Search NASASearch

SEARCH · Search NASA

Results for “cosmological parameters from LSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

909 records · Page 11

First multi-institutional systematic comparison of the neutron ambient dose equivalent produced by proton therapy systems

Objective. Isochronous cyclotrons, synchrocyclotrons, and synchrotrons are used to accelerate protons for proton therapy. An accurate measurement of neutron doses generated by these accelerators and associated delivery systems and its clinical relevance requires systematic protocols and proper neutron dosimetry for a meaningful assessment. We present the first comprehensive comparison of neutron ambient dose equivalent (H*(10)) produced by clinically operational proton therapy systems. Approach. Treatment plans with 10 cm modulation-depth and ranges of 10 cm (R10M10) and 25 cm (R25M10) were created to cover a 10 × 10 × 10 cm 3 water target. The pencil beam scanning proton therapy machines studied were: two gantry-mounted synchrocyclotrons (Hyperscan, Mevion, half-gantry), two isochronous cyclotrons (ProBeam, Varian, full-gantry), one isochronous cyclotron (Proteus, IBA, full-gantry), and two synchrotrons (PROBEAT, Hitachi, full- and half-gantry). Proton beams were delivered to 30 × 30 × 40 cm 3 plastic water phantoms. WENDI-II and LUPIN-BF3-NP neutron rem-meters were positioned at three angles (0°, 45°, 90°) relative to the beam direction to measure the neutron H*(10) at distances between 50–300 cm from the isocenter. Main results. H*(10) showed dependence on beam energy, machine type, and measurement location. The highest reading was for the gantry-mounted synchrocyclotron, whereas other systems produced approximately comparable neutron doses. In all cases, the H*(10) reduced with distance from the isocenter. The H*(10) drop at 2 m distance compared to that at 0.5 m was a factor of ∼5 for the gantry-mounted synchrocyclotron whereas in other systems the decrease was a factor of 10. The WENDI-II device suffered from dead-time-associated under-estimation of the dose by a factor of ∼2–3 under the synchrocyclotron beam due to its high dose-per-pulse. However, WENDI-II and LUPIN-BF3-NP results were within reasonable agreement in isochronous cyclotron and synchrotron beams, indicating that both devices are suitable for those systems. Significance. Neutron H*(10) is dependent on various parameters including beam energy, measurement location, as well as machine design. Caution must be exercised in choosing the appropriate neutron-dose-measurement device to be used for low-duty-factor, particularly in high-instantaneous-rate proton delivery systems. By delivering the same volumetric proton dose across different machines, this work provides a benchmark for inter-system comparisons and serves as a foundation for future studies.

LUPIN

Model-based, in-situ, non-destructive qualification and certification of parts made by autonomous additive manufacturing

To address the significant productivity challenges associated with the qualification and certification (Q&C) tasks of additively manufactured (AM) parts, which have traditionally relied on rigorous post‐build inspection and testing, we propose an integrated framework that combines model‐based qualification and certification (MBQ&C) with autonomous additive manufacturing (AAM). MBQ&C employs high‐fidelity predictive models, developed within the Integrated Computational Materials Engineering (ICME) paradigm, to simulate process–structure–property–performance relationships for assessing a part’s fitness for use. Since predictive models are commonly machine learning (ML)-based or reduced-order surrogates of validated physics models, they run efficiently, enabling timely inference. In parallel, the self-driving AAM utilises ML-based adaptive, closed‐loop control strategies to avoid, mitigate, or repair defects and anomalies during fabrication, thereby increasing the likelihood of producing acceptable parts. A key feature of the combined AAM-MBQ&C framework is that predictive models explicitly incorporate defects or anomalies that persist after the build, using instance-specific data captured via in-situ sensing. This customisation enables a build‐specific assessment of fitness for use, rather than relying on nominal or generic parameters. Such individualised evaluation provides a robust basis for Q&C-related acceptance decisions relating to each build. Additionally, the rapid solution capabilities of ML or reduced-order models enable the determination of a part’s suitability for service shortly after build completion. As the framework matures, it has the potential to substantially reduce reliance on conventional point‐design approaches—such as time‐consuming post‐build computed tomography scanning and costly destructive testing. Thus, the AAM-MBQ&C framework represents a transformative, scalable strategy for quality assurance of AM components, as parts produced within a stable, validated, and certified envelope can be certified with reduced testing. Key benefits include: (1) significant gains in Q&C productivity through efficient, model-centric assessment; (2) performance-based classification of defects into critical and non-critical categories; (3) the ability to predict potential deviations in the performance of parts affected by real-time, adaptive process control interventions relative to those produced under a certified process, and (4) the enabling of virtual Q&C for service environments that are difficult, hazardous, or impractical to access or reproduce experimentally. Collectively, these capabilities strengthen the business case for AM, particularly for high‐consequence and mission‐critical applications. Finally, although this work focuses on powder-based AM, the proposed techniques could be extended to AM processes employing alternative feedstock forms.

