Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Sustainable Mars Sample Return

The proposed Mars sample return mission will be completed using natural Martian resources for the majority of its operations. The system uses the following technologies: In-Situ Propellant Production (ISPP), a methane-oxygen propelled Mars Ascent Vehicle (MAV), a carbon dioxide powered hopper, and a hydrogen fueled balloon system (large balloons and small weather balloons). The ISPP system will produce the hydrogen, methane, and oxygen using a Sabatier reactor. a water electrolysis cell, water extracted from the Martian surface, and carbon dioxide extracted from the Martian atmosphere. Indigenous hydrogen will fuel the balloon systems and locally-derived methane and oxygen will fuel the MAV for the return of a 50 kg sample to Earth. The ISPP system will have a production cycle of 800 days and the estimated overall mission length is 1355 days from Earth departure to return to low Earth orbit. Combining these advanced technologies will enable the proposed sample return mission to be executed with reduced initial launch mass and thus be more cost efficient. The successful completion of this mission will serve as the next step in the advancement of Mars exploration technology.

Alston, Christie↗

Space Mobile Network: A Near Earth Communications and Navigation Architecture

This paper shares key findings of NASA's Earth Regime Network Evolution Study (ERNESt) team resulting from its 18-month effort to define a wholly new architecture-level paradigm for the exploitation of space by civil space and commercial sector organizations. Since the launch of Sputnik in October 1957 spaceflight missions have remained highly scripted activities from launch through disposal. The utilization of computer technology has enabled dramatic increases in mission complexity; but, the underlying premise that the diverse actions necessary to meet mission goals requires minute-by-minute scripting, defined weeks in advance of execution, for the life of the mission has remained. This archetype was appropriate for a "new frontier" but now risks overtly constraining the potential market-based opportunities for the innovation considered necessary to efficiently address the complexities associated with meeting communications and navigation requirements projected to be characteristics of the next era of space exploration: a growing number of missions in simultaneous execution, increased variance of mission types and growth in location/orbital regime diversity. The resulting ERNESt architectural cornerstone - the Space Mobile Network (SMN) - was envisioned as critical to creating an environment essential to meeting these future challenges in political, programmatic, technological and budgetary terms. The SMN incorporates technologies such as: Disruption Tolerant Networking (DTN) and optical communications, as well as new operations concepts such as User Initiated Services (UIS) to provide user services analogous to today's terrestrial mobile network user. Results developed in collaboration with NASA's Space Communications and Navigation (SCaN) Division and field centers are reported on. Findings have been validated via briefings to external focus groups and initial ground-based demonstrations. The SMN opens new niches for exploitation by the marketplace of mission planners and service providers.

Space Communication Spacecraft↗

The NASA/Army Autonomous Rotorcraft Project

An overview of the NASA Ames Research Center Autonomous Rotorcraft Project (ARP) is presented. The project brings together several technologies to address NASA and US Army autonomous vehicle needs, including a reactive planner for mission planning and execution, control system design incorporating a detailed understanding of the platform dynamics, and health monitoring and diagnostics. A candidate reconnaissance and surveillance mission is described. The autonomous agent architecture and its application to the candidate mission are presented. Details of the vehicle hardware and software development are provided.

Whalley, M.↗

ISECG Global Exploration Roadmap: A Stepwise Approach to Deep Space Exploration

In 2011, ISECG released the Global Exploration Roadmap (GER), advancing the "Global Exploration Strategy: The Framework for Coordination" by articulating the perspectives of participating agencies on exploration goals and objectives, mission scenarios, and coordination of exploration preparatory activities. The GER featured a stepwise development and demonstration of capabilities ultimately required for human exploration of Mars. In 2013 the GER was updated to reflect the ongoing evolution of agency's exploration policies and plans, informed by individual agency and coordinated analysis activities that are relevant to various elements of the GER framework as well as coordinated stakeholder engagement activities. For this release of version 2 of the GER in the mid 2013 timeframe, a modified mission scenario is presented, more firmly reflecting the importance of a stepwise evolution of critical capabilities provided by multiple partners necessary for executing increasingly complex missions to multiple destinations and leading to human exploration of Mars. This paper will describe the updated mission scenario, the changes since the release of version 1, the mission themes incorporated into the scenario, and risk reduction for Mars missions provided by exploration at various destinations.

