Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗

Can section 45Q tax credit foster decarbonization? A case study of geologic carbon storage at Acid Gas Injection wells in the Permian Basin

Carbon capture, utilization, and storage (CCUS) is an important pathway for meeting climate mitigation goals. While the economic viability of CCUS is well understood, previous studies do not evaluate the economic feasibility of carbon capture and storage (CCS) in the Permian Basin specifically regarding the new Section 45Q tax credits. We developed a technoeconomic analysis method, evaluated the economic feasibility of CCS at the acid gas injection (AGI) wells, and assessed the implication of Section 45Q tax credits for CCS at the AGIs. We find that the compressors, well depth, and the permit and monitoring costs drive the facility costs. Compressors are the predominant contributors to capital and operating expenditure driving the levelized cost of CO 2 storage. Strategic cost reduction measures identified include 1) sourcing of low-cost electricity and 2) optimizing operational efficiency in well operations. In evaluating the impact of the tax credits on CCS projects, facility scale proved decisive. We found that facilities with an annual injection rate exceeding 10,000 MT storage capacity demonstrate economic viability contingent upon the procurement of inputs at the least cost. The new construction of AGI wells were found to be economically viable at a storage capacity of 100,000 MT. The basin is heavily focused on CCUS (tax credit – $\$$65/MT CO 2 ), which overshadows CCS ($\$$85/MT CO 2 ) opportunities. Balancing the dual objectives of CCS and CCUS requires planning and coordination for optimal resource and pore space utilization to attain the basin's decarbonization potential. We also found that CCS on AGI is a lower cost CCS option as compared to CCS on other industries.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Magnetically Coupled Cryogenic Pump

Historically, cryogenic pumps used for propellant loading at Kennedy Space Center (KSC) and other NASA Centers have a bellows mechanical seal and oil bath ball bearings, both of which can be problematic and require high maintenance. Because of the extremely low temperatures, the mechanical seals are made of special materials and design, have wearing surfaces, are subject to improper installation, and commonly are a potential leak path. The ball bearings are non-precision bearings [ABEC-1 (Annular Bearing Engineering Council)] and are lubricated using LOX compatible oil. This oil is compatible with the propellant to prevent explosions, but does not have good lubricating properties. Due to the poor lubricity, it has been a goal of the KSC cryogenics community for the last 15 years to develop a magnetically coupled pump, which would eliminate these two potential issues. A number of projects have been attempted, but none of the pumps was a success. An off-the-shelf magnetically coupled pump (typically used with corrosive fluids) was procured that has been used for hypergolic service at KSC. The KSC Cryogenics Test Lab (CTL) operated the pump in cryogenic LN2 as received to determine a baseline for modifications required. The pump bushing, bearings, and thrust rings failed, and the pump would not flow liquid (this is a typical failure mode that was experienced in the previous attempts). Using the knowledge gained over the years designing and building cryogenic pumps, the CTL determined alternative materials that would be suitable for use under the pump design conditions. The CTL procured alternative materials for the bearings (bronze, aluminum bronze, and glass filled PTFE) and machined new bearing bushings, sleeves, and thrust rings. The designed clearances among the bushings, sleeves, thrust rings, case, and case cover were altered once again using experience gained from previous cryogenic pump rebuilds and designs. The alternative material parts were assembled into the pump, and the pump was successfully operated meeting all expected operating parameters. Unique pump sub-assembly parts were designed and manufactured by the CTL using specialized materials determined to be superior for cryogenic thermal applications under the pump design conditions. This work is a proof-of-concept/proof-of-operation of the pump only. Other known internal design modifications to the pump should be accomplished for the long-term use of the pump. An upscaled version of this pump, which is under development and testing at the CTL, can be used either for current or future vehicle loading or for vehicle replenishment. Scaling of this pump can be easily accomplished.

