Search NASA⌕ Search

SEARCH · Search NASA

Results for “rovers mission operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Study of application of adaptive systems to the exploration of the solar system. Volume 3: Mars landed systems

The results of a more detailed study of three missions to the surface of Mars: (1) an advanced lander, (2) a lander with a small tethered rover, and (3) a lander with a medium sized rover that operates independently of the lander for most of its functions but communicates with Earth through the lander are presented. For all three missions it was assumed that the Viking orbiter and lander would be used with modifications as required to improve the science package, to accommodate the rovers, and to handle the increased payloads.

Source record↗

Improved target handoff for single cycle instrument placement

Single Cycle Instrument Placement(SCIP)could dramatically increase the speed of various planetary rover operations. JPL is validating SCIP for use on its upcoming Mars Science Laboratory mission. Two major sources of error in the implementation submitted for validation were imprecision in selecting a distant target and error introduced while handing the target off to the rover's hazard cameras (hazcams). We have added the capability to designate a target using high resolution cameras (pancams) and then hand off to medium resolution cameras (navcams) with little error later in the traverse. We implemented several options for handoff from navcams to hazcams. We evaluated their performance on several test cases. Two methods produced average handoff error of 1 pixel when successful, but these only worked in half of the tests. Two other methods reliably produced about 10 pixels of error. None reliably reach the goal of 1 pixel handoff accuracy.

handoff↗

SEI power source alternatives for rovers and other multi-kWe distributed surface applications

Results of the study performed to support the Space Exploration Initiative (SEI) which investigated power system alternatives for the rover vehicles and servicers that would be used for construction and operation of a lunar base is described. Using the mission requirements and power profiles that were subsequently generated for each of these rovers and servicers, candidate power sources incorporating various power generation and energy storage technologies were identified. The technologies were those believed most appropriate to the SEI missions, and included solar, electrochemical, and isotope systems. The candidates were characterized with respect to system mass, deployed area and volume. For each of the missions a preliminary selection was made. Results of this study depict the available power sources in light of the mission requirements as they are currently defined.

Bents, D. J.↗

Mineralogy of SNC Meteorite EET79001 by Simultaneous Fitting of Moessbauer Backscatter Spectra

We have acquired M ssbauer spectra for SNC meteorite EET79001 with a MIMOS II backscatter M ssbauer spectrometer [1] similar to those now operating on Mars as part of the Mars Exploration Rover (MER) missions. We are working to compare the Fe mineralogical composition of martian meteorites with in-situ measurements on Mars. Our samples were hand picked from the >1 mm size fraction of saw fines on the basis of lithology, color, and grain size (Table 1). The chips were individually analyzed at approx.300K by placing them on a piece of plastic that was in turn supported by the contact ring of the instrument (oriented vertically). Tungsten foil was used to mask certain areas from analysis. As shown in Figure 1, a variety of spectra was obtained, each resulting from different relative contributions of the Fe-bearing minerals present in the sample. Because the nine samples are reasonably mixtures of the same Fe-bearing phases in variable proportions, the nine spectra were fit simultaneously (simfit) with a common model, adjusting parameters to a single minimum chi-squared convergence criterion [2]. The starting point for the fitting model and values of hyperfine parameters was the work of Solberg and Burns [3], who identified olivine, pyroxene, and ferrous glass as major, and ilmenite and a ferric phase as minor (<5%), Fe-bearing phases in EET79001.

Morris, Richard V.↗

Human Mars Surface Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B. Chappell↗

Human Mars Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B Chappell↗

Automatic Command Sequence Generation

Automatic Sequence Generator (Autogen) Version 3.0 software automatically generates command sequences for the Mars Reconnaissance Orbiter (MRO) and several other JPL spacecraft operated by the multi-mission support team. Autogen uses standard JPL sequencing tools like APGEN, ASP, SEQGEN, and the DOM database to automate the generation of uplink command products, Spacecraft Command Message Format (SCMF) files, and the corresponding ground command products, DSN Keywords Files (DKF). Autogen supports all the major multi-mission mission phases including the cruise, aerobraking, mapping/science, and relay mission phases. Autogen is a Perl script, which functions within the mission operations UNIX environment. It consists of two parts: a set of model files and the autogen Perl script. Autogen encodes the behaviors of the system into a model and encodes algorithms for context sensitive customizations of the modeled behaviors. The model includes knowledge of different mission phases and how the resultant command products must differ for these phases. The executable software portion of Autogen, automates the setup and use of APGEN for constructing a spacecraft activity sequence file (SASF). The setup includes file retrieval through the DOM (Distributed Object Manager), an object database used to store project files. This step retrieves all the needed input files for generating the command products. Depending on the mission phase, Autogen also uses the ASP (Automated Sequence Processor) and SEQGEN to generate the command product sent to the spacecraft. Autogen also provides the means for customizing sequences through the use of configuration files. By automating the majority of the sequencing generation process, Autogen eliminates many sequence generation errors commonly introduced by manually constructing spacecraft command sequences. Through the layering of commands into the sequence by a series of scheduling algorithms, users are able to rapidly and reliably construct the desired uplink command products. With the aid of Autogen, sequences may be produced in a matter of hours instead of weeks, with a significant reduction in the number of people on the sequence team. As a result, the uplink product generation process is significantly streamlined and mission risk is significantly reduced. Autogen is used for operations of MRO, Mars Global Surveyor (MGS), Mars Exploration Rover (MER), Mars Odyssey, and will be used for operations of Phoenix. Autogen Version 3.0 is the operational version of Autogen including the MRO adaptation for the cruise mission phase, and was also used for development of the aerobraking and mapping mission phases for MRO.