Martinez, Roland↗

Status and Path Forward for the Large Ultraviolet Optical Infrared Surveyor (LUVOIR) Mission Concept Study

In preparation of the 2020 Astrophysics Decadal Survey, National Aeronautics and Space Administration (NASA) has commenced a process for the astronomical community to study several large mission concepts leveraging the lessons learned from past Decadal Surveys. This will enable the Decadal Survey committee to make more informed recommendations to NASA on its astrophysics science and mission priorities with respect to cost and risk. Four astrophysics large mission concepts were identified. Each of them had a Science and Technology Definition Teem(STDT) chartered to produce scientifically compelling, feasible, and executable design reference mission (DRM)concepts to present to the 2020 Decadal Survey. In addition, The Aerospace Corporation will perform an independent cost and technical evaluation (CATE) of each of these mission concept studies in advance of the 2020 Decadal Survey by interacting with the STDTs to provide detailed technical details on certain areas for which deep dives are appropriate. This paper presents the status and path forward for one of the four large mission concepts, namely, the Large UltraViolet, Optical, InfraRed surveyor (LUVOIR).

Study Office: science analyses↗

Obtaining and Using Planetary Spatial Data into the Future: The Role of the Mapping and Planetary Spatial Infrastructure Team (MAPSIT)

Planetary spatial data, which include any remote sensing data or derived products with sufficient positional information such that they can be projected onto a planetary body, continue to rapidly increase in volume and complexity. These data are the hard-earned fruits of decades of planetary exploration, and are the end result of mission planning and execution. Maintaining these data using accessible formats and standards for all scientists has been necessary for the success of past, present, and future planetary missions. The Mapping and Planetary Spatial Infrastructure Team (MAPSIT) is a group of planetary community members tasked by NASA Headquarters to work with the planetary science community to identify and prioritize their planetary spatial data needs to help determine the best pathways for new data acquisition, usable product derivation, and tools/capability development that supports NASA's planetary science missions.

Radebaugh, J.↗

Optimal attitude maneuver execution for the Advanced Composition Explorer (ACE) mission

The Advanced Composition Explorer (ACE) spacecraft will require frequent attitude reorientations in order to maintain the spacecraft high gain antenna (HGA) within 3 deg of earth-pointing. These attitude maneuvers will be accomplished by employing a series of ground-commanded thruster pulses, computed by ground operations personnel, to achieve the desired change in the spacecraft angular momentum vector. With each maneuver, attitude nutation will be excited. Large nutation angles are undesirable from a science standpoint. It is important that the thruster firings be phased properly in order to minimize the nutation angle at the end of the maneuver so that science collection time is maximized. The analysis presented derives a simple approximation for the nutation contribution resulting from a series of short thruster burns. Analytic equations are derived which give the induced nutation angle as a function of the number of small thruster burns used to execute the attitude maneuver and the phasing of the burns. The results show that by properly subdividing the attitude burns, the induced nutation can be kept low. The analytic equations are also verified through attitude dynamics simulation and simulation results are presented. Finally, techniques for quantifying the post-maneuver nutation are discussed.

Woodard, Mark A.↗

Payload operations management of a planned European SL-Mission employing establishments of ESA and national agencies

Spacelab (SL)-missions with Payload Operations (P/L OPS) from Europe involve numerous space agencies, various ground infrastructure systems and national user organizations. An effective management structure must bring together different entities, facilities and people, but at the same time keep interfaces, costs and schedule under strict control. This paper outlines the management concept for P/L OPS of a planned European SL-mission. The proposal draws on the relevant experience in Europe, which was acquired via the ESA/NASA mission SL-1, by the execution of two German SL-missions and by the involvement in, or the support of, several NASA-missions.

Joensson, Rolf↗

NASA Engineering and Safety Center Technical Bulletin No 12-01: Simulation Framework for Rapid Entry, Descent, and Landing Analysis

The NASA Engineering and Safety Center has archived a number of key historic Entry, Descent, and Landing (EDL) simulation models and developed several new models to enhance the capability of the Agency to evaluate a wide range of EDL systems for system analysis studies, preliminary design, mission development and execution, and time-critical assessments. The simulation models developed in this activity can be used to help define the required architectures and investment strategies for future robotic and human exploration missions.

Simulation Framework↗

Actions, Observations, and Decision-Making: Biologically Inspired Strategies for Autonomous Aerial Vehicles

This paper details the development and demonstration of an autonomous aerial vehicle embodying search and find mission planning and execution srrategies inspired by foraging behaviors found in biology. It begins by describing key characteristics required by an aeria! explorer to support science and planetary exploration goals, and illustrates these through a hypothetical mission profile. It next outlines a conceptual bio- inspired search and find autonomy architecture that implements observations, decisions, and actions through an "ecology" of producer, consumer, and decomposer agents. Moving from concepts to development activities, it then presents the results of mission representative UAV aerial surveys at a Mars analog site. It next describes hardware and software enhancements made to a commercial small fixed-wing UAV system, which inc!nde a ncw dpvelopnent architecture that also provides hardware in the loop simulation capability. After presenting the results of simulated and actual flights of bioinspired flight algorithms, it concludes with a discussion of future development to include an expansion of system capabilities and field science support.

