Search NASA⌕ Search

SEARCH · Search NASA

Results for “arrival scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Strategic Surface Metering at Charlotte Douglas International Airport

NASA is conducting a field test of the Airspace Technology Demonstration2 (ATD-2) to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system. The IADS system was deployed to Charlotte Douglas International Airport (CLT) in 2017 for a three-year field evaluation. The Phase 1 field evaluation included tactical surface metering, which manages departure excess taxi time by tactically assigning gate holds. Phase 2 built upon the lessons learned from Phase 1 to extend surface metering into the strategic metering timeframes. In this paper, we describe the strategic metering capabilities of the ATD-2 IADS system and the operational results from CLT.

Airspace Technology Demonstration 2↗

Runway Operations Planning: A Two-Stage Heuristic Algorithm

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

Anagnostakis, Ioannis↗

How to Compute a Slot Marker - Calculation of Controller Managed Spacing Tools for Efficient Descents with Precision Scheduling

This paper describes the underlying principles and algorithms for computing the primary controller managed spacing (CMS) tools developed at NASA for precisely spacing aircraft along efficient descent paths. The trajectory-based CMS tools include slot markers, delay indications and speed advisories. These tools are one of three core NASA technologies integrated in NASAs ATM technology demonstration-1 (ATD-1) that will operationally demonstrate the feasibility of fuel-efficient, high throughput arrival operations using Automatic Dependent Surveillance Broadcast (ADS-B) and ground-based and airborne NASA technologies for precision scheduling and spacing.

efficient arrivals↗

A strategy to rotate the Mars Observer orbit node line to advance the mapping schedule

The Mars Observer (MO) spacecraft was successfully launched on September 25, 1992 and will arrive at Mars on August 24, 1993. At Mars, the spacecraft will study the planet's surface, atmosphere, and gravitational and magnetic fields. In order to achieve these scientific objectives, MO will be placed in a 2 PM (descending node) sun-synchronous orbit. Upon arrival at Mars, however, the longitude of the descending node will be approximately 15 deg greater than the desired value. The baseline plan requires a 59 day `waiting' period for the correct solar orientation to occur. During this period, 28 days are required for scientific experimentation but the remaining 30.6 days potentially could be eliminated. The strategy developed in this study examined the possibility of using any `excess' Delta-V available at Mars arrival to rotate the node line to the desired value and thus allow mapping to begin earlier. A preliminary analysis completed prior to launch is described that examined the entire launch period including the required Delta-V to perform the needed nodal rotation. A more detailed study performed after launch is also summarized.

Pernicka, Henry J.↗

Operational Concept for Flight Crews to Participate in Merging and Spacing of Aircraft

The predicted tripling of air traffic within the next 15 years is expected to cause significant aircraft delays and create a major financial burden for the airline industry unless the capacity of the National Airspace System can be increased. One approach to improve throughput and reduce delay is to develop new ground tools, airborne tools, and procedures to reduce the variance of aircraft delivery to the airport, thereby providing an increase in runway throughput capacity and a reduction in arrival aircraft delay. The first phase of the Merging and Spacing Concept employs a ground based tool used by Air Traffic Control that creates an arrival time to the runway threshold based on the aircraft s current position and speed, then makes minor adjustments to that schedule to accommodate runway throughput constraints such as weather and wake vortex separation criteria. The Merging and Spacing Concept also employs arrival routing that begins at an en route metering fix at altitude and continues to the runway threshold with defined lateral, vertical, and velocity criteria. This allows the desired spacing interval between aircraft at the runway to be translated back in time and space to the metering fix. The tool then calculates a specific speed for each aircraft to fly while enroute to the metering fix based on the adjusted land timing for that aircraft. This speed is data-linked to the crew who fly this speed, causing the aircraft to arrive at the metering fix with the assigned spacing interval behind the previous aircraft in the landing sequence. The second phase of the Merging and Spacing Concept increases the timing precision of the aircraft delivery to the runway threshold by having flight crews using an airborne system make minor speed changes during enroute, descent, and arrival phases of flight. These speed changes are based on broadcast aircraft state data to determine the difference between the actual and assigned time interval between the aircraft pair. The airborne software then calculates a speed adjustment to null that difference over the remaining flight trajectory. Follow-on phases still under development will expand the concept to all types of aircraft, arriving from any direction, merging at different fixes and altitudes, and to any airport. This paper describes the implementation phases of the Merging and Spacing Concept, and provides high-level results of research conducted to date.

