At least 235 records · Page 13

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.↗

NASA-Wide Fastener Technical Interchange Meeting

This document summarizes the minutes of the second NASA-Wide Fastener Technical Interchange Meeting (TIM) held November 15-16, 1994, and compiles the viewgraph presentations at the TIM by NASA and contractor personnel. The information in this document may be of value to the NASA and contractor fastener engineering community in determining the fastener controls and initiatives that existed at the time of the TIM.

Gamwell, W. R.↗

Quality assurance and risk management: Perspectives on Human Factors Certification of Advanced Aviation Systems

This paper is based on the experience of engineering psychologists advising the U.K. Ministry of Defense (MoD) on the procurement of advanced aviation systems that conform to good human engineering (HE) practice. Traditional approaches to HE in systems procurement focus on the physical nature of the human-machine interface. Advanced aviation systems present increasingly complex design requirements for human functional integration, information processing, and cognitive task performance effectiveness. These developing requirements present new challenges for HE quality assurance (QA) and risk management, requiring focus on design processes as well as on design content or product. A new approach to the application of HE, recently adopted by NATO, provides more systematic ordering and control of HE processes and activities to meet the challenges of advanced aircrew systems design. This systematic approach to HE has been applied by MoD to the procurement of mission systems for the Royal Navy Merlin helicopter. In MoD procurement, certification is a judicial function, essentially independent of the service customer and industry contractor. Certification decisions are based on advice from MoD's appointed Acceptance Agency. Test and evaluation (T&E) conducted by the contractor and by the Acceptance Agency provide evidence for certification. Certification identifies limitations of systems upon release to the service. Evidence of compliance with HE standards traditionally forms the main basis of HE certification and significant non-compliance could restrict release. The systems HE approach shows concern for the quality of processes as well as for the content of the product. Human factors certification should be concerned with the quality of HE processes as well as products. Certification should require proof of process as well as proof of content and performance. QA criteria such as completeness, consistency, timeliness, and compatibility provide generic guidelines for progressive acceptance and certification of HE processes. Threats to the validity of certification arise from problems and assumptions in T&E methods. T&E should seek to reduce the risk of specification non-compliance and certification failure.

Taylor, Robert M.↗

Space Mechanisms Lessons Learned Study. Volume 1: Summary

Hundreds of satellites have been launched to date. Some have operated extremely well and others have not. In order to learn from past operating experiences, a study was conducted to determine the conditions under which space mechanisms (mechanically moving components) have previously worked or failed. The study consisted of: (1) an extensive literature review that included both government contractor reports and technical journals; (2) communication and visits (when necessary) to the various NASA and DOD centers and their designated contractors (this included contact with project managers of current and prior NASA satellite programs as well as their industry counterparts); (3) requests for unpublished information to NASA and industry; and (4) a mail survey designed to acquire specific mