Search NASA⌕ Search

SEARCH · Search NASA

Results for “HELIOCENTRIC ORBIT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

In-flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit )LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end in the summer of 2016. To date the IPS has been operated for over 48,454 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through June 2016.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Orbit Capture at Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta -II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. Onboard the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the ?V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The first 80 days after launch were dedicated to the initial checkout of the spacecraft which was followed by about ten months of full-power thrusting leading to a Mars gravity assist in February 2009 that provided 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. Deterministic thrusting for heliocentric transfer to Vesta resumed in June 2009 and was concluded with orbit capture at Vesta in July 2011. IPS was operated for approximately 23,400 hours, consumed approximately 250 kg of xenon, and provided a delta-V of approximately 6.7 km/s to achieve orbit capture at Vesta. IPS performance characteristics are very close to the expected performance characteristics based on analysis performed pre-launch. The only significant problem to have occurred over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in DCIU-1, resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture indicates DCIU-1 is completely operational. After about three weeks of survey operations IPS will be used to maneuver the spacecraft as needed for science operations including orbit transfers. After approximately one year of science operations IPS will then be used for escape from Vesta and begin thrusting for cruise to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through orbit capture and the start of science operations at Vesta.

Garner, Charles E.↗

Spitzer Space Telescope mission design

This paper gives a description of the mission design, launch, orbit, and navigation results for the Spitzer space telescope mission. The Spitzer telescope was launched by the Delta II Heavy launch vehicle into a heliocentric Earth trailing orbit. This orbit is flown for the first time and will be used by several future astronomical missions such as Kepler, SIM, and LISA. This paper describes the launch strategy for a winter versus a summer launch and how it affects communications. It also describes how the solar orbit affects the design and operations of the Observatory. It describes the actual launch timeline, launch vehicle flight performance, and the long term behavior of the as flown orbit. It also provides the orbit knowledge from in-flight navigation data.

Mission Design↗

Differential Cratering of Synchronously Rotating Satellites by Ecliptic Comets

We use Monte Carlo methods to simulate impacts of ecliptic comets on the synchronously rotating satellites of giant planets. We reconfirm the long-standing prediction that the cratering rate should be much higher on the leading hemispheres than on the trailing hemisphere; indeed we find that previously published analytical formulations modestly underestimate the degree of apex-antapex asymmetry to be expected. We then compare our results to new mapping of impact craters on Ganymede, Callisto, and Triton. Ganymede reveals a pronounced apex-antapex asymmetry that is nonetheless much less than predicted. All of Triton's confirmed impact craters are clustered toward the apex of motion, far exceeding the predicted asymmetry. No asymmetry is observed on Callisto. In each case at least one of our basic assumptions must be wrong. Likely candidates include the following: (i) the surfaces of all but the most sparsely cratered satellites are saturated or nearly saturated with impact craters; (ii) these satellites have rotated nonsynchronously over geological time; (iii) most of the craters are made not by heliocentric (Sun-orbiting) comets and asteroids but rather by planetocentric (planet-orbiting) debris of indeterminate origin; or (iv) pathological endogenic resurfacing has created illusions of structure. Callisto's surface is readily classified as nearly saturated. Ganymede's bright terrains, although less heavily cratered than those of Callisto, can also be explained by crater densities approaching saturation on a world where endogenic processes were active. The leading alternative is nonsynchronous rotation, an explanation supported by the distribution of catenae (crater chains produced by impact of tidally disrupted comets). Triton's craters can be explained by planetocentric debris or by capricious resurfacing, but both hypotheses are inherently improbable.

Zahnle, Kevin↗

Extrasolar Planetary Imaging Coronagraph (EPIC)

EPIC is a NASA mission being studied to detect and characterize Jovian and superEarth planets, and, the dust/debris disks surrounding the parent star. It will be launched into a heliocentric Earth trailing orbit and operate for 5 years. EPIC would operate over the wavelength range of 480 - 960 nm with spectral resolutions of R < 50 and employs a visible nulling coronagraph (VNC) to suppress the starlight, yielding contrast ratios of greater than 9 orders of magnitude. We will discuss the science mission, and its role in the search for habitable planets.