Baxley, Brian T.↗

Assessing Tactical Scheduler Options for Time-Based Surface Metering

NASA is committed to demonstrating a concept of integrated arrival, departure, and surface operations by 2020 under the Airspace Technology Demonstration 2 (ATD2) sub-project. This will be accomplished starting with a demonstration of flight specific time-based departure metering at Charlotte Douglass International Airport (CLT). ATD2 tactical metering capability is based on NASAs Spot And Runway Departure Advisor (SARDA) which has been tested successfully in human-in-the-loop simulations of CLT. SARDA makes use of surface surveillance data and surface modeling to estimate the earliest takeoff time for each flight active on the airport surface or ready for pushback from the gate. The system then schedules each flight to its assigned runway in order of earliest takeoff time and assigns a target pushback time, displayed to ramp controllers as an advisory gate hold time. The objective of this method of departure metering is to move as much delay as possible to the gate to minimize surface congestion and engine on-time, while keeping sufficient pressure on the runway to maintain throughput. This flight specific approached enables greater flight efficiency and predictability, facilitating trajectory-based operations and surface-airspace integration, which ATD2 aims to achieve.Throughout ATD2 project formulation and system development, researchers have continuously engaged with stakeholders and future users, uncovering key system requirements for tactical metering that SARDA did not address. The SARDA scheduler is updated every 10 seconds using real-time surface surveillance data to ensure the most up-to-date information is used to predict runway usage. However, rapid updates also open the potential for fluctuating advisories, which Ramp controllers at a busy airport like CLT find unacceptable. Therefore, ATD2 tactical metering requires that all advisories freeze once flights are ready so that Ramp controllers may communicate a single hold time when responding to pilot ready calls.

Zelinski, Shannon↗

STS-106 Crew Interviews: Scott D. Altman

Live footage of a preflight interview with Pilot Scott D. Altman is seen. The interview addresses many different questions including why Altman became a pilot, the events that led to his interest, his career path through the Navy, and then finally, his selection by NASA as an astronaut. Other interesting information discussed in this one-on-one interview was his work on the movie set of "Top Gun," the highlights of his Navy career, and possible shorter time frame turnarounds for missions. Altman also mentions the scheduled docking with the new International Space Station (ISS) after the arrival of the Zvezda Service Module.

Source record↗

Aerocapture navigation at Neptune

A proposed Neptune orbiter Aerocapture mission will use solar electric propulsion to send an orbiter to Neptune. Navigation feasibility of direct-entry aerocapture for orbit insertion at Neptune is shown. The navigation strategy baselines optical imaging and (delta)VLBI measurement in order to satisfy the flight system's atmosphere entry flight path angle, which is targeted to enter Neptune with an entry flight path angle of -11.6 . Error bars on the entry flight path angle of plus/minus0.55 (3(sigma)) are proposed. This requirement can be satisfied with a data cutoff 3.2 days prior to arrival. There is some margin in the arrival template to tighten (i.e. reduce) the entry corridor either by scheduling a data cutoff closer to Neptune or alternatively, reducing uncertainties by increasing the fidelity of the optical navigation camera.

interplanetary navigation↗

Avionics Configuration Assessment for Flightdeck Interval Management: A Comparison of Avionics and Notification Methods

