Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

The Autonomous Precision Landing and Hazard Detection and Avoidance Technology (ALHAT)

As NASA plans to send humans back to the Moon and develop a lunar outpost, technologies must be developed to place humans and cargo safely, precisely, repeatedly, on the lunar surface with the capability to avoid surface hazards. Exploration Space Architecture Study requirements include the need for global lunar surface access with safe, precise landing without lighting constraints on terrain that may have landing hazards for human scale landing vehicles. Landing accuracies of perhaps 1,000 meters for sortie crew missions to 10 s of meters for Outpost class missions are required. The Autonomous precision Landing Hazard Avoidance Technology (ALHAT) project will develop the new and unique descent and landing Guidance, Navigation and Control (GNC) hardware and software technologies necessary for these capabilities. The ALHAT project will qualify a lunar descent and landing GNC system to a Technology Readiness Level (TRL) of 6 capable of supporting lunar crewed, cargo, and robotic missions. The (ALHAT) development project was chartered by NASA Headquarters in October 2006. The initial effort to write a project plan and define an ALHAT Team was followed by a fairly aggressive research and analysis effort to determine what technologies existed that could be developed and applied to the lunar landing problems indicated above. This paper describes the project development, research, analysis and concept evolution that has occurred since the assignment of the project. This includes the areas of systems engineering, GNC, sensors, sensor algorithms, simulations, fielding testing, laboratory testing, Hardware-In-The-Loop testing, system avionics and system certification concepts.

Epp, Chirold D.↗

Building and Leading the Next Generation of Exploration Launch Vehicles

NASA s Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human spaceflight to the Moon and beyond. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicle. In 2009, the Ares Projects plan to: conduct the first flight test of Ares I, test-fire the Ares I first stage solid rocket motor; build the first integrated Ares I upper stage; continue testing hardware for the J-2X upper stage engine, and continue refining the design of the Ares V cargo launch vehicle. These efforts come with serious challenges for the project leadership team as it continues to foster a culture of ownership and accountability, operate with limited funding, and works to maintain effective internal and external communications under intense external scrutiny.

Cook, Stephen A.↗

XML technology planning database : lessons learned

A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

prototype databases↗

High Performance non-PGM Transition Metal Oxide ORR Catalysts of PEMFCs

This project was designed to develop acid-stable PGM-free transition metal oxide oxygen reduction reaction (ORR) electrocatalysts to meet or exceed the performance and durability of the DOE 2020 Technical Targets for platinum-group metal (PGM) free electrocatalysts from first-principles to incorporation into membrane-electrode assemblies (MEAs) for polymer electrolyte membrane (PEM) fuel cells. The planned project was to accomplish this goal with a multi-step approach: 1) materials modeling and experimental screening to identify acid-stable oxides with high ORR activity, 2) optimization of catalyst particle size and catalyst/carbon/ionomer catalyst layer composition, 3) fabrication of MEAs for performance and durability testing. During the course of this project: 1) acid-stability descriptors were developed for manganese oxides; 2) a family of acid-stable multicomponent oxides based on antimony were developed; 3) a flexible synthesis for the formation of nanocrystalline nonstoichiometric oxides was developed; 4) limited ORR activity but modest and improving oxygen evolution reaction (OER) activity was measured for multicomponent antimony oxides. The project was programmed into five technical tasks: The development of acid-stable ORR electrocatalytic oxides through 1) identification and optimization of acid-stable oxide compositions, and 2) electrochemical characterization; 3) optimization of catalyst layer composition for MEAs using identified ORR electrocatalysts; 4) MEA fabrication and performance testing to result in performance of 44 mA-cm-2 at 0.9 V vs. RHE; and 5) accelerated-stress testing of optimized MEAs. Because no acid-stable oxide was identified with the requisite activity for ORR (4.4 µA-cm-2oxide intrinsic activity at 0.9 V vs. RHE) within the time and budget allotted in Tasks 1 and 2, the project was halted at the end of phase 1, with no activity in Tasks 3-5. The research output, while not succeeding in developing ORR electrocatalysts, advanced the development of acid-stable oxide materials, showing potential for further improvement as OER electrocatalysts.

