Individuals, companies, organizations, municipalities, and tribal entities have documents that declare their water rights. State water regulatory agencies collate and maintain these records, which can be used in legal disputes over access to water. While these records are publicly available data in all western U.S. states, the data have not yet been readily available in digital form from all states. Furthermore, there are many differences in data format, terminology, and definitions between state water regulatory agencies. Here, we have collected water rights data from 11 western U.S. state agencies, harmonized terminology and use definitions, formatted them consistently, and tied them to a western U.S.-wide shapefile of water administrative boundaries. We demonstrate how these data enable consistent regional-scale western U.S. hydrologic and economic modeling."

Economics↗

Harmonized Database of Western U.S. Water Rights (HarDWR)

From Lisk et al. (2024): "In the arid and semi-arid western U.S., access to water is regulated through a legal system of water rights. Individuals, companies, organizations, municipalities, and tribal entities have documents that declare their water rights. State water regulatory agencies collate and maintain these records, which can be used in legal disputes over access to water. While these records are publicly available data in all western U.S. states, the data have not yet been readily available in digital form from all states. Furthermore, there are many differences in data format, terminology, and definitions between state water regulatory agencies. Here, we have collected water rights data from 11 western U.S. state agencies, harmonized terminology and use definitions, formatted them consistently, and tied them to a western U.S.-wide shapefile of water administrative boundaries. We demonstrate how these data enable consistent regional-scale western U.S. hydrologic and economic modeling."

Economics↗

Estimating Return on Investment for Energy Technical Assistance Programs

The U.S. Department of Energy's Office of State and Community Energy Programs engaged the National Laboratory of the Rockies to assess the return on investment (ROI) of technical assistance (TA) programs that support state, local, and Tribal energy planning. Although TA delivers value through capacity building, stakeholder engagement, and knowledge transfer, these benefits are often intangible and challenging to monetize. This study reviews existing ROI frameworks and synthesizes the most relevant elements into a hybrid approach tailored to energy TA programs. The proposed framework integrates monetary and non-monetary outcomes through early logic model development, baseline data collection, and the use of proxies for intangible benefits. As a case study, this paper applies this approach to the Communities Local Energy Action Program (Communities LEAP), demonstrating how ROI can inform program design, data strategy, and performance assessment. Findings underscore that ROI should be applied selectively and planned from the outset to ensure data alignment and attribution accuracy. The framework offers TA practitioners a structured approach that can be leveraged for future programs to evaluate and communicate the multifaceted value of TA investments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Come Hell or High-Water: Challenges for Adapting Pacific Northwest Water Law

The Pacific Northwest region of the United States has been recognized as a leader in crafting water laws that work to balance human needs and ecological considerations. However, this region is experiencing changing dynamics that test the strength of existing water policies and laws. Such dynamics include increasing populations, new and exempt uses, quantification of tribal treaty rights, species protection, renegotiation of the Columbia River Treaty, and the impacts of a changing climate. Together, these dynamics are stressing the legal framework, which remains vital to ensuring sustainable water supplies now and into the future. Here, the history behind water resources management in Oregon, Washington, Idaho, and Montana provides the foundation for the laws in place today. Although all four states share regulatory features, nuances specific to each state have tremendously affected their governance structures and ability to adapt to changing dynamics. Although a challenge to meet these changing dynamics, collaborative efforts offer creative opportunities for meeting current and future needs.

99 GENERAL AND MISCELLANEOUS↗

NREL Helps Hydropower Projects Navigate Complex Regulatory Currents

Hydropower accounts for about 37% of U.S. renewable electricity generation. But before industry members can license and construct new projects or relicense existing projects, they must navigate complex approvals from federal, state, and tribal authorities. These regulations provide critical protections for water quality, species, cultural resources, and recreation, but they can also increase the costs, risks, and uncertainties to license or relicense projects.

HYDRO ENERGY↗

Community Energy Planning: Best Practices and Lessons Learned in NREL's Work with Communities

The clean energy transition is accelerating due to local, state, and national actions combined with external market forces. Regardless of where goals are set and decisions are made, clean energy deployment occurs on the ground in communities. As a result, communities increasingly need technical expertise and assistance with planning for and managing the energy transition. Building on decades of work with state, local, and tribal jurisdictions, the National Renewable Energy Laboratory (NREL) increasingly provides community-driven modeling, analysis, and technical assistance to enable more data-driven and equitable community energy planning. To inform and enhance NREL's capabilities in community energy planning and provide a resource for others working in this space, the Joint Institute for Strategic Energy Analysis (JISEA) Sustainable Communities Catalyzer supported this best-practices presentation based on interviews with seasoned NREL practitioners and a literature review on equitable community energy planning. Findings include five best practices for community energy planning that NREL practitioners and others can apply to strengthen their impact: 1) do your homework in preparation for community interactions; 2) be humble, authentic, and honest in your interactions with community members; 3) respect community agency in every step of the process; 4) meet the community where they are; 5) democratize participation.

best practices↗

Air Quality & Radionuclide Monitoring at the NNSS

Presentation on NNSS environmental compliance work, specifically air quality and radionuclide monitoring in the environment. Presentation to be given at NFO's Tribal Update Meeting April 11, 2023. Presentation is due to DRI on March 28.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Carbon Storage and Utilization: Perspective on Water Usage and Opportunities

Disseminate technical and non-technical perspective on the opportunities for water recovery from produced water and CO2 storage in the I-WEST region. Concerned citizens and advocacy groups; farmers and ranchers; tribal, state, city, and county leaders; and project leaders working on water-related initiatives are all encouraged to participate in the workshop. This workshop is an opportunity for regional stakeholders to join the conversation about the challenges and opportunities water presents for energy transition in the Inter- Mountain West.

Vikara, Derek↗

Regulatory Decision-Making Process Using 'Weight of Evidence: An Evidence Integration Approach' by the State of Washington at the Hanford Site - 20163

Performance Assessment and Environmental Impact Statement Modeling, Human and Ecological Risk Assessments are the tools used by the Washington State Department of Ecology (Ecology) to make regulatory decisions for permitting and cleanup. These efforts all inherently have large amounts of uncertainty no matter how many alternative approaches are attempted. Professional feedback from tribal governments, stakeholders, federal and state regulators, the public and independent peer review groups are taken into account in this process of informed decision making. The process also includes full evaluation of the comments and the associated reviews made by the various peer review groups such as the Low -Level Waste Disposal Facility Federal Review Group (DOE order 435.1) and the Nuclear Regulatory Commission (NRC). The evolution of technology has produced quicker and more efficient fate and transport modeling tools with related quantification of uncertainties and their significance. Groundwater and vadose zone models have been expanded across the entire Hanford site. Many of the technical approaches identified in the Washington State Regulations are updated using current knowledge to better understand the complexities of the Hanford Site using the latest state of the art tools for risk assessment and modeling. More emphasis and time are directed on defining uncertainty and then managing the uncertainty. One added tool is to run sensitivity cases based on informed decision making. The weight of evidence approach considers all relevant information in an integrative assessment that takes into account the kinds of evidence available, the quality and quantity, the uncertainty and error associated with each type, and how they fit together. Evidence of integration involves looking at systematic reviews and evaluating their strengths and weaknesses. In conclusion, Ecology, Washington State's lead regulatory agency at the Hanford site, has had to modify its site closure approach compared to the rest of the state. A more holistic approach dealing with the Hanford site as an integrated system has evolved leading to a defensible informed approach for regulatory closure decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