Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

The Spallation Neutron Source Beam Commissioning and Initial Operations

The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

43 PARTICLE ACCELERATORS↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recommendations to Improve Nuclear Licensing: Update to INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

In 2023, various stakeholders had asked for BEA’s thoughts and recommendations to improve the U.S. Nuclear Regulatory Commission’s (NRC) licensing review and approval process. This included an April 14, 2023 request from the House Committee on Energy and Commerce on “information and recommendations to improve the licensing review and approval process, . . . as well as the siting, licensing, construction, and oversight of advanced nuclear reactor technologies.” In response to these requests, BEA prepared and published INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process (2023 Report). The 2023 Report included 13 recommendations related to streamlining NRC hearings, expediting NRC safety and environmental reviews, otherwise improving NRC licensing, and providing financial benefits to new reactor projects. Many of these earlier recommendations were addressed through various legislative actions or changes made by the NRC. Section 2 of this report addresses the current status of those earlier recommendations. BEA recently received a new request from the House Committee on Energy and Commerce seeking any suggestions for additional areas to examine or potential reforms “that may assist in modernizing the licensing and regulatory process that affects civil nuclear deployment.” Additionally, the new Secretary of Energy has identified initial DOE actions to support unleashing the golden era of American energy dominance, including “Unleash Commercial Nuclear Power in the United States” and “Streamline Permitting and Identify Undue Burdens on American Energy.” Given these developments, BEA has prepared a new set of updated recommendations in this report. The recommendations include updated versions of recommendations from the 2023 Report which have not been fully adopted, as well as entirely new recommendations. This set of recommendations has a slightly broader focus with some recommendations focused on DOE authorizations and some recommendations related to nuclear licensing beyond new reactors. Each recommendation below also identifies whether the recommendation would require legislative action or could be addressed directly by the respective agency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commissioning MMS: Challenges and Lessons Learned

This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

Space Operations Center↗

Commissioning MMS

This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

Space Operations Center↗

Kepler Commissioning Data for Measurement of the Pixel Response Function and Focal Plane Geometry

This document describes the Kepler PRF/FPG data release. This data was taken on April 27-29, 2009, during Kepler's commissioning phase in order to measure the pixel response function (PRF) (Bryson et al., 2010a) and focal plane geometry (FPG) (Tenenbaum and Jenkins, 2010). 33,424 stellar targets were observed for 243 long cadences, each with a duration of 14.7 minutes (half the duration of a normal Kepler long cadence). During these 243 cadences the Kepler photometer was moved, pointing in a dither pattern to facilitate PRF measurement. Motion occurred during the even cadences (second, fourth, etc.), with the telescope in stable fine point at each pointing in the dither pattern during the odd cadences (first, third, etc.). The first and last cadences were at the center of the dither pattern. Motion cadences are included in this release, but they do not contain any data. For details on how this data was used to derive the Kepler PRF and FPG models, see Bryson et al. (2010a) and Tenenbaum and Jenkins (2010). Descriptions of the PRF and FPG models are found in Thompson et al. (2016), x2.3.5.17 and x2.3.5.16 respectively. The data in this release can be used to recompute the Kepler PRF and FPG. Such a reconstruction, however, would not reflect measured seasonal changes in the PRF described in Van Cleve et al. (2016b), x5.2.The dither pattern is shown in Figure 1. The crosses show the commanded pointings and the circles show the measured pointings. Measured pointings are different from the commanded pointings due to the early state of calibration of the fine guidance sensors during commissioning (Van Cleve et al., 2016a). The measured offsets from the center of the pattern are given in RADEC offsets and pixel offsets in Table 1. The order of the offsets was randomized during data collection to avoid time-dependent systematics.

Kepler↗

Lattice Commissioning Stretgy Simulation for the B Factory

To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.