08 HYDROGEN↗

DSN human factors project

The project plan was to hold focus groups to identify the factors influencing the ease of use characteristics of software and to bond the problem. A questionnaire survey was conducted to evaluate those factors which were more appropriately measured with that method. The performance oriented factors were analyzed and relationships hypothesized. The hypotheses were put to test in the experimental phase of the project. In summary, the initial analysis indicates that there is an initial performance effect favoring computer controlled dialogue but the advantage fades fast as operators become experienced. The user documentation style is seen to have a significant effect on performance. The menu and prompt command formats are preferred by inexperienced operators. The short form mnemonic is least favored. There is no clear best command format but the short form mnemonic is clearly the worst.

Chafin, R. L.↗

Review of Feasibility and Cost Drivers for Floating Offshore Wind Energy in Washington State

The state of Washington must double its clean electricity supply by 2050 to meet its clean energy goals and comply with the Clean Energy Transformation Act. With more than 6.6 GW of technical resource potential in federal waters where Bureau of Ocean Energy Management has leasing authority, offshore wind energy could play an important role in diversifying Washington State's clean energy mix, reducing dependence on out-of-state energy sources, and helping meet state decarbonization goals. Decision makers need technology-specific information to assist with long-term energy system planning, so the Bureau of Ocean Energy Management requested that the National Renewable Energy Laboratory provide an overview of several drivers of offshore wind energy feasibility and cost in Washington. This study summarizes some of the existing engagement efforts and perspectives on offshore wind energy in the region and quantifies the offshore wind resources in Washington as well as technology costs and performance of potential projects. Furthermore, this report reviews existing grid and port infrastructure and discusses infrastructure needs along with information gaps. This study also explores opportunities and barriers to Washington entities supporting the broader floating offshore wind energy supply chain along the U.S. West Coast. Note that this study is not part of a formal project planning process or official engagement effort, nor does it assess environmental or economic impacts from potential offshore wind energy development.

17 WIND ENERGY↗

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Exploration Life Support Critical Questions for Future Human Space Missions

Exploration Life Support (ELS) is a current project under NASA's Exploration Systems Mission Directorate. The ELS Project plans, coordinates and implements the development of advanced life support technologies for human exploration missions in space. Recent work has focused on closed loop atmosphere and water systems for long duration missions, including habitats and pressurized rovers. But, what are the critical questions facing life support system developers for these and other future human missions? This paper explores those questions and how progress in the development of ELS technologies can help answer them. The ELS Project includes the following Elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems, Habitation Engineering, Systems Integration, Modeling and Analysis, and Validation and Testing, which includes the Sub-Elements Flight Experiments and Integrated Testing. Systems engineering analysis by ELS seeks to optimize overall mission architectures by considering all the internal and external interfaces of the life support system and the potential for reduction or reuse of commodities. In particular, various sources and sinks of water and oxygen are considered along with the implications on loop closure and the resulting launch mass requirements. Systems analysis will be validated through the data gathered from integrated testing, which will demonstrate the interfaces of a closed loop life support system. By applying a systematic process for defining, sorting and answering critical life support questions, the ELS project is preparing for a variety of future human space missions

Kwert, Michael K.↗

Exploration Life Support Critical Questions for Future Human Space Missions

Exploration Life Support (ELS) is a project under NASA s Exploration Technology Development Program. The ELS Project plans, coordinates and implements the development of advanced life support technologies for human exploration missions in space. Recent work has focused on closed loop atmosphere and water systems for a lunar outpost, including habitats and pressurized rovers. But, what are the critical questions facing life support system developers for these and other future human missions? This paper explores those questions and discusses how progress in the development of ELS technologies can help answer them. The ELS Project includes Atmosphere Revitalization Systems (ARS), Water Recovery Systems (WRS), Waste Management Systems (WMS), Habitation Engineering, Systems Integration, Modeling and Analysis (SIMA), and Validation and Testing, which includes the sub-elements Flight Experiments and Integrated Testing. Systems engineering analysis by ELS seeks to optimize the overall mission architecture by considering all the internal and external interfaces of the life support system and the potential for reduction or reuse of commodities. In particular, various sources and sinks of water and oxygen are considered along with the implications on loop closure and the resulting launch mass requirements.

