Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEAM MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Progress on an Electron Beam Profile Monitor at the Fermilab Main Injector

The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam intensities in the Main Injector (MI) that will exceed 2 MW. Measuring the transverse profiles of these high intensity beams in a ring requires non-invasive techniques. The MI uses ionization profile monitors as its only profile system. An alternative technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. This type of device was installed in MI and initial studies of it have been previously presented. This paper will present the status and recent studies of the device utilizing different techniques.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Electromagnetic design of the RF cavity beam position monitor for the LCLS.

A high-resolution X-band cavity BPM has been developed for the LCLS. A dipole mode cavity and a monopole mode reference cavity have been designed in order to achieve micron-level accuracy of the beam position. The rf properties of the BPM as well as beam interaction with the cavities will be discussed including output power and tuning. In addition, methods will be presented for improving the isolation of the output ports to differentiate between horizontal/vertical beam motion and to reject extraneous modes from affecting the output signal. The predicted simulation results will be compared to data collected from low-power experimental tests.

43 PARTICLE ACCELERATORS↗

Space-charge effects in ionization beam profile monitors

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. At high beam intensities, the space-charge forces make the measured IPM profiles significantly different from those of the beams. We analyze dynamics of the secondaries in IPMs and develop an effective algorithm to reconstruct the beam sizes from the measured IPM profiles. Efficiency of the developed theory is illustrated in application to the Fermilab 8 GeV proton Booster IPMs.

43 PARTICLE ACCELERATORS↗

Space-Charge Effects in Ionization Beam Profile Monitors

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. At high beam intensities, the space-charge forces make the measured IPM profiles significantly different from those of the beams. We analyze dynamics of the secondaries in IPMs and develop an effective algorithm to reconstruct the beam sizes from the measured IPM profiles. Efficiency of the developed theory is illustrated in application to the Fermilab 8 GeV proton Booster IPMs.

Shiltsev, Vladimir D.↗

Laser wire beam profile monitor in the Spallation Neutron Source (SNS) superconducting linac

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory is an accelerator based neutron scattering facility. The SNS uses the large scale high energy superconducting linac (SCL) to provide high beam power utilizing hydrogen ion (H-) beams. For the diagnostics of high-brightness H- beam in the SCL, nonintrusive methods have to be developed. This paper describes design, implementation, theoretical analysis and experimental demonstration of a nonintrusive profile monitor system based on photodetachment, also known as laser wire, installed in the SNS-SCL. The SNS laser wire system is the largest of its kind with a capability of measuring both horizontal and vertical profiles of an operational H- beam at each of the 23 cryomodule stations along the SCL beam line by employing a single light source. Presently 9 laser wire stations have been commissioned which measures H- beam profiles at 9 different locations corresponding to energy levels of 200 MeV to 1 GeV. The laser wire diagnostics has no moving parts inside the beam pipe, causes no contamination on the superconducting surface, and can be run parasitically on an operational neutron production H- beam.

43 PARTICLE ACCELERATORS↗

Beam Loss Monitoring with Fixed and Translating Scintillation Detectors Along the Fermilab Drift-tube Linac

The Fermilab Linac is a roughly 145 meter linear accelerator that accelerates H- beam from 750 keV to 400 MeV and provides beam for the Booster and the rest of the accelerator chain. The first section of the Linac is a Drift-Tube Linac (DTL), which in its current state, suffers from a lack of instrumentation along its length. As a result, operational staff do not have access to the diagnostic information needed to tune the critical components of this accelerator, such as the quadrupole magnets within the drift tubes. This work presents an effort to utilize both fixed and translating scintillation detectors to investigate beam loss along the first two cavities of the DTL.

