Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Payload analysis for space shuttle applications (study 2.2). Volume 3: Payload system operations analysis (task 2.2.1)

The technical and cost analysis that was performed for the payload system operations analysis is presented. The technical analysis consists of the operations for the payload/shuttle and payload/tug, and the spacecraft analysis which includes sortie, automated, and large observatory type payloads. The cost analysis includes the costing tradeoffs of the various payload design concepts and traffic models. The overall objectives of this effort were to identify payload design and operational concepts for the shuttle which will result in low cost design, and to examine the low cost design concepts to identify applicable design guidelines. The operations analysis examined several past and current NASA and DoD satellite programs to establish a shuttle operations model. From this model the analysis examined the payload/shuttle flow and determined facility concepts necessary for effective payload/shuttle ground operations. The study of the payload/tug operations was an examination of the various flight timelines for missions requiring the tug.

Source record↗

IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations

A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.

Source record↗

Digital command system

The correct processing of the Digital Command System (DCS), which provides a limited real-time means of controlling specific flight program functions, was verified. The ability of the flight program to correctly read and process DCS commands was verified. Tests made by the flight program after reading the contents of the command decoder register to establish the validity of the received data were verified through the following: DCS mode command verification, DCS data command verification, DCS data validation, and DCS error message. The operation of the following DCS commands accepted and processed by the flight program was tested: time base update, navigation update, generalized switch selector, memory dump, terminate, execute generalized maneuver, return to nominal timeline, ECS water control valve logic inhibit, execute maneuver, execute alternate sequence, targeting load, ladder magnitude limit, S-IVB/IU de-orbit, compressed data dump, and remove inhibit on the extraction maneuver.

Source record↗

Simulation of man-machine interaction on shuttle payload manipulator

The main objective of this simulation was to evaluate the feasibility of a simplified control system for a remote manipulator for space shuttle payloads. The motion commanded by the operator through the control system to the six degree of freedom manipulator approximates that of a backhoe. Compatibility of low arm damping, heavy payloads, small clearances in the shuttle cargo bay and stringent mission timelines were evaluated. The effects of various devices to enhance visual cues were evaluated. Phase I of the simulation was capture of a payload flying free in space relative to the shuttle. Phase II was simulation of cargo stowage into a mockup of the space shuttle cargo bay. A shuttle remote manipulator control station mockup including TV monitors and hand controllers is used in the simulation. Results evaluating various parameters of the control system and the task, including arm flexibility, are presented.

Hookway, R. O.↗

Review of extravehicular activity for Shuttle program

Extravehicular activity (EVA) is a baselined Shuttle Orbiter capability. It can provide cost-effective servicing operations for payloads, on-orbit repair, and techniques for meeting various on-orbit contingencies. The basic EVA system planned consists of Orbiter-integral provisions, carry-on life support provisions, and EVA support equipment provisions. The Orbiter-integral provisions include the internal airlock, the EVA Egress module, and the docking module, each of which provides an egress path. The carry-on life support provisions will be two Extravehicular Mobility Units (EMU), composed of an Astronaut Life Support Assembly (ALSA) and a Space Suit Assembly (SSA). The support equipment includes tethers, special tools, translation aids, and workstations. The Shuttle Orbiter EVA requirements and possible tasks, EVA crew rescue equipment and techniques, crew support, EVA training, and EVA timeline activities are described.

Covington, J. H.↗

PPP/nonreal-time trajectory program interface requirements and capabilities

The selection process for interfacing a nonreal time trajectory program with the procedures and performance program is outlined; the interface provides summary data timelines for any desired trajectory profile. Consideration was given to two separate digital programs for satisfying capabilities. One was the CDC 6400 digital program BANDITO, and the second was the UNIVAC 1110 SVDS program.

Mcgavern, J. L.↗

User's manual for the Shuttle Electric Power System analysis computer program (SEPS), volume 2 of program documentation

The Shuttle Electric Power System Analysis SEPS computer program which performs detailed load analysis including predicting energy demands and consumables requirements of the shuttle electric power system along with parameteric and special case studies on the shuttle electric power system is described. The functional flow diagram of the SEPS program is presented along with data base requirements and formats, procedure and activity definitions, and mission timeline input formats. Distribution circuit input and fixed data requirements are included. Run procedures and deck setups are described.

Bains, R. W.↗

Atmospheric science facility pallet-only mode space transportation system payload (feasibility study), Volume 1

The economic and technical feasibility is assessed of employing a pallet-only mode for conducting Atmospheric Magnetospheric Plasmas-in-Space experiments. A baseline design incorporating the experiment and instrument descriptions is developed. The prime instruments are packaged into four pallets in a physical and functional manner compatible with the Space Transportation System capabilities and/or constraints and an orbiter seven-day mission timeline. Operational compatibility is verified between the orbiter/payload and supporting facilities. The development status and the schedule requirements applicable to the Atmospheric Science Facility mission are identified. Conclusions and recommendations are presented and discussed.

