Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Disk Mechanical Test Development

The target disks are held in a circular slot in a stainless steel holder. The holder is sized and toleranced so that the disks fit without constraint in the holder at the temperature of the parts under the irradiation condition. The target is a stack of 29 mm diameter disks 0.5 mm thick separated by 0.25 mm coolant gaps. The hottest disks reach a temperature of 1263 K at the center. Figure 1 shows the temperature contour plot of the hottest disk, Disk 14. Temperature increase causes thermal expansion through the thickness and radially. The radial thermal expansion in particular causes thermal stresses, aggravated by the fact that the center heats significantly more than the edge. Thus the center of the disk expands radially but the relatively cool outer edge constrains that motion. The resulting thermal stress is shown in Figure 2, showing a peak thermal stress of 281 MPa at the center. Stress/strain curves for molybdenum are shown in the plot in Figure 3. From the curve at 982°C, it is evident that plastic deformation will result, with a maximum deformation of 0.002 in (0.05 mm). Actual deformation is shown in Figures 4 and 5 in one radial plane and in the "Z" direction through the thickness.

36 MATERIALS SCIENCE↗

99 Mo Production Plant Layout

The NorthStar Medical Technologies 99 Mo production facility configuration is envisioned to be 8 accelerator pairs irradiating 7 100 Mo targets (one spare accelerator pair undergoing maintenance while the other 7 pairs are irradiating targets). The required shielding in every direction for the accelerators is initially estimated to be 10 feet of concrete. With the accelerator pairs on one (ground) level and spaced with the required shielding between adjacent pairs, the only practical path for target insertion and removal while minimizing floor space is vertical. The current scheme then requires a target vertical lift of nominally 10 feet through a shield stack. It is envisioned that the lift will be directly into a hot cell where an activated target can be removed from its holder and a new target attached and lowered. The hot cell is on a rail system so that a single hot cell can service all active target locations, as well as deliver the ready targets to the separations lab. On this rail system, coupled to the hot cell, will be a helium recovery and clean-up system. All helium coolant equipment is located on the upper level near to the target removal point.

42 ENGINEERING↗

Production Facility Prototype Blower Installation Report

The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was need for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/ppressure vessel package and the status of the facility preparations.

42 ENGINEERING↗

Production Target Design Report

The Northstar 99 Mo production target, a cylindrical length of 100 Mo rod, has evolved considerably since its first conception. The cylinder was very early sliced into disks to increase the heat transfer area, first to 1 mm thick disks then to the current 0.5 mm thick. The coolant was changed early in the target development from water to helium to eliminate corrosion and dissolution. The diameter has increased from initially 6 mm to 12 mm, the current diameter of the test target now at ANL, to nominally 28 mm (26-30.6 mm, depending upon optimal beam spot size and shape). The length has also changed to improve the production to cost ratio, so now the target is nominally 41 mm long (excluding coolant gaps between disks), and irradiated on both ends. This report summarizes the current status of the plant target design.

Accelerator Design, Technology, and Operations↗

Production Facility SCADA Design Report

The following report covers FY 14 activities to develop supervisory control and data acquisition (SCADA) system for the Northstar Moly99 production facility. The goal of this effort is to provide Northstar with a baseline system design.

42 ENGINEERING↗

A Four Channel Beam Current Monitor Data Acquisition System Using Embedded Processors

Data acquisition from multiple beam current monitors is required for electron accelerator production of Mo-99. A two channel system capable of recording data from two beam current monitors has been developed, is currently in use, and is discussed below. The development of a cost-effective method of extending this system to more than two channels and integrating of these measurements into an accelerator control system is the main focus of this report. Data from these current monitors is digitized, processed, and stored by a digital data acquisition system. Limitations and drawbacks with the currently deployed digital data acquisition system have been identified as have been potential solutions, or at least improvements, to these problems. This report will discuss and document the efforts we've made in improving the flexibility and lowering the cost of the data acquisition system while maintaining the minimum requirements.