43 PARTICLE ACCELERATORS↗

Development of a high-brightness and low-divergence lithium neutral beam for a Zeeman polarimetry on JT-60U

A high-brightness and low-divergence neutral beam is obtained for a Zeeman polarimetry of edge plasmas on JT-60U. The electron density and the pitch angle of the magnetic field line, thus the plasma current density distribution, can be measured by the Zeeman polarimetry using the lithium beam. A thermionic ion source heated by an electron beam is developed in order to obtain the ion beam current extraction over 10 mA. The beam optics is designed after detailed numerical simulation taking the space charge effects into account because a low-divergence angle of the neutral lithium beam leads to a narrow spectrum of the beam emission. It is also necessary to keep the beam radius small for good spatial resolution due to a long beam line of 6.5 m. The newly developed ion gun is operated on a test stand which simulates the diagnostic arrangement on JT-60U. The ion beam current of 10 mA at a beam energy of 10 keV is successfully extracted from the ion source operated at the temperature over 1300 deg. C and focused by Einzel lens. The full width at half maximum radius of the ion beam at the neutralizer is about 9 mm. A sodium vapor neutralizer neutralizes the collimated ion beam fully at the temperature of 300 deg. C. The neutral beam profiles are measured at two locations of the beam line at Z=2.3 m (beam monitor position) and Z=6.5 m (plasma region). The half-width at half maximum radius of the neutral beam of 26 mm and the equivalent beam current of 3 mA with the beam divergence angle of 0.2 deg. which is the half-angle divergence are obtained. Those parameters satisfy the requirements of the Zeeman polarimetry. Furthermore, a long pulse extraction with a current of 10 mA and duration of 50 s is attained.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DARHT-II Beam Position Monitor B-Dot Owner’s Manual

Azimuthal arrays of magnetic and electric field detectors are used to measure the position of the centroid of the DARHT relativistic electron beams. These arrays consist of four detectors with 90-degree azimuthal separation. Differencing the opposing detectors and normalizing to the sum of all four gives the position of the beam, subject to negligibly small errors as discussed in Attachment A. This measurement yields the centroid of the current density, independent of the beam azimuthal asymmetry.

42 ENGINEERING↗

ATF2 Summary and Status

The Accelerator Test Facility (ATF) [1] at KEK was originally constructed as a Damping Ring (DR) demonstration facility for the next generation of electron linear colliders. It consists of a 1.3 GeV s-band linac and a 136m circumference damping ring which can routinely generate 1.6 nC electron bunches with very small vertical emittances (<10pm.rad). Completed in December of 2008, a new extraction line and final focus optics was built, this is referred to as ATF2 [2]. The location of ATF in-relation to the KEK site can be seen in Figure 1. ATF is a general-purpose facility for accelerator physics related R and D activities, with approximately 50% of the available beam time currently devoted to the ATF2 program. The ATF2 extraction line (EXT) and final focus system (FFS) extends about 90 meters from the DR extraction point, a sketch of this system can be seen in figure 2, along with the location of key instrumentation. The primary purpose of the ATF2 beam line is to demonstrate a new style of magnetic focusing optics intended for use at future linear colliders, such as ILC or CLIC based on a local chromaticity correction scheme. The primary goal of the collaboration is to demonstrate the ability of this optics to focus an electron beam of similar emittance to the ILC using a FFS of the same design chromaticity. A comparison of some of the ATF2 design parameters with those of the ILC and CLIC are shown in table 1. With the 1.3 GeV beam energy of ATF2, the target spot size to prove the operability of this optics for ILC is 37nm. This is referred to as 'Goal 1'. In addition, Goal 1 requires the demonstration of stable operations with such a beam size at the Interaction Point (IP). 'Goal 2' is to demonstrate nm-level stability with respect to the IP beam monitors, such as is required for stable beam collisions at ILC or CLIC. A further goal is to attempt to increase the chromaticity of the final focus optics, reducing the IP beta functions to a level where the system more closely resembles the CLIC FFS, and also for some of the newly proposed ILC parameters. It is anticipated that the difficulty of successfully tuning the FFS to deliver design IP beam spot sizes scales with the chromaticity of the system. The design of the achromatic focusing system involves fine cancelation of first, second and third order aberrations at the IP. One needs more accurate cancelation the tighter one attempts to focus the beam, also including more higher order terms. By gradually pushing the system to smaller IP beta functions and higher chromaticity we hope to learn what the limits of such a design are when applied practically. This will give confidence in the design philosophy behind future high-luminosity colliders and in the simulations used to predict their behaviour.