Ewert, Michael K.↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The regional characterization work conducted by the Geoteams during the MRCSP Phase III project period (2010 – 2019) focused on the following tasks: (1) refinement of geologic seals/reservoir systems; (2) assessment of Atlantic Coastal Plain and offshore opportunities; (3) expanded assessments of oil and gas fields, particularly as they relate to enhanced recovery opportunities; (4) regional support for implementation of carbon capture utilization and storage (CCUS) in the partnership area; and (5) communication and data sharing. The findings of this work are summarized in the final report entitled Final Report of Geologic Carbon Capture Utilization and Storage Opportunities in the form of a state-by-state presentation for the MRCSP Region. In addition to the capstone deliverable mentioned above, the Geoteams have also prepared a series of topical reports to elaborate on specific geologic intervals and/or geographic areas of study completed during the Phase III project period. Specifically, these topical reports address: (1) the Atlantic Coastal Plain and adjacent offshore; (2) Cambro-Ordovician reservoirs/seals in the region; (3) enhanced oil and gas recovery opportunities in the Appalachian Basin; and (4) enhanced oil recovery (EOR) in the Michigan Basin. The remainder of this topical report presents our findings relative to enhanced recovery opportunities in the Appalachian Basin.

54 ENVIRONMENTAL SCIENCES↗

The Life Sciences program at the NASA Ames Research Center - An overview

The research projects planned for the Life Sciences program have a goal of answering basic questions concerning the nature of life itself and its evolution in the universe from basic elements, as well as the search for extraterrestrial intelligence. The program also includes studies of the evolution and development of life on the planet earth, and the global changes occurring today that affect life on the earth. The paper describes the simulation models developed to study the effects of space, the flight projects of the program, and the biomedical program, which currently focuses on the physiological changes in the human body that are associated with space flights and the interactions among these changes.

Vernikos-Danellis, Joan↗

Software Engineering Research/Developer Collaborations (C104)

The goal of this collaboration was to produce Flight Software Branch (FSB) process standards for software inspections which could be used across three new missions within the FSB. The standard was developed by Dr. Forrest Shull (Fraunhofer Center for Experimental Software Engineering, Maryland) using the Perspective-Based Inspection approach, (PBI research has been funded by SARP) , then tested on a pilot Branch project. Because the short time scale of the collaboration ruled out a quantitative evaluation, it would be decided whether the standard was suitable for roll-out to other Branch projects based on a qualitative measure: whether the standard received high ratings from Branch personnel as to usability and overall satisfaction. The project used for piloting the Perspective-Based Inspection approach was a multi-mission framework designed for reuse. This was a good choice because key representatives from the three new missions would be involved in the inspections. The perspective-based approach was applied to produce inspection procedures tailored for the specific quality needs of the branch. The technical information to do so was largely drawn through a series of interviews with Branch personnel. The framework team used the procedures to review requirements. The inspections were useful for indicating that a restructuring of the requirements document was needed, which led to changes in the development project plan. The standard was sent out to other Branch personnel for review. Branch personnel were very positive. However, important changes were identified because the perspective of Attitude Control System (ACS) developers had not been adequately represented, a result of the specific personnel interviewed. The net result is that with some further work to incorporate the ACS perspective, and in synchrony with the roll out of independent Branch standards, the PBI approach will be implemented in the FSB. Also, the project intends to continue its collaboration with the technology provider (Dr. Forrest Shull) past the end of the grant, to allow a more rigorous quantitative evaluation.