Gunasegaram, Dayalan

The DUNE Far Detector Vertical Drift Technology. Technical Design Report

DUNE is an international experiment dedicated to addressing some of the questions at the forefront of particle physics and astrophysics, including the mystifying preponderance of matter over antimatter in the early universe. The dual-site experiment will employ an intense neutrino beam focused on a near and a far detector as it aims to determine the neutrino mass hierarchy and to make high-precision measurements of the PMNS matrix parameters, including the CP-violating phase. It will also stand ready to observe supernova neutrino bursts, and seeks to observe nucleon decay as a signature of a grand unified theory underlying the standard model. The DUNE far detector implements liquid argon time-projection chamber (LArTPC) technology, and combines the many tens-of-kiloton fiducial mass necessary for rare event searches with the sub-centimeter spatial resolution required to image those events with high precision. The addition of a photon detection system enhances physics capabilities for all DUNE physics drivers and opens prospects for further physics explorations. Given its size, the far detector will be implemented as a set of modules, with LArTPC designs that differ from one another as newer technologies arise. In the vertical drift LArTPC design, a horizontal cathode bisects the detector, creating two stacked drift volumes in which ionization charges drift towards anodes at either the top or bottom. The anodes are composed of perforated PCB layers with conductive strips, enabling reconstruction in 3D. Light-trap-style photon detection modules are placed both on the cryostat's side walls and on the central cathode where they are optically powered. This Technical Design Report describes in detail the technical implementations of each subsystem of this LArTPC that, together with the other far detector modules and the near detector, will enable DUNE to achieve its physics goals.

47 OTHER INSTRUMENTATION

Internally Catalyzed Hydrogen Atom Transfer (I-CHAT)—A New Class of Reactions in Combustion Chemistry

The current paradigm of low-T combustion and autoignition of hydrocarbons is based on the sequential two-step oxygenation of fuel radicals. The key chain-branching occurs when the second oxygenation adduct (OOQOOH) is isomerized releasing an OH radical and a key ketohydroperoxide (KHP) intermediate. The subsequent homolytic dissociation of relatively weak O–O bonds in KHP generates two more radicals in the oxidation chain leading to ignition. Based on the recently introduced intramolecular “catalytic hydrogen atom transfer” mechanism (J. Phys. Chem. 2024, 128, 2169), abbreviated here as I-CHAT, we have identified a novel unimolecular decomposition channel for KHPs to form their classical isomers—enol hydroperoxides (EHP). The uncertainty in the contribution of enols is typically due to the high computed barriers for conventional (“direct”) keto–enol tautomerization. Remarkably, the I-CHAT dramatically reduces such barriers. The novel mechanism can be regarded as an intramolecular version of the intermolecular relay transfer of H-atoms mediated by an external molecule following the general classification of such processes (Catal. Rev.-Sci. Eng. 2014, 56, 403). Here, we present a detailed mechanistic and kinetic analysis of the I-CHAT-facilitated pathways applied to n-hexane, n-heptane, and n-pentane models as prototype molecules for gasoline, diesel, and hybrid rocket fuels. We particularly examined the formation kinetics and subsequent dissociation of the γ-enol-hydroperoxide isomer of the most abundant pentane-derived isomer γ-C5-KHP observed experimentally. To gain molecular-level insight into the I-CHAT catalysis, we have also explored the role of the internal catalyst moieties using truncated models. All applied models demonstrated a significant reduction in the isomerization barriers, primarily due to the decreased ring strain in transition states. In addition, the longer-range and sequential H-migration processes were also identified and illustrated via a combined double keto–enol conversion of heptane-2,6-diketo-4-hydroperoxide as a potential chain-branching model. To assess the possible impact of the I-CHAT channels on global fuel combustion characteristics, we performed a detailed kinetic analysis of the isomerization and decomposition of γ-C5-KHP comparing I-CHAT with key alternative reactions—direct dissociation and Korcek channels. Calculated rate parameters were implemented into a modified version of the n-pentane kinetic model developed earlier using RMG automated model generation tools (ACS Omega, 2023, 8, 4908). Simulations of ignition delay times revealed the significant effect of the new pathways, suggesting an important role of the I-CHAT pathways in the low-T combustion of large alkanes.