Fisher, Forest↗

Vehicle development of Lunar/Mars exploration

The author of this paper presents a historical discussion of robotic vehicle development of lunar and Martian exploration. The discussion begins by comparing and contrasting the transportation, environmental, and operational requirements of the two planets. This is followed by a historical summary of what has been done to date, including some recently released information on the Soviet rovers sent to Mars and Phobos in the early 1970s. Finally, current proposed missions, vehicles, operational requirements, and development status are discussed.

Purvis, James W.↗

Lithium-ion cell technology demonstration for future NASA applications

NASA requires lightweight rechargeable batteries for future missions to Mars and the outer planets that are capable of operating over a wide range of temperatures, with high specific energy and energy densities. Due to their attractive performance characteristics, lithium-ion batteries have been identified as the battery chemistry of choice for a number of future applications, including planetary orbiters, rovers and landers. For example, under the Mars Surveyor Program MSP 01 lithium-ion batteries were developed by Lithion (each being 28 V, 25 Ah, 8-cells. and 9 kg) and fully qualified prior to mission cancellation. In addition to the requirement of being able to supply at least 90 cycles on the surface of Mars, the battery demonstrated operational capability (both charge and discharge) over a large temperature range (-2O'C to +4OoC), with tolerance to non-operational excursions to -30nd 50Currently, JPL is implementing lithium-ion technology on the 2003 Mars Exploration Rover (MER), which will be coupled with a solar array. This mission has similar performance requirements to that of the 2001 Lander in that high energy density and a wide operating temperature range are necessitated. In addition to planetary rover and lander applications, we are also engaged in determining the viability of using lithium-ion technology for orbiter applications that require exceptionally long life (>20,000 cydes at partial depth of discharge). To assess the viabili of lithium-ion cells for these applications, a number of performance characterization tests have been performed (at the cell and battery level) on state-of-art prototype lihium- ion cells, induding: assessing the cycle life performance (at varying DODs), life characteristics at extreme temperatures (< -10nd >+4OoC), rate capability as a function of temperature (-30' to 4OoC), pulse capability, self-discharge and storage characteristics, as well as, mission profile capability. This paper will describe the current and future NASA missions that are considering lithium ion batteries and will contain results of the cell testing conducted to-date to validate the technology for these missions.

lithium-ion batteries Mars landers Mars rovers↗

Calculation of Operations Efficiency Factors for Mars Surface Missions

The duration of a mission--and subsequently, the minimum spacecraft lifetime--is a key component in designing the capabilities of a spacecraft during mission formulation. However, determining the duration is not simply a function of how long it will take the spacecraft to execute the activities needed to achieve mission objectives. Instead, the effects of the interaction between the spacecraft and ground operators must also be taken into account. This paper describes a method, using "operations efficiency factors", to account for these effects for Mars surface missions. Typically, this level of analysis has not been performed until much later in the mission development cycle, and has not been able to influence mission or spacecraft design. Further, the notion of moving to sustainable operations during Prime Mission--and the effect that change would have on operations productivity and mission objective choices--has not been encountered until the most recent rover missions (MSL, the (now-cancelled) joint NASA-ESA 2018 Mars rover, and the proposed rover for Mars 2020). Since MSL had a single control center and sun-synchronous relay assets (like MER), estimates of productivity derived from MER prime and extended missions were used. However, Mars 2018's anticipated complexity (there would have been control centers in California and Italy, and a non-sun-synchronous relay asset) required the development of an explicit model of operations efficiency that could handle these complexities. In the case of the proposed Mars 2018 mission, the model was employed to assess the mission return of competing operations concepts, and as an input to component lifetime requirements. In this paper we provide examples of how to calculate the operations efficiency factor for a given operational configuration, and how to apply the factors to surface mission scenarios. This model can be applied to future missions to enable early effective trades between operations design, science mission planning, and spacecraft design.