43 PARTICLE ACCELERATORS↗

Spatial resolution limits of YAG:CE powder beam-profile monitors at the Fermilab A0 photoinjector

The A0 photoinjector (A0PI) facility at Fermilab has an ongoing proof-of-principle experiment to demonstrate the exchange of the transverse horizontal and longitudinal emittances. This experiment relies on measurements of the transverse emittances and longitudinal emittance upstream and downstream of the exchanger beamline. At several locations along the accelerator beamline, YAG:Ce powder scintillator screens are used to determine beam size, divergence when the screen is downstream of a set of 50-micron-wide tungsten slits, and energy spread when used in an electron beam spectrometer. We have recently performed direct comparisons of beam image and slit image sizes using both the optical transition radiation (OTR) screens and the YAG:Ce screens. For micropulse charges of 250 pC and with beam energies of 15 MeV, we systematically observed larger beam image sizes with the YAG:Ce screens than with the OTR screens. We deduced a YAG:Ce screen spatial resolution limit of sigma = 140 to 180 microns. This term is large enough relative to the actual beam sizes and slit image sizes to be needed as a correction term subtracted in quadrature.

43 PARTICLE ACCELERATORS↗

Final design of thermal diagnostic system in SPIDER ion source

The prototype radio frequency source of the ITER heating neutral beams will be first tested in SPIDER test facility to optimize H{sup −} production, cesium dynamics, and overall plasma characteristics. Several diagnostics will allow to fully characterise the beam in terms of uniformity and divergence and the source, besides supporting a safe and controlled operation. In particular, thermal measurements will be used for beam monitoring and system protection. SPIDER will be instrumented with mineral insulated cable thermocouples, both on the grids, on other components of the beam source, and on the rear side of the beam dump water cooled elements. This paper deals with the final design and the technical specification of the thermal sensor diagnostic for SPIDER. In particular the layout of the diagnostic, together with the sensors distribution in the different components, the cables routing and the conditioning and acquisition cubicles are described.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Beam Extinction Monitoring in the Mu2e Experiment

The Mu2e Experiment at Fermilab will search for the conversion of a muon to an electron in the field of an atomic nucleus with unprecedented sensitivity. The experiment requires a beam consisting of proton bunches approximately 200ns FW long, separated by 1.7 microseconds, with no out-of-time protons at the 10⁻¹⁰ fractional level. The verification of this level of extinction is very challenging. The proposed technique uses a special purpose spectrometer which will observe particles scattered from the production target of the experiment. The acceptance will be limited such that there will be no saturation effects from the in-time beam. The precise level and profile of the out-of-time beam can then be built up statistically, by integrating over many bunches.

43 PARTICLE ACCELERATORS↗

T-1073: 2016 Precision Beam Timing Monitor

This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of Fermilab, Northern Illinois University (NIU), Lewis University, and Purdue University, who have committed to participate in beam tests to be carried out during the 2015-2016 Fermilab Test Beam Facility program. The TSW is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this scope of work to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still to be signed) by an authorized representative of each institution collaborating on this experiment.

43 PARTICLE ACCELERATORS↗

Beam imaging in the injection line of the INFN-LNS superconducting cyclotron

A cheap and efficient diagnostic system for beam monitoring has been recently developed at INFN-LNS in Catania. It consists of a high sensitivity CCD camera detecting the light produced by an ion beam hitting the surface of a scintillating screen and a frame grabber for image acquisition. A scintillating screen, developed at INFN-LNS and consisting of a 2 μm BaF{sub 2} layer evaporated on an aluminium plate, has been tested by using {sup 20}Ne and {sup 40}Ar beams in the keV energy range. The CAESAR ECR ion source has been used for investigating the influence of the frequency and magnetic field tuning effects, the impact of the microwave injected power, and of the focusing solenoids along the low energy beam transport on the beam shape and current. These tests will allow to better understand the interplay between the plasma and beam dynamics and, moreover, to improve the transport efficiency along the low energy beam line and the matching with the superconducting cyclotron, particularly relevant in view of the expected upgrade of the machine.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status of the SAGA Light Source

The SAGA Light Source (SAGA-LS) is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring that is 75.6 m in circumference. The SAGA-LS has been stably providing synchrotron radiation to users since it first started user operation in February 2006. Along with the user operation, various machine improvements have been made over the past years, including upgrading the injector linac control system, replacing a septum magnet and constructing a beam diagnostic system. In addition to these improvements, insertion devices have been developed and installed. An APPLE-II type variable polarization undulator was installed in 2008. To address the demand from users for high-flux hard x-rays, a superconducting 4 T class wiggler is being developed. An experimental setup for generating MeV photons by laser Compton scattering is being constructed for beam monitoring and future user experiments.