Clampin, Mark↗

Systems Engineering Challenges for GSFC Space Science Mission Operations

The NASA Goddard Space Flight Center Space Science Mission Operations (SSMO) project currently manages19 missions for the NASA Science Mission Directorate, within the Planetary, Astrophysics, and Heliophysics Divisions. The mission lifespans range from just a few months to more than20 years. The WIND spacecraft, the oldest SSMO mission, was launched in 1994. SSMO spacecraft reside in low earth, geosynchronous,highly elliptical, libration point, lunar, heliocentric,and Martian orbits. SSMO spacecraft range in size from 125kg (Aeronomy of Ice in the Mesosphere (AIM)) to over 4000kg (Fermi Gamma-Ray Space Telescope (Fermi)). The attitude modes include both spin and three-axis stabilized, with varying requirements on pointing accuracy. The spacecraft are operated from control centers at Goddard and off-site control centers;the Lunar Reconnaissance Orbiter (LRO), the Solar Dynamics Observatory (SDO) and Magnetospheric MultiScale (MMS)mission were built at Goddard. The Advanced Composition Explorer (ACE) and Wind are operated out of a multi-mission operations center, which will also host several SSMO-managed cubesats in 2017. This paper focuses on the systems engineeringchallenges for such a large and varied fleet of spacecraft.

Spacecraft↗

End to End Optimization of a Mars Hybrid Transportation Architecture

NASA’s Mars Study Capability Team (MSCT) is developing a reusable Mars hybrid transportation architecture in which both chemical and solar electric propulsion systems are used in a single vehicle design to send crew and cargo to Mars. This paper presents a new integrated framework that combines Earth departure/arrival, heliocentric trajectory, Mars orbit reorientation, and vehicle sizing into a single environment and solves the entire mission from beginning to end in an effort to find a globally optimized solution for the hybrid architecture.

Qu, Min↗

The ion propulsion system for Dawn

The Dawn Project's mission is to rendezvous and map the two heaviest main belt asteroids Vesta and Ceres. The Ion Propulsion System (IPS) for Dawn will be used for the heliocentric transfer from the Earth to Vesta, orbit capture at Vesta, transfer to a low Vesta orbit, departure and escape from Vesta, the heliocentric transfer from Vesta to Ceres, orbit capture at Ceres, and transfer to a low Ceres orbit.

ion propulsion asteroids spacecraft NSTAR↗

Stardust Navigation Covariance Analysis

The Stardust spacecraft was launched on February 7, 1999 aboard a Boeing Delta-II rocket. Mission participants include the National Aeronautics and Space Administration (NASA), the Jet Propulsion Laboratory (JPL), Lockheed Martin Astronautics (LMA) and the University of Washington. The primary objective of the mission is to collect in-situ samples of the coma of comet Wild-2 and return those samples to the Earth for analysis. Mission design and operational navigation for Stardust is performed by the Jet Propulsion Laboratory (JPL). This paper will describe the extensive JPL effort in support of the Stardust pre-launch analysis of the orbit determination component of the mission covariance study. A description of the mission and it's trajectory will be provided first, followed by a discussion of the covariance procedure and models. Predicted accuracy's will be examined as they relate to navigation delivery requirements for specific critical events during the mission. Stardust was launched into a heliocentric trajectory in early 1999. It will perform an Earth Gravity Assist (EGA) on January 15, 2001 to acquire an orbit for the eventual rendezvous with comet Wild-2. The spacecraft will fly through the coma (atmosphere) on the dayside of Wild-2 on January 2, 2004. At that time samples will be obtained using an aerogel collector. After the comet encounter Stardust will return to Earth when the Sample Return Capsule (SRC) will separate and land at the Utah Test Site (UTTR) on January 15, 2006. The spacecraft will however be deflected off into a heliocentric orbit. The mission is divided into three phases for the covariance analysis. They are 1) Launch to EGA, 2) EGA to Wild-2 encounter and 3) Wild-2 encounter to Earth reentry. Orbit determination assumptions for each phase are provided. These include estimated and consider parameters and their associated a-priori uncertainties. Major perturbations to the trajectory include 19 deterministic and statistical maneuvers planned for the mission. The spacecraft is three axis stabilized and has unbalanced thrusters for attitude control. Accelerations due to the attitude control system are treated stochastically. The tracking scenario for the study is patterned after the actual schedule employed during the different phases of the mission. Conventional X-band two-way Doppler and SRA range data was simulated and the standard accuracy for these data types was assumed throughout most of the mission. However, a deweighting scheme was used for the Doppler data during times of low Sun-Earth-Probe angles, especially in the case of the DSM. Optical data is assumed to be available starting at 50 days prior to the comet encounter. The optical data will be used to improve the ephemeris of Wild-2, which is considered crucial to properly target the comet flyby. Results of the covariance analysis are presented for all mission phases. Navigation capability will be discussed in terms of the uncertainty in the encounter B-Plane (B.R and B.T) and linearized time of flight. Delivery errors based on the final maneuver prior to the comet encounter will be presented. The most stringent navigation requirement is for the Earth reentry. The uncertainty in the flight path angle must be less than 0.02 degree (orbit determination and maneuver performance) to assure successful recovery of the SRC. Results presented show that this requirement can be met.