Flightdeck Interval Management is one of the NextGen operational concepts that FAA is sponsoring to realize requisite National Airspace System (NAS) efficiencies. Interval Management will reduce variability in temporal deviations at a position, and thereby reduce buffers typically applied by controllers - resulting in higher arrival rates, and more efficient operations. Ground software generates a strategic schedule of aircraft pairs. Air Traffic Control (ATC) provides an IM clearance with the IM spacing objective (i.e., the TTF, and at which point to achieve the appropriate spacing from this aircraft) to the IM aircraft. Pilots must dial FIM speeds into the speed window on the Mode Control Panel in a timely manner, and attend to deviations between actual speed and the instantaneous FIM profile speed. Here, the crew is assumed to be operating the aircraft with autothrottles on, with autopilot engaged, and the autoflight system in Vertical Navigation (VNAV) and Lateral Navigation (LNAV); and is responsible for safely flying the aircraft while maintaining situation awareness of their ability to follow FIM speed commands and to achieve the FIM spacing goal. The objective of this study is to examine whether three Notification Methods and four Avionics Conditions affect pilots' performance, ratings on constructs associated with performance (workload, situation awareness), or opinions on acceptability. Three Notification Methods (alternate visual and aural alerts that notified pilots to the onset of a speed target, conformance deviation from the required speed profile, and reminded them if they failed to enter the speed within 10 seconds) were examined. These Notification Methods were: VVV (visuals for all three events), VAV (visuals for all three events, plus an aural for speed conformance deviations), and AAA (visual indications and the same aural to indicate all three of these events). Avionics Conditions were defined by the instrumentation (and location) used to present IM information to crews: (1) Integrated (IM information is embedded in extant PFD (Primary Flight Display), ND (Navigation Display), EICAS (Engine Indicating and Crew Alerting System) displays); (2) EFB_Aft (IM information is only supplied in an EFB and mounted in location similar to that for MITRE's UPS work); (3) EFB_Fore (IM information is only supplied in an EFB which is mounted more forward, under the side window), and (4) EFB_Aft plus use of an AGD (the same IM information is supplied in an EFB and on an AGD, both mounted in locations similar to that in MITRE's UPS work ). Twelve commercial pilot crews flew descent scenarios (VNAV Speed with the mode control panel (MCP) speed window open until flaps extended, then VNAV Path) in a commercial transport flight simulator with realistic visual scene and communications. The results of this study serve three practical aims: (1) contribute to the down-select of avionics configuration for future assessment of the ASTAR spacing algorithm at NASA; (2) provide information useful to the FAA Human Factors Division (ANG-C1)'s mission to identify issues pertinent to flight certification of, and flight standards; (3) identify methodological considerations in support of future FIM human-in-the-loop (HITL) investigations.

Latorella, Kara A.↗

Final Mission and Navigation Design for the 2016 Mars InSight Mission

NASA’s Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) mission was scheduled to launch the next lander to Mars in March 2016 arriving to the Red Planet in the fall. Derived from the Phoenix mission which successfully landed on Mars in May 2008, the InSight Entry, Descent, and Landing system will place a lander in the Elysium Planitia region. This paper specifies the mission and navigation requirements set by the Project and how the final mission and navigation design satisfies those requirements. Background information affecting navigation including spacecraft modeling and the physical environment which influences the spacecraft motion are included. (Note from the author: The InSight launch in 2016 was suspended due to critical issues with the Seismic Experiment for Interior Structure (SEIS) instrument that could not be fixed prior to the planned launch period. This paper represents the state of the design for the 2016 mission. No attempt has been made to reflect the latest developments).

Abilleira, Fernando↗

Comparison Between Continuous and Intermittent Actigraphy Outcomes During Long-Duration Missions

INTRODUCTION Historically, astronauts have worn actigraphy watches continuously throughout their missions. This has enabled reliable sleep estimation and comparisons between sleep and other outcomes and mission activities such as the arrival of a visiting vehicle. However in late 2020, astronauts were scheduled to wear an actiwatch for one 2-week period every two months, substantially decreasing availability of data. Our aim was to compare sleep and mission events between data collected continuously and data collected intermittently to identify any differences. METHODS Crewmembers (n = 19) who volunteered for the NASA Standard Measures protocol between January 2019 and March 2022 were provided with actiwatches (Phillips, Respironics, Bend OR) that they wore either continuously (C; n = 9) or for two weeks every two months while in space (2W; n = 10). We used crew schedules to identify mission events that were asynchronous with actigraphy. We further compared sleep outcomes (sleep duration, wake after sleep onset [WASO], sleep efficiency) between the C and 2W actigraphy collection. RESULTS In the 2W group, sleep data was not available for 52% of EVAs, 67% of visiting vehicle events, and 67% of commander turnovers. Average sleep duration for the 2W group (M = 6.91, ± 1.24 SD) was significantly lower compared to the C group (7.51 ± 1.08, p < .01). Sleep efficiency was better for those in the C group (90.56 ± 5.19) than for those in the 2W group (87.02 ± 6.47 p < .01). There were no significant differences in WASO (C = 26.66 ±12.99; 2W = 32.38 ± 18.83). DISCUSSION Continuous actigraphy data collection yields different sleep outcomes compared to intermittent data collection. In addition, many mission events were not captured with intermittent data collection. Our findings support the use of continuous actigraphy data collection.