Laubach, Sharon↗

South Pole Lunar Lighting Studies for Driving Exploration on the Lunar Surface

NASA’s Artemis lunar missions will face new exploration challenges due to inherently low sun angles in the lunar south pole region. Whereas the Apollo missions were afforded sunlight for approximately 8 to 50-degrees above the horizon, sunlight for the next lunar missions will only be 1 to 2-degrees about the horizon. With this low angle, long shadows and high contrasts of light and dark areas will be faced by the crew and remote teleop operators while exploring the lunar surface. With this in mind, NASA developed an integrated virtual Lighting and Navigation Simulation to understand these challenges. Two studies have been conducted in this Lunar South Pole environment to evaluate the effects of natural and artificial lighting on driving and navigating a lunar rover across the surface. Early NASA studies, such as this, are used to aid in developing techniques and explore concepts of operations to promote mission success and crew safety. In the Phase One development evaluation, six astronauts were teleported to ten different lighting conditions. For each location, drivers were to drive to an imaginary target approximately 200-meters straight ahead and provide subjective feedback on their ability to drive under the given lighting conditions. Phase Two, a more operational study, four astronauts and a remote operator tested five different Artemis lunar mission scenarios. Results indicated sun direction at such low angles, especially when driving a high speed, can severely impact the crew’s ability to safely drive the rover. In the up-sun situation, with the sun directly in the driver’s eyes and compounded long shadows, the consistent preference among drivers was to initiate a tacking strategy of approximately +/- 20 to 30-degrees to improve visibility. This maneuver does require more time and rover energetics. Conversely, driving down-sun required the crew to tack as well to avoid the shadow of rover blocking the terrain. Less appreciated is how the surrounding landscape is lit. Traveling into shadowed areas, especially while facing a lit terrain beyond the shadowed area, drivers enter at their own risk due to pupil contraction making artificial lights useless. Additionally, the constant transitioning between dark and light areas are mentally taxing to the crew and natural navigational references such as the stars are invisible and therefore unusable. Slope and depth magnitude are very difficult hazards to judge when approaching a shadowed crater. This naturally leads to slower driving speeds than originally anticipated. As for observing scientifically interesting features, assessing them accurately varies greatly by the lighting condition. In most cases, the task can be completed, but the strategy is to use the sun to one’s advantage. Crew workload distribution in the cockpit for driving operations was split amongst crew. The driver primarily focused attention on visual terrain (80%) but referenced displays approximately 20% of the time, while the co-pilot/navigator generally provided directional cues to the driver. These natural lighting conditions present significant challenges for safe rover operations; however, early studies having given investigators a “first-look” into understanding of how operating on the South Lunar Pole can be accomplished.

LTv↗

Anomaly Recovery and the Mars Exploration Rovers

The premise of the design of operations for the Mars Exploration Rovers (MER) is that the vehicles will drive each day. As a result, they will encounter some aspect of the terrain environment that cannot be anticipated or otherwise accommodated by the sequences linked onboard that day. The operations team then must correct the problem by planning then commanding the execution of a different drive the next day. Often other aspects of the operation on the surface of Mars: environmental changes, component degradation, errors in sequence design or execution, etc., lead to anomalies which must be addressed before normal operations can resume. The operational design that makes it possible to recover from a driving error each day also reduces the time needed to recover from anomalies. As an example of the efficiency achieved, less than 5% (about 30 sols out of 700 sols of operations) of the time on the surface has been devoted to recovery from anomalies for each vehicle. In this paper the major anomalies experienced by the MER rovers will be recounted and the streamlined approaches to addressing these problems described. The operational flexibility developed for these missions is also a function of the system design that anticipated a number of likely faults and conditions arising from uncertainty in sequence execution and environmental change. This design will be described as well as the considerations in operation that motivated this design. These considerations will likely be present in any future surface mission.

rovers↗

Multi-Agent Modeling and Simulation Approach for Design and Analysis of MER Mission Operations

A space mission operations system is a complex network of human organizations, information and deep-space network systems and spacecraft hardware. As in other organizations, one of the problems in mission operations is managing the relationship of the mission information systems related to how people actually work (practices). Brahms, a multi-agent modeling and simulation tool, was used to model and simulate NASA's Mars Exploration Rover (MER) mission work practice. The objective was to investigate the value of work practice modeling for mission operations design. From spring 2002 until winter 2003, a Brahms modeler participated in mission systems design sessions and operations testing for the MER mission held at Jet Propulsion Laboratory (JPL). He observed how designers interacted with the Brahms tool. This paper discussed mission system designers' reactions to the simulation output during model validation and the presentation of generated work procedures. This project spurred JPL's interest in the Brahms model, but it was never included as part of the formal mission design process. We discuss why this occurred. Subsequently, we used the MER model to develop a future mission operations concept. Team members were reluctant to use the MER model, even though it appeared to be highly relevant to their effort. We describe some of the tool issues we encountered.

Seah, Chin↗