Menon, Premkumar R.↗

Ulysses

The DSN (Deep Space Network) mission support requirements for Ulysses are summarized. The primary goal of the Ulysses mission is to explore the Sun, its environment, and possible links between solar variability and terrestrial weather and climate. The Ulysses spacecraft will be injected into an interplanetary orbit toward Jupiter after which the spacecraft travels in a heliocentric, out-of-ecliptic orbit with high heliographic inclination. The Ulysses mission objectives are outlined and the DSN support requirements are defined through the presentation of tables and narratives describing the spacecraft flight profile; DSN support coverage; frequency assignments; support parameters for telemetry, command and support systems; and tracking support responsibility.

Meeks, W.↗

Heliocentric Escape and Lunar Impact from Near Rectilinear Halo Orbits

Spacecraft departing from the Gateway in a Near Rectilinear Halo Orbit (NRHO) experience gravitational forces from the Moon, the Earth, and the Sun, all of which can be simultaneously significant. These complex dynamics influence the post-separation risk of recontact with the Gateway and the eventual destinations of the departing spacecraft. The current investigation examines the flow of objects leaving NRHOs in the Bicircular Restricted Four-Body Problem, and results are applied to heliocentric escape and lunar impact trajectories in a higher-fidelity ephemeris model. Separation maneuver magnitude, direction, and location are correlated with risk of recontact with the Gateway and successful departure to various destinations.

Davis, Diane C.↗

Trajectory description

The launch, interplanetary, encounter, and Mars orbit phases of the Viking 1 and 2 spacecraft trajectories are described. Time history plots of several parameters relative to the trajectories are presented along with tables of the geocentric, heliocentric, aerocentric, and injection orbital elements appropriate to each of the spacecraft trajectories.

Farless, D. L.↗

Is There an Exoplanet in the Solar System?

We investigate the prospects for the capture of the proposed Planet 9 from other stars in the Sun’s birth cluster. Any capture scenario must satisfy three conditions: the encounter must be more distant than ∼150 au to avoid perturbing the Kuiper belt; the other star must have a wide-orbit planet (a ≳ 100 au); the planet must be captured on to an appropriate orbit to sculpt the orbital distribution of wide-orbit Solar system bodies. Here we use N-body simulations to show that these criteria may be simultaneously satisfied. In a few per cent of slow close encounters in a cluster, bodies are captured on to heliocentric, Planet 9-like orbits. During the ∼100 Myr cluster phase, many stars are likely to host planets on highly eccentric orbits with apastron distances beyond 100 au if Neptune-sized planets are common and susceptible to planet–planet scattering. While the existence of Planet 9 remains unproven, we consider capture from one of the Sun’s young brethren a plausible route to explain such an object’s orbit. Capture appears to predict a large population of trans-Neptunian objects (TNOs) whose orbits are aligned with the captured planet, and we propose that different formation mechanisms will be distinguishable based on their imprint on the distribution of TNOs.

Kuiper belt↗

Slow Solar Wind Connection Science during Solar Orbiter's First Close Perihelion Passage

The Slow Solar Wind Connection Solar Orbiter Observing Plan (Slow Wind SOOP) was developed to utilize the extensive suite of remote-sensing and in situ instruments on board the ESA/NASA Solar Orbiter mission to answer significant outstanding questions regarding the origin and formation of the slow solar wind. The Slow Wind SOOP was designed to link remote-sensing and in situ measurements of slow wind originating at open–closed magnetic field boundaries. The SOOP ran just prior to Solar Orbiter's first close perihelion passage during two remote-sensing windows (RSW1 and RSW2) between 2022 March 3–6 and 2022 March 17–22, while Solar Orbiter was at respective heliocentric distances of 0.55–0.51 and 0.38–0.34 au from the Sun. Coordinated observation campaigns were also conducted by Hinode and IRIS. The magnetic connectivity tool was used, along with low-latency in situ data and full-disk remote-sensing observations, to guide the target pointing of Solar Orbiter. Solar Orbiter targeted an active region complex during RSW1, the boundary of a coronal hole, and the periphery of a decayed active region during RSW2. Postobservation analysis using the magnetic connectivity tool, along with in situ measurements from MAG and SWA/PAS, showed that slow solar wind originating from two out of three of the target regions arrived at the spacecraft with velocities between ∼210 and 600 km s −1 . The Slow Wind SOOP, despite presenting many challenges, was very successful, providing a blueprint for planning future observation campaigns that rely on the magnetic connectivity of Solar Orbiter.

Slow solar wind↗