Source record↗

Continuation of advanced crew procedures development techniques

An operational computer program, the Procedures and Performance Program (PPP) which operates in conjunction with the Phase I Shuttle Procedures Simulator to provide a procedures recording and crew/vehicle performance monitoring capability was developed. A technical synopsis of each task resulting in the development of the Procedures and Performance Program is provided. Conclusions and recommendations for action leading to the improvements in production of crew procedures development and crew training support are included. The PPP provides real-time CRT displays and post-run hardcopy output of procedures, difference procedures, performance data, parametric analysis data, and training script/training status data. During post-run, the program is designed to support evaluation through the reconstruction of displays to any point in time. A permanent record of the simulation exercise can be obtained via hardcopy output of the display data and via transfer to the Generalized Documentation Processor (GDP). Reference procedures data may be transferred from the GDP to the PPP. Interface is provided with the all digital trajectory program, the Space Vehicle Dynamics Simulator (SVDS) to support initial procedures timeline development.

Arbet, J. D.↗

Tug ground operations - An approach to early identification of operational impacts

An approach to early identification of operational requirements is discussed together with an assessment of the impact of these requirements on the development and acquisition phase of a program. The approach is applied to the Space Tug program. Some of the more salient results of the Tug Fleet and Ground Operations Schedules and Controls study performed under a NASA/Marshall Space Flight Center contract are provided. Ground-processing requirements and flows are presented, including a summary of facility requirements, timelines, activities and options/contingency-provision recommendations. Programmatic recommendations resulting from the study are presented in areas of payload integration, activation requirements, fleet utilization, fleet sizing, costs, and WTR delta requirement for the Tug.

Best, J. L.↗

EVAL system concept definition. Partial spacelab payload, appendices

Tables and charts are presented for experiment schematics, mission opportunities, mission timelines, crew time line and power profile. The methodology being developed to evaluate cost effective vibroacoustic test plans for a representative EVAL shuttle spacelab payload is analyzed. Statistical decision theory is used to quantitatively evaluate seven alternate test plans which include component, subassembly, or payload testing and combinations of component assembly testing.

Source record↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Space station systems analysis study. Part 2, volume 3: Appendixes, Book 2: Supporting data (7 through 18)

Topics discussed include: (1) design considerations for a MARS sample return laboratory module for space station investigations; (2) crew productivity as a function of work shift arrangement; (3) preliminary analysis of the local logistics problem on the space construction base; (4) mission hardware construction operational flows and timelines; (5) orbit transfer vehicle concept definition; (6) summary of results and findings of space processing working review; (7) crew and habitability subsystem (option L); (8) habitability subsystem considerations for shuttle tended option L; (9) orbiter utilization in manned sortie missions; (10) considerations in definition of space construction base standard module configuration (option L); (11) guidance, control, and navigation subsystems; and (12) system and design tradeoffs.

Source record↗

Structural and assembly concepts for large erectable space systems

This paper presents a summary of studies performed by the Space Division of Rockwell under contract to the Langley Research Center of the NASA. The studies specifically addressed requirements and concepts for erectable structures ranging in size from 100 to 300 meters using the Shuttle Orbiter as the operation/assembly base. This paper discusses various types of structural configurations and building block elements and the criteria which influence their designs. A brief review is given concerning the subject of flight control. An assembly concept is presented - showing how the Orbiter may be equipped and operated to build large area structures. Estimates are also given for cargo bay stowage and mission timelines.

Katz, E.↗

Simulated EVA operation of a remote connector assembly test report

The features of a connector concept with respect to timelines and ease of connection by EVA (extravehicular activity), in various mating orientations were evaluated. The connector tests were conducted by thee EVA astronaut test subjects. Each of four test conditions (baseline, off angle, overhead, and with visual obstruction) were run three times by each of the test subjects. Time data were taken on each test run. Visual and voice communications with the subjects were recorded. The tests demonstrated that EVA personnel can perform connection tasks in relatively short times (generally one minute) and the connector configuration was a reasonable design base for such tasks. The in-situ communications and post-test comments indicated that the connector was generally acceptable but requires improvement to its manual interface features.

Lefever, A.↗

Thermal integration of Spacelab experiments

The method of thermally integrating the experiments for Spacelab is discussed. The scientific payload consists of a combination of European and United States sponsored experiments located in the module as well as on a single Spacelab pallet. The thermal integration must result in accomodating the individual experiment requirements as well as ensuring that the total payload is within the Spacelab Environmental Control System (ECS) resource capability. An integrated thermal/ECS analysis of the module and pallet is performed in concert with the mission timeline to ensure that the agreed upon experiment requirements are accommodated and to ensure the total payload is within the Spacelab ECS resources.

Patterson, W. C.↗

First Spacelab flight - A status report of the joint ESA/NASA mission

A general overview of the first Spacelab flight is presented and a table is given listing the payload composition. An accommodation study is presented with emphasis on the configuration, mass status, timeline, and experiment interface specifications. Also considered are flight and ground operations, safety factors, and payload specialists training for the first flight.

Craft, H. G., Jr.↗