Biochemistry & Molecular Biology

Influence of Powder Characteristics and Processing Methods on Creep Performance of Powder Metallurgy Hot Isostatic Pressed SS316

The U.S. nuclear energy expansion goals are driving the demand for manufacturing routes that can rapidly produce large, complex, near net shape components. Powder metallurgy hot isostatic pressing (PM HIP) is an advanced manufacturing technique that can be economically scaled-up, while alleviating the supply chain challenges that forging and casting face in terms of cost and lead time constraints. This makes PM-HIP a viable technology to aid and accelerate large-scale part manufacturing for nuclear applications. However, large-scale qualification and deployment of this technology require a thorough understanding of the influence of powder feedstock quality, powder handling history, hot isostatic pressing (HIP) parameters, and subsequent heat treatment on microstructural evolution and elevated temperature mechanical performance. The present work focusses on 316 austenitic stainless steel (SS316) which is most commonly used in high temperature environments for nuclear applications Results from this study show that PM HIPed SS316 meets ASME tensile requirements at room temperature and at elevated temperature. However, creep performance of PM-HIPed SS316 remains inferior to its wrought counterpart, demonstrating that tensile performance alone is not a reliable metric for long duration high temperature integrity. Further, this report delineates powder derived microstructural features that govern creep damage, with key evidences pointing to “microstructural inheritance” from gas atomized powder feedstocks. Commercial SS316 powders of varying chemical compositions and recycling histories were studies, and the results showed large differences in elemental segregation, oxide surface layers and secondary phase distributions. Multi-scale characterization revealed segregation of chromium, molybdenum, manganese and silicon at the boundaries and the precipitation of manganese-, silicon-, and molybdenum-oxides. During HIP consolidation, these surface oxides transform into decorated prior particle boundaries (PPBs) and grain boundary inclusions that persist through conventional post-HIP solution annealing treatment. The retained oxides in post-HIP microstructures were found to influence grain growth, precipitation behavior, and ultimately creep cavitation and fracture. Such post-HIP heat treatments are therefore limited by a complex trade-off between grain growth, and oxide coarsening which aggravate creep damage by acting as nucleation sites for cavities. The objective of this work is to establish an integrated processing–structure–property framework for PM-HIP 316 stainless steel by investigating the influence of powder feedstock characteristics in pre- and post-HIP processing as well as to understand the significance of post-HIP heat treatment on microstructural evolution and creep properties. The results from this report emphasize the significance of powder feedstock integrity in improving creep performance of PM-HIPed SS316, by highlight the effect of rapid solidification, elemental segregation, oxide formation and powder recycling on microstructural defect inheritance following HIP consolidation. Rather than considering HIP processing, solution annealing, and mechanical performance independently, this report treats powder production, HIP consolidation, post-HIP thermal processing, and creep deformation as interconnected stages within a continuous metallurgical process. The resulting framework will provide a scientific basis for developing feedstock engineering strategies capable of improving long-term reliability of PM-HIP stainless steels and accelerating their qualification for advanced nuclear applications.

Ajjarapu, Pavan [Oak Ridge National Laboratory (OR

Power and particle exhaust in the ST-E1 fusion power plant

Power exhaust challenges and potential solutions for a 5 m major radius, low-aspect ratio burning tokamak have been explored. 1D edge plasma models have been used to screen for access to detachment using short and long outer divertor legs in double and single null configurations, using Ar as the primary impurity and assuming tungsten plasma-facing components (PFCs). These show that detachment access can be accessed for all but the most conservative assumptions on scrape-off layer (SOL) width and power, but that trade-offs will be required between magnet engineering and the size of the acceptable window of as-yet uncertain plasma parameters. SOLPS-ITER was used to further model selected plasma scenarios, confirming that Ar seeding can be used to achieve dissipative divertor scenarios with peak deposited heat fluxes below 15 MWm -2 . Initial scoping of first wall loads and positioning of limiters has been carried out, showing the feasibility of protecting the breeding blanket wall during steady state without impeding tritium breeding. Initial PFC technology selection is also presented, identifying this as a critical area where further work is needed to find an attractive solution for helium-cooled PFCs that can handle high heat fluxes without excessive power requirements. Key questions and trade-offs for concept development have been identified, including: how to achieve high radiation for reduction of SOL power without core performance degradation; whether power exhaust can be well-controlled in a double null plasma; mechanical design and materials challenges of high-heat flux PFCs; and control of material erosion, redeposition and tritium retention.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Impact of anion-exchange membrane degradation on long-term CO 2 electrolysis to ethylene