Pisanich, Greg↗

Mission Assurance Modeling and Simulation: A Cyber Security Roadmap

This paper proposes a cyber security modeling and simulation roadmap to enhance mission assurance governance and establish risk reduction processes within constrained budgets. The term mission assurance stems from risk management work by Carnegie Mellon's Software Engineering Institute in the late 19905. By 2010, the Defense Information Systems Agency revised its cyber strategy and established the Program Executive Officer-Mission Assurance. This highlights a shift from simply protecting data to balancing risk and begins a necessary dialogue to establish a cyber security roadmap. The Military Operations Research Society has recommended a cyber community of practice, recognizing there are too few professionals having both cyber and analytic experience. The authors characterize the limited body of knowledge in this symbiotic relationship. This paper identifies operational and research requirements for mission assurance M&S supporting defense and homeland security. M&S techniques are needed for enterprise oversight of cyber investments, test and evaluation, policy, training, and analysis.

Gendron, Gerald↗

Unlocking the Mysteries of the Moon’s Shadowed Regions

The Moon poles host large quantities of water-ice deposits in the permanently shadowed regions (PSRs), which are vital for enabling sustainable human space exploration, making these regions high-priority targets for upcoming Artemis missions [1]. Unfortunately, today, the best available orbital lunar imagery [2, 3] lacks the meter-scale resolution and signal needed to understand the geomorphology and trafficability of PSRs, complicating the planning and execution of future missions seeking to explore PSRs. We have developed an image enhancement tool called HORUS (Hyper-effective nOise Removal Unet Software) [4, 5], designed to enhance LRO Narrow-Angle Camera (NAC) optical low-light imagery of permanently shadowed regions by effectively removing the CCD-related, photon, and other residual noises that corrupt the images. The tool is composed of two deep learning neural networks trained on environmental metadata and real and synthetic imagery, the latter generated by a physical noise model (LROC). We demonstrated that HORUS effectively produces low-noise, high-resolution images (~1.5m/px), achieving a 5 to 10x improvement over existing long-exposure images of PSRs. HORUS allows scientists and engineers to identify geomorphic features (e.g., craters and boulders) in shadowed regions as small as 3 meters across as well as to peek inside of small shadowed regions, for the first time. The tool was deployed and thoroughly validated for NASA's VIPER mission [6], where it was applied to 20 candidate target regions across the lunar South Pole. Additionally, we conducted different approaches to validate the resulting HORUS-processed images. With HORUS denoised images, VIPER scientists can increase their confidence on what surface features (previously unseen) exist in the shadowed regions, helping them plan rover traverses more safely and efficiently (e.g., Fig. 1) In this manuscript, we will describe how VIPER scientists are utilizing HORUS denoised images to extract new information from the terrain and increase their confidence in what surface features exist in the shadowed regions. In combination with other high-resolution images and digital elevation maps, HORUS images are helping the team analyze potential lading and science sites, as well as planning traverses more safely and efficiently (e.g., Fig. 1). Additionally, we will describe how HORUS tool unlocks a broad range of scientific and exploration applications to other Artemis and CPLS missions to the lunar poles, including (but not limited to) geomorphic analysis, change detection, surface hazard detection, and terrain relative navigation.

artificial intelligence↗

Mars Sample Return: Grand Challenge for EDL

A year ago, I gave a talk in anticipation of a Mars Sample Return effort at the 9th Ablation Workshop. Since then a lot has happened. "April of this year, after a year of study phase, NASA and ESA (European Space Agency) signed a Statement of Intent (SOI) to jointly develop a Mars Sample Return plan to be submitted to their respective authorities by the end of 2019. This signing is historic, as it signals the desire, the readiness, and the willingness to work together to execute this inspiring mission, we all have the opportunity to tackle this grand challenge. We have the scientific and engineering maturity to identify the critical technologies ready to be applied, and with discipline this campaign can be executed affordably," Jim Watzin, Mars Program Executive, NASA. NASA Centers with JPL (Jet Propulsion Laboratory) leading the charge is in the midst of a pre-formulation phase for executing a Mars Sample Return before the end of next decade. The proposed talk builds on the previous year talk. In light of the agreement between NASA and ESA, NASA has assumed the responsibilities for developing the earth entry vehicle (EEV) that will fly along with a European Spacecraft and return with the sample from Mars. EEV will be deployed for entry into earth. The EEV design, development, testing and certification have to result in a highly reliable sample return system. The entire architecture has to be demonstrated to meet the planetary protection requirement. NASA is considering two distinctly different earth entry vehicle architectures and with each choice, many different ablative TPS (Thermal Protective Shield) candidates. As a result of the NASA-ESA ongoing studies, some of the key entry conditions and design requirements are better understood today and more are being scoped out. The heat-shield ablative TPS choice need to be done with a good understanding as it plays a very significant role in determining the robustness of the EEV. Knowledge about how materials and system perform, and how the features could become flaws and how flaws lead to failure, etc. need to be clearly understood and the knowledge then need to be used to down select the TPS. This proposed talk will provide greater insight into the progress being made and the challenges that need to be tackled.