43 PARTICLE ACCELERATORS↗

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

43 PARTICLE ACCELERATORS↗

Commissioning of the 112 MHz SRF Gun and 500 MHz bunching cavities for the CeC PoP Linac

The Coherent electron Cooling Proof-of-Principle (CeC PoP) experiment at BNL includes a short electron linac. During Phase 1, a 112 MHz superconducting RF photo-emission gun and two 500 MHz normal conducting bunching cavities were installed and are under commissioning. The paper describes the Phase1 linac layout and presents commissioning results for the cavities and associated RF, cryogenic and other sub-systems

43 PARTICLE ACCELERATORS↗

Commissioning results of Nb 3 Sn cavity vapor diffusion deposition system at JLab

Nb 3 Sn as a BCS superconductor with a superconducting critical temperature higher than that of niobium offers potential benefit for SRF cavities via a lower-than-niobium surface resistance at the same temperature and frequency. A Nb 3 Sn vapor diffusion deposition system designed for coating of 1.5 and 1.3 GHz single-cell cavities was built and commissioned at JLab. As the part of the commissioning, RF performance at 2.0 K of a single-cell 1.5 GHz CEBAF-shaped cavity was measured before and after coating in the system. Before Nb 3 Sn coating the cavity had a Q 0 of about 10 10 and was limited by the high field Q-slope at E acc ≅ 27 MV/m. Coated cavity exhibited the superconducting transition at about 17.9 K. The low-field quality factor was about 5∙10 9 at 4.3 K and 7∙10 9 at 2.0 K decreasing with field to about 1∙10 9 at E acc ≅ 8 MV/m at both temperatures. The highest field was limited by the available RF power.

36 MATERIALS SCIENCE↗

CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗

First e⁻/γ Commissioning Results for the GlueX Experiment/Hall D at CEBAF

Experimental Hall D, with flagship experiment GlueX, was constructed as part of the 12 GeV CEBAF upgrade. A new magnetically extracted electron beam line was installed to support this hall. Bremsstrahlung photons from retractable radiators are delivered to the experiment through a series of collimators following a long drift to allow for beam convergence. Coherent Bremsstrahlung generated by interaction with a diamond radiator will achieve a nominal 40% linear polarization and photon energies between 8.5 and 9 GeV from 12.1 GeV electrons, which are then tagged or diverted to a medium power 60kW electron dump. The expected photon flux is 10 7 -10 8 Hz. This paper discusses the experimental line design, commissioning experience gained since first beam in spring 2014, and the present results of beam commissioning by the experiment.

43 PARTICLE ACCELERATORS↗

Best Practices for Enhancing Performance Contracts with Monitoring-Based Commissioning

Fact sheet highlights best practices for incorporating monitoring-based commissioning (MBCx), a type of energy management information system (EMIS), in performance contracts. It draws from the Federal Energy Management Program (FEMP) report, Enhancing Performance Contracts Using Monitoring-based Commissioning. MBCx is commercially available, yet is underutilized in performance contracts. MBCx can result in significant benefits for both a federal facility and the performance contractor.

EMIS↗

Panel Session 32: Panel: Bringing First-of-a-Kind Treatment Facilities On-Line: Idaho IWTU Commissioning Approach (2/5)

This panel discussed the activities of bringing a first-of-a-kind treatment facility online: The Integrated Waste Treatment Unit (IWTU). The design was designed to treat 900,000 gallons of sodium-bearing liquid waste. Construction of this first-of-a-kind treatment facility was completed in 2012. A new approach was adopted in 2016 after multiple challenges were encountered during facility commissioning. This session focused on the Integrated Waste Treatment Unit (IWTU), which was constructed to convert the remaining 900,000 gallons of liquid sodium-bearing waste at the Idaho National Laboratory Site, Idaho, USA, to a granular solid. The liquid waste was generated during historic spent nuclear fuel reprocessing campaigns at the Idaho Nuclear Technology and Engineering Center and was transferred to three underground storage tanks. The waste was not first-cycle waste but was rather the liquid rinse waste from flushing waste transfer lines between reprocessing runs. IWTU will employ a steam-reforming process to treat the liquid waste. The resulting granular solid will be transferred to stainless steel canisters and then to concrete vaults, which will be stored on site until an off-site national geologic repository is available to accept the waste. Presentation proposed: Bringing First-of-a-Kind Treatment Facilities On-Line: Idaho IWTU Commissioning Approach (Joel Case, US DOE (USA), Leo Thompson, Sterling Engineering and Consulting Group, LLC (USA), Joseph Giebel, Fluor Idaho, LLC (USA), Richard Boardman, Idaho National Laboratory (USA), Kevin O'Neill, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ATF2 Commissioning

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

43 PARTICLE ACCELERATORS↗

Commissioning of the LCLS LINAC

The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac to the undulator is scheduled to start in November 2008 and for the undulator in March 2009 with first light to be expected in July 2009.

43 PARTICLE ACCELERATORS↗

Blue Ribbon Commission Tour of Hanford Site

The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