Electrochemical CO 2 reduction (eCO2R) to ethylene offers a unique opportunity to diversify domestic supply chains for chemical manufacturing. Large-scale deployment of eCO2R to ethylene reactors is currently limited by low energy efficiencies and poor durability. Herein, we demonstrate >100 h of continuous electrolysis at an industrially relevant current density of 200 mA cm −2 in a 25 cm 2 geometric area zero-gap reactor with a full-cell voltage <3.1 V and ethylene Faradaic efficiency >30%. Incorporating expanded polytetrafluoroethylene (PTFE)-supported electrodes into zero-gap reactors allows for durable electrode catalysts that are resistant to flooding, and this enables wider ranges of operating parameters not typically accessible in CO 2 electrolysis. Finally, we identify membrane degradation, evidenced by a loss of membrane ion-exchange capacity, as the leading cause of performance loss over 144 h of electrolysis.

Energy - Conversion

Ultrafast low-temperature metal–insulator interface phonon dynamics and heat transport in a Pt/Gd 3 Fe 5 O 12 heterostructure

Interfacial thermal and acoustic phenomena have an important role in quantum science and technology, including in spintronic and spincaloritronic materials and devices. Simultaneous measurements of the low-temperature thermal and acoustic properties of a metal/insulator heterostructure reveal distinct dynamics in the characteristic phonon frequency ranges of acoustic and thermal transport. The measurements probed a heterostructure consisting of a thin film of Pt on the ferrimagnetic insulator gadolinium iron garnet (Gd 3 Fe 5 O 12 , GdIG) grown epitaxially on a gadolinium gallium garnet substrate. Ultrafast structural dynamics within the Pt layer were tracked using time-resolved ultrafast x-ray diffraction and analyzed to probe interfacial acoustic and thermal properties. The rapid heating of the Pt layer by a 400 nm wavelength femtosecond-duration optical pulse produced transient structural changes that provided the stimulus for these measurements. Rapid heating produced a broadband acoustic pulse that was partially reflected by the Pt/GdIG interface. Temporal frequencies up to 740 GHz, corresponding to angular frequencies of several THz, were detected in a wavelet analysis of the acoustic oscillations of the strain in the Pt layer. The structural results were analyzed to determine (i) the acoustic damping coefficient and phonon mean free path in Pt at frequencies of hundreds of GHz and (ii) the Grüneisen anharmonicity parameter. The thermal conductance of the Pt/GdIG interface was tracked using the slower, tens-of-picosecond-scale, dynamics of the initial cooling of the heated Pt layer. Analysis using a model based on the Boltzmann transport equation shows that the phonon transmission is lower at the phonon frequencies relevant to thermal transport than for subterahertz regime acoustics.

Acoustic phenomena

Search for soft unclustered energy patterns produced in association with a W or Z boson in proton-proton collisions at $\sqrt{s}$ = 13 TeV

A search for a Higgs boson produced in association with a W or Z boson and decaying via a soft unclustered energy pattern (SUEP) is presented. The analysis is based on proton-proton collision data corresponding to an integrated luminosity of 138 fb −1 collected between 2016 and 2018 at the LHC. Final states with a leptonic W or Z boson decay associated with a high multiplicity of low-momentum charged particles are explored for the first time. The results show no significant excess over the standard model background expectation. Limits are set on the production cross section of a Higgs boson that decays to a SUEP, for a range of parameters of the SUEP model. Material is provided to facilitate further interpretation of the results.

CMS

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Highly-Quality Graphite Synthesis from Coal

This is a presentation for the 2026 graphite roundtable meeting. It includes synthesizing highly crystalline graphite from coal via a catalytic graphitization process.

coal to high value products