Mars Sample Return: Grand Challenge for EDL↗

The Hubble Space Telescope servicing missions: Past, present, and future operational challenges

The Hubble Space Telescope (HST) is a complex spacecraft designed to conduct leading edge scientific observations over a planned fifteen year mission lifetime. It was designed for servicing by the Space Shuttle to upgrade systems, replace failed components, and boost into a higher orbit. There are many operational challenges that must be addressed in preparing for and executing a Servicing Mission (SM) which range from both technical to managerial issues. This paper will be exploring the operational challenges faced by the HST Operations and Ground System Project in supporting the First Servicing Mission (FSM) and future Servicing Missions. We give special emphasis to those areas that helped ensure mission success. These areas include training, testing, and contingency planning.

William R Ochs↗

Twenty Years of Systems Engineering on the Cassini-Huygens Mission

Over the past twenty years, the Cassini-Huygens Mission has successfully utilized systems engineering to develop and execute a challenging prime mission and two mission extensions. Systems engineering was not only essential in designing the mission, but as knowledge of the system was gained during cruise and science operations, it was critical in evolving operational strategies and processes. This paper discusses systems engineering successes, challenges, and lessons learned on the Cassini-Huygens Mission gathered from a thorough study of mission plans and developed scenarios, and interviews with key project leaders across its twenty-year history.

Manor-Chapman, Emily↗

In-Space Assembly Capability Assessment for Potential Human Exploration and Science Applications

Human missions to Mars present several major challenges that must be overcome, including delivering multiple large mass and volume elements, keeping the crew safe and productive, meeting cost constraints, and ensuring a sustainable campaign. Traditional methods for executing human Mars missions minimize or eliminate in-space assembly, which provides a narrow range of options for addressing these challenges and limits the types of missions that can be performed. This paper discusses recent work to evaluate how the inclusion of in-space assembly in space mission architectural concepts could provide novel solutions to address these challenges by increasing operational flexibility, robustness, risk reduction, crew health and safety, and sustainability. A hierarchical framework is presented to characterize assembly strategies, assembly tasks, and the required capabilities to assemble mission systems in space. The framework is used to identify general mission system design considerations and assembly system characteristics by assembly strategy. These general approaches are then applied to identify potential in-space assembly applications to address each challenge. Through this process, several focus areas were identified where applications of in-space assembly could affect multiple challenges. Each focus area was developed to identify functions, potential assembly solutions and operations, key architectural trades, and potential considerations and implications of implementation. This paper helps to identify key areas to investigate were potentially significant gains in addressing the challenges with human missions to Mars may be realized, and creates a foundation on which to further develop and analyze in-space assembly concepts and assembly-based architectures.

Jefferies, Sharon A.↗

Impacts of In-Space Assembly as Applied to Human Exploration Architectures

Human missions to Mars present several major challenges that must be overcome, including delivering multiple large mass and volume elements, keeping the crew safe and productive, meeting cost constraints, and ensuring a sustainable campaign. Traditional methods for executing human Mars missions minimize or eliminate in-space assembly (iSA), which provides a narrow range of options for addressing these challenges and limits the types of missions that can be performed. This paper discusses recent work to evaluate how the inclusion of in-space assembly in space mission architectural concepts could provide novel solutions to address these challenges by increasing operational flexibility, robustness, risk reduction, crew health and safety, and sustainability. Several assembly focus areas identified through previous work were developed and evaluated to identify high-potential iSA applications that can have meaningful impacts on the challenges facing Mars missions. Architecture trade options were developed and assessed through sensitivity analyses, resulting in identification of six iSA-based architecture solutions that could be incorporated into Mars mission architectures with moderate levels of assembly. Assembly agent and infrastructure concepts were also developed that would be necessary to enable or facilitate the iSA operations. Several observations developed through the study are presented to inform future human mission architecture and campaign developments.

Jefferies, Sharon A.↗

Spitzer Mission Operation System Planning for IRAC Warm-Instrument Characterization

This paper will describe how the Spitzer Mission Operations System planned and executed the characterization phase between Spitzer's cryogenic mission and its warm mission. To the largest extend possible, the execution of this phase was done with existing processing and procedures. The modifications that were made were in response to the differences of the characterization phase compared to normal phases before and after. The primary two categories of difference are: unknown date of execution due to uncertainty of knowledge of the date of helium depletion, and the short cycle time for data analysis and re-planning during execution. In addition, all of the planning and design had to be done in parallel with normal operations, and we had to transition smoothly back to normal operations following the transition. This paper will also describe the re-planning we had to do following an anomaly discovered in the first days after helium depletion.

IWIC↗