fatigue↗

Air traffic management evaluation tool

Methods for evaluating and implementing air traffic management tools and approaches for managing and avoiding an air traffic incident before the incident occurs. A first system receives parameters for flight plan configurations (e.g., initial fuel carried, flight route, flight route segments followed, flight altitude for a given flight route segment, aircraft velocity for each flight route segment, flight route ascent rate, flight route descent route, flight departure site, flight departure time, flight arrival time, flight destination site and/or alternate flight destination site), flight plan schedule, expected weather along each flight route segment, aircraft specifics, airspace (altitude) bounds for each flight route segment, navigational aids available. The invention provides flight plan routing and direct routing or wind optimal routing, using great circle navigation and spherical Earth geometry. The invention provides for aircraft dynamics effects, such as wind effects at each altitude, altitude changes, airspeed changes and aircraft turns to provide predictions of aircraft trajectory (and, optionally, aircraft fuel use). A second system provides several aviation applications using the first system. Several classes of potential incidents are analyzed and averted, by appropriate change en route of one or more parameters in the flight plan configuration, as provided by a conflict detection and resolution module and/or traffic flow management modules. These applications include conflict detection and resolution, miles-in trail or minutes-in-trail aircraft separation, flight arrival management, flight re-routing, weather prediction and analysis and interpolation of weather variables based upon sparse measurements. The invention combines these features to provide an aircraft monitoring system and an aircraft user system that interact and negotiate changes with each other.

Sridhar, Banavar↗

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗

Runway Operations Planning: A Two-Stage Solution Methodology

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program. Preliminary results from the algorithm implementation on real-world traffic data are included.

Anagnostakis, Ioannis↗

Analyzing Double Delays at Newark Liberty International Airport

When weather or congestion impacts the National Airspace System, multiple different Traffic Management Initiatives can be implemented, sometimes with unintended consequences. One particular inefficiency that is commonly identified is in the interaction between Ground Delay Programs (GDPs) and time based metering of internal departures, or TMA scheduling. Internal departures under TMA scheduling can take large GDP delays, followed by large TMA scheduling delays, because they cannot be easily fitted into the overhead stream. In this paper we examine the causes of these double delays through an analysis of arrival operations at Newark Liberty International Airport (EWR) from June to August 2010. Depending on how the double delay is defined between 0.3 percent and 0.8 percent of arrivals at EWR experienced double delays in this period. However, this represents between 21 percent and 62 percent of all internal departures in GDP and TMA scheduling. A deep dive into the data reveals that two causes of high internal departure scheduling delays are upstream flights making up time between their estimated departure clearance times (EDCTs) and entry into time based metering, which undermines the sequencing and spacing underlying the flight EDCTs, and high demand on TMA, when TMA airborne metering delays are high. Data mining methods (currently) including logistic regression, support vector machines and K-nearest neighbors are used to predict the occurrence of double delays and high internal departure scheduling delays with accuracies up to 0.68. So far, key indicators of double delay and high internal departure scheduling delay are TMA virtual runway queue size, and the degree to which estimated runway demand based on TMA estimated times of arrival has changed relative to the estimated runway demand based on EDCTs. However, more analysis is needed to confirm this.

traffic management advisor↗

Streamlined acquisition handbook

NASA has always placed great emphasis on the acquisition process, recognizing it as among its most important activities. This handbook is intended to facilitate the application of streamlined acquisition procedures. The development of these procedures reflects the efforts of an action group composed of NASA Headquarters and center acquisition professionals. It is the intent to accomplish the real change in the acquisition process as a result of this effort. An important part of streamlining the acquisition process is a commitment by the people involved in the process to accomplishing acquisition activities quickly and with high quality. Too often we continue to accomplish work in 'the same old way' without considering available alternatives which would require no changes to regulations, approvals from Headquarters, or waivers of required practice. Similarly, we must be sensitive to schedule opportunities throughout the acquisition cycle, not just once the purchase request arrives at the procurement office. Techniques that have been identified as ways of reducing acquisition lead time while maintaining high quality in our acquisition process are presented.

Source record↗

The MICRO-BOSS scheduling system: Current status and future efforts

In this paper, a micro-opportunistic approach to factory scheduling was described that closely monitors the evolution of bottlenecks during the construction of the schedule and continuously redirects search towards the bottleneck that appears to be most critical. This approach differs from earlier opportunistic approaches, as it does not require scheduling large resource subproblems or large job subproblems before revising the current scheduling strategy. This micro-opportunistic approach was implemented in the context of the MICRO-BOSS factory scheduling system. A study comparing MICRO-BOSS against a macro-opportunistic scheduler suggests that the additional flexibility of the micro-opportunistic approach to scheduling generally yields important reductions in both tardiness and inventory. Current research efforts include: adaptation of MICRO-BOSS to deal with sequence-dependent setups and development of micro-opportunistic reactive scheduling techniques that will enable the system to patch the schedule in the presence of contingencies such as machine breakdowns, raw materials arriving late, job cancellations, etc.

Sadeh, Norman M.↗