Shell, Elaine↗

Overview of the Predictive Simulation Capability Element of the Plume Surface Interaction Project

As part of the Game Changing Development (GCD) Program, funded by NASA’s Space Technology Mission Directorate (STMD), the development of simulation capability for the prediction of extra-terrestrial Plume Surface Interaction (PSI) environments has been undertaken by the Fluid Dynamics Branch at NASA/MSFC. The GCD PSI Project, planned to be completed over a four year period, contains a Predictive Simulation Capability (PSC) Element focused on creating simulation capability for the reliable and accurate prediction of PSI in Martian (~650 Pa) and Lunar (vacuum) ambient environments. In addition to the PSC Element, the GCD Program also contains a companion Ground Testing Element for development of focused datasets for validation of predictive capability as well as a Flight-focused Instrumentation Element. This paper describes the PSC Element of the PSI Project as well as providing descriptions of recent accomplishments and remaining work. The overall structure of the PSC Element is broken down into four areas of focus. The first area is the Prediction of Plume Flow in low pressure environments. The development approach taken is the augmentation of the existing production-mode computational fluid dynamics (CFD) tool Loci/Chem, with targeted extensions necessary to accurately model rarefied conditions found in both Martian and Lunar applications. Production readiness and validation of predictive capability are the major objectives of this task. The second area is the effect of mixed continuum/rarefied flow on crater development and ejecta sheets. A new CFD application, Loci/GGFS (Gas Granular Flow Solver), is being developed which implements an Eulerian/Eulerian two-phase model of gas- and soil-phases in order to simulate the soil erosion, crater formation, and soil ejecta transport in a fully coupled simulation. This task seeks to verify Loci/GGFS is production-ready as well as perform validation studies to determine the degree of predictive capability achieved by Loci/GGFS. The third area is focused on the details and extension of particle phase modeling of soil. In this task, Discrete Element Modeling (DEM) techniques are used to perform direct simulations of complex soil particles under the action of forcing similar to that to be cause by PSI. The simulation results are then used to construct closures to the Eulerian model of the soil phase used by Loci/GGFS. The fourth area is gas-particle interaction modeling. In this task, experiments are being conducted as well as detailed simulation results are being studied to further understand the complexities of gas-particle interactions in dilute, intermediate, and high soil volume fraction regimes. Improved models of particle drag and the particle turbulent kinetic energy (PTKE) resulting from the interaction of gas flows within particle clouds are the objective of this task.

Jeff West↗

Design approaches to more energy efficient engines

In 1976 NASA initiated the Aircraft Energy Efficiency (ACEE) Program to assist in the development of technology for more fuel-efficient aircraft for commercial airline use. The Energy Efficient Engine (EEE) Project of the ACEE program is intended to lay the advanced-technology foundation for a new generation of turbofan engines. This project, planned as a seven-year cooperative government-industry effort, is aimed at developing and demonstrating advanced component and systems technologies for engines that could be introduced into airline service by the late 1980s or early 1990s. In addition to fuel savings, new engines must offer potential for being economically attractive to the airline users and environmentally acceptable. A description is presented of conceptual energy-efficient engine designs which offer potential for achieving all of the goals established for the EEE Project.

Saunders, N. T.↗

Crustal Dynamics Project - Status and plans

The progress of the NASA Crustal Dynamics Project is summarized. The Project is performed to measure regional deformation and strain accumulation due to large earthquakes in the plate boundary region of western N. America, to measure relative plate motions around the globe, to measure internal deformations of continental and oceanic lithospheric plates, to relate the rotational dynamics of the earth to earthquakes, plate motions and other geophysical phenomena and to measure regional fault motions and strain accumulation globally. VLBI and satellite laser ranging (SLR) have been employed using several base and mobile stations in N. America, Europe, S. America and the S. Pacific. Satellite data are being gathered with the LAGEOS spacecraft. Measurement campaigns in S. America and the Carribbean and Mediterranean regions will be carried out with new instrumentation in 1985.

Coates, R. J.↗