43 PARTICLE ACCELERATORS↗

Generation and manipulation of proton beams by ultra-short laser pulses

Applying a 21-channel Thomson spectrometer setup has revealed further insight to the connection between spatial and spectral beam characteristic of laser accelerated protons. Analyzing the central emission cone (plus/minus 3 degree) shows an increasing beam divergency for protons with increasing kinetic energies. This holds for protons emitted from the same source area at the target surface. The whole beam is a well ordered system with a clear functional dependence of trajectories on proton energy. This is a consequence of the source dynamics which is determined by the sheath development in time. Thus laser-driven ion beams can be advantageously manipulated for further propagation to an experiment. We demonstrate this capability with a magnetic quadrupole and obtain a nearly parallel and monochromatized beam. Furthermore we set our achievements in beam production efficiency into context with other laser systems and demonstrate the potential of very-thin target foils.

43 PARTICLE ACCELERATORS↗

An integral quality monitoring system for real-time verification of intensity modulated radiation therapy

Purpose: To develop an independent and on-line beam monitoring system, which can validate the accuracy of segment-by-segment energy fluence delivery for each treatment field. The system is also intended to be utilized for pretreatment dosimetric quality assurance of intensity modulated radiation therapy (IMRT), on-line image-guided adaptive radiation therapy, and volumetric modulated arc therapy. Methods: The system, referred to as the integral quality monitor (IQM), utilizes an area integrating energy fluence monitoring sensor (AIMS) positioned between the final beam shaping device [i.e., multileaf collimator (MLC)] and the patient. The prototype AIMS consists of a novel spatially sensitive large area ionization chamber with a gradient along the direction of the MLC motion. The signal from the AIMS provides a simple output for each beam segment, which is compared in real time to the expected value. The prototype ionization chamber, with a physical area of 22x22 cm{sup 2}, has been constructed out of aluminum with the electrode separations varying linearly from 2 to 20 mm. A calculation method has been developed to predict AIMS signals based on an elementwise integration technique, which takes into account various predetermined factors, including the spatial response function of the chamber, MLC characteristics, beam transmission through the secondary jaws, and field size factors. The influence of the ionization chamber on the beam has been evaluated in terms of transmission, surface dose, beam profiles, and depth dose. The sensitivity of the system was tested by introducing small deviations in leaf positions. A small set of IMRT fields for prostate and head and neck plans was used to evaluate the system. The ionization chamber and the data acquisition software systems were interfaced to two different types of linear accelerators: Elekta Synergy and Varian iX. Results: For a 10x10 cm{sup 2} field, the chamber attenuates the beam intensity by 7% and 5% for 6 and 18 MV beams, respectively, without significantly changing the depth dose, surface dose, and dose profile characteristics. An MLC bank calibration error of 1 mm causes the IQM signal of a 3x3 cm{sup 2} aperture to change by 3%. A positioning error in a single 5 mm wide leaf by 3 mm in 3x3 cm{sup 2} aperture causes a signal difference of 2%. Initial results for prostate and head and neck IMRT fields show an average agreement between calculation and measurement to within 1%, with a maximum deviation for each of the smallest beam segments to within 5%. When the beam segments of a prostate IMRT field were shifted by 3 mm from their original position, along the direction of the MLC motion, the IQM signals varied, on average, by 2.5%. Conclusions: The prototype IQM system can validate the accuracy of beam delivery in real time by comparing precalculated and measured AIMS signals. The system is capable of capturing errors in MLC leaf calibration or malfunctions in the positioning of an individual leaf. The AIMS does not significantly alter the beam quality and therefore could be implemented without requiring recommissioning measurements.

62 RADIOLOGY AND NUCLEAR MEDICINE↗