Hatfield, Walter↗

Benefits of Using a Mars Forward Strategy for Lunar Surface Systems

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a Mars Forward Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore's Law superimposed on the typical NASA systems engineering project development "V-cycle" described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the Mars-Ready Platform strategy in which incremental improvements lead from the initial lunar surface system components to Mars-Ready technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

Mulqueen, Jack↗

The NASA Redox Storage System Development project, 1980

The technical accomplishments pertaining to the development of Redox systems and related technology are outlined in terms of the task elements: prototype systems development, application analyses, and supporting technology. Prototype systems development provides for a major procurement to develop an industrial capability to take the current NASA Lewis technology and go on to the design, development, and commercialization of iron-chromium Redox storage systems. Application analyses provides for the definition of application concepts and technology requirements, specific definition studies, and the identification of market sectors and their penetration potential. Supporting technology includes both in house and contractual efforts that encompass implementation of technology improvements in membranes, electrodes, reactant processing, and system design. The status of all elements is discussed.

Source record↗

A Tailored Concept of Operations for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this project is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services.

Systems↗

High Yield Xray Imager Final Design Review

The High Yield Xray Imager (HYXI) is a new NIF target diagnostic system currently under development. The goal of HYXI is to provide high-fidelity, high temporal resolution x-ray imaging capability on high yield NIF implosions at 10MJ and above. The HYXI instrument design concept is based on the combination of two technologies that have been successfully utilized at the NIF on previous instruments, electron pulse-dilation and hybrid-CMOS sensor imaging. The combination of these two techniques will give HYXI sufficient data quality to ascertain differences in hot spot formation dynamics between high and low yield implosions. This information will highlight the critical hot spot conditions needed for ignition and burn. The HYXI design leverages the successful operation of the PDIXI x-ray imager at the NIF on multi MJ yield shots. A new radiation tolerant CMOS imaging array (HYPERION) is being developed to eliminate the significant background noise which limits the data quality of PDIXI. We successfully placed the contract with Advanced hCMOS Systems (AHS) to develop the HYPERION sensor, which fulfils our criteria to place long lead time item procurements by end of FY24. The HYXI Final Design Review was completed at the end of Q4 FY24 (Sep 24 th and Sep 30 th ). The HYXI project is a multi-year effort with a phased approach to be bring up system functionality over time in parallel with the development and fabrication effort of the HYPERION CMOS imaging array. In Phase 1, time-integrated x-ray images on NIF DT experiments will be collected starting in Q3 FY25. In Phase 2 of the project, time-resolved imaging with HYXI utilizing a spare microchannel plate detector back-end will begin in Q3 FY26. Phase 3 concludes the project with the installation of the HYPERION sensor array and the final performance qualification of the HYXI instrument which is scheduled for Q3 FY27 as discussed in the PDR and MRT report on this project in FY23.

42 ENGINEERING↗

CompactPCI(Registered TradeMark) Connectors in Space Flight Applications

This report documents the current status of CompactPCI(Registered TradeMark) connectors in GSFC spaceflight applications. To the extent the information is known, this report summarizes to what component quality level each NASA contractor (referred to as OEM in this report) procured the parts, and what board level and system level testing was performed. The report also provides the current status of the reliability assessment for each GSFC project based on the results of testing and FMEA (Failure Mode Effects Analysis). This report addresses how the CompactPCI(Registered TradeMark) connectors came into existence, and how these became the connector style chosen by many designers of space flight hardware. It identifies the design philosophy and the lack of robustness which has led to several known failure modes. These failure modes include fretting of connector pins during vibration, shock and thermal cycling, exposure of underplating, and increased resistance, including brief excursions to very high resistance. Each of these are signs of aging, which becomes an increasing concern for long duration orbiting space flight applications. This report addresses the mitigation strategy to replace CompactPCI(Registered TradeMark) connectors with space qualified Hypertronics 2mm cPCI connectors. The Hypertronics 2mm cPCI connectors are pin-to-pin compatible with the CompactPCI(Registered TradeMark) connectors and meet all of the same technical requirements, except the ability to hot mate, and to mate directly with a CompactPCI of the opposite gender. A detailed comparison of the CompactPCI(Registered TradeMark) connector and the Hypertronics 2mm cPCI connector is provided to describe the ruggedness of Hypertronics connector for space flight applications. Finally, this report makes recommendations for flight hardware for the future missions where the hardware is yet to be built, as well as for the hardware which has already been built with CompactPCI(Registered TradeMark) connectors.