42 ENGINEERING↗

Facility target insert shielding assessment

Main objective of this report is to assess the basic shielding requirements for the vertical target insert and retrieval port. We used the baseline design for the vertical target insert in our calculations. The insert sits in the 12”-diameter cylindrical shaft extending from the service alley in the top floor of the facility all the way down to the target location. The target retrieval mechanism is a long rod with the target assembly attached and running the entire length of the vertical shaft. The insert also houses the helium cooling supply and return lines each with 2” diameter. In the present study we focused on calculating the neutron and photon dose rate fields on top of the target insert/retrieval mechanism in the service alley. Additionally, we studied a few prototypical configurations of the shielding layers in the vertical insert as well as on the top.

Accelerator Design, Technology, and Operations↗

Multiple Flow Loop SCADA System Implemented on the Production Prototype Loop

The following report covers FY 15 activities to develop supervisory control and data acquisition (SCADA) system for the Northstar Moly99 production prototype gas flow loop. The goal of this effort is to expand the existing system to include a second flow loop with a larger production-sized blower. Besides testing the larger blower, this system will demonstrate the scalability of our solution to multiple flow loops.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Emission Spectroscopy of the 4X Source Discharge With and Without N 2 Gas

This tech note summarizes the December, 1988 emission spectroscopy measurements made on the 4X source discharge with and without N₂ gas added to the H + Cs discharge. This study is motivated by the desire to understand why small amounts of N₂ gas added to the source discharge results in a reduction in the H⁻ beam noise. The beneficial effect of N₂ gas on H⁻ beam noise was first discovered by Bill Ingalls and Stu Orbesen on the ATS SAS source. For the 4X source the observed effect is that when N2 gas is added to the discharge the H⁻ beam noise is reduced about a factor of 2.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Target Window Reliability

The target window design implemented and tested in experiments at ANL have performed without failure for the available beam of 6 mm FWHM on a 12 mm diameter target. However, scaling that design to a 25 mm diameter target size for a 12 mm FWHM beam has proven problematic. Combined thermal and mechanical (pressure induced) stresses and strains are too high to maintain the small coolant gaps and provide adequate fatigue lifetime.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mo100 to Mo99 Target Cooling Enhancements Report

Target design requirements changed significantly over the past year to a much higher beam current on larger diameter disks, and with a beam impingement on both ends of the target. Scaling from the previous design, that required significantly more mass flow rate of helium coolant, and also thinner disks. A new Aerzen GM12.4 blower was selected that can deliver up to 400 g/s at 400 psi, compared to about 100 g/s possible with the Tuthill blower previously selected.Further, to accommodate the 42 MeV, 2.7 mA beam on each side of the target, the disk thickness and the coolant gaps were halved to create the current baseline design: 0.5 mm disk thickness (at 29 mm diameter) and 0.25 mm coolant gap. Thermal-hydraulic analysis of this target, presented below for reference, gave very good results, suggesting that the target could be improved with fewer, thicker disks and with disk thickness increasing toward the target center. The total thickness of Mo100 in the target remaining the same, that reduces the number of coolant gaps. This allows for the gap width to be increased, increasing the mass flow in each gap and consequently increasing heat transfer. A preliminary geometry was selected and analyzed with variable disk thickness and wider coolant gaps. The result of analysis of this target shows that disk thickness increase near the window was too aggressive and further resizing of the disks is necessary, but it does illustrate the potential improvements that are possible. Experimental and analytical study of diffusers on the target exit has been done. This shows modest improvement in requcing pressure drop, as will be summarized below. However, the benefit is not significant, and implementation becomes problematic when disk thickness is varying. A bull nose at the entrance does offer significant benefit and is relatively easy to incorporate. A bull nose on both ends is now a feature of the baseline design, and will be a feature of any redesign or enhanced designs that follow.

43 PARTICLE ACCELERATORS↗