Williams, Richard↗

SPECs Early-Stage Decision Model: User Manual

The SPECs Early-Stage Decision (ESD) model is central to the SPECs procurement solutions toolkit. The ESD model is an Excel-based spreadsheet model, which provides information about the economic and strategic value of a proposed battery-storage project or solar-plus-storage (solar-plus) project. The model can be used to explore combinations of storage-related project value streams in order to define a potential project, while educating co-op decision-makers about project benefits and costs. A sensitivity analysis function speeds the development of "what-if" scenarios. A gap analysis function solves for top-priority metrics and supports the inclusion of hard-to-monetize strategic values, such as the value of storage to defer costly system upgrades in light of increasing distributed solar and other distributed energy resources (DERs). Model outputs include the utility data, assumptions, and use-case scenarios that are recommended content for the requests for proposals (RFPs). The model may also provide an initial "sanity check" for RFP responses, supporting further discussions among utility staff, vendors and stakeholders. The ESD is not a "finance-grade" modeling tool, and users are cautioned to be mindful of its limitations, but the model has been reviewed by users, who recommend it as a way to drive faster and better project design and planning, as well as to facilitate better communications with vendors, grid partners, and stakeholders.

14 SOLAR ENERGY↗

Knowledge-based operation and management of communications systems

Expert systems techniques are being applied in operation and control of the Defense Communications System (DCS), which has the mission of providing reliable worldwide voice, data and message services for U.S. forces and commands. Thousands of personnel operate DCS facilities, and many of their functions match the classical expert system scenario: complex, skill-intensive environments with a full spectrum of problems in training and retention, cost containment, modernization, and so on. Two of these functions are: (1) fault isolation and restoral of dedicated circuits at Tech Control Centers, and (2) network management for the Defense Switched Network (the modernized dial-up voice system currently replacing AUTOVON). An expert system for the first of these is deployed for evaluation purposes at Andrews Air Force Base, and plans are being made for procurement of operational systems. In the second area, knowledge obtained with a sophisticated simulator is being embedded in an expert system. The background, design and status of both projects are described.

Heggestad, Harold M.↗

Cost Controls in the Cloud

The pay-as-you-go model used by most Cloud Service Providers shifts ownership of resource procurement from finance and management teams to IT, engineering, development and other stakeholders. This requires individual contributors to adopt a more "cost conscious" approach to development, and for projects to invest time into the creation of automated cost controls and cost-focused monitoring. This talk will presents some patterns and examples of cost controls based on our experience managing a multi-tenant cloud environment.

circuit breaker↗

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ESPC ESA Webinar Series: ESPC ENABLE Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy's (DOE) ESPC ENABLE contract vehicle. The ESPC ENABLE contract vehicle is a streamlined procurement process that uses a standard investment grade audit tool and standard contract templates. Topics covered in the webinar include: An overview of the ESPC ENABLE contract vehicle; ESA-specific considerations for ENABLE contracts; and Case studies. This webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as ESPC ENABLE templates. This webinar is the fourth of a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

BACKFLIP Project: Determination of BACKsheet Material Properties: A Comparison of Market-Benchmark Technologies to Novel Non-Fluoro-Based Co-Extruded Backsheet Materials and Their Correlation and Impact on PV Module Degradation Rates

Quantifying degradation rate of backsheets will help procuring materials for 30+ years. Today most backsheets on the market have a laminated PET core; polyolefin materials may provide better properties for backsheets (barrier to water, mechanical properties through UV and hydrolytic environments, etc.). End-of-life regulations may require fluorine-free backsheet products in future global markets. Parametrized equation predicting the service life of backsheets, and validated by both lab and outdoor extensive testing. Technical and commercial confidence to the entire value chain: from backsheet and module manufacturers to the downstream community (IPP, banks, developers) that materials of higher quality can help reduce finance costs, therefore driving down LCOE. A fast track PV module market adaptation for novel high-quality materials, such as co-extruded polyolefin-core backsheets, by obtaining unbiased durability data.

14 SOLAR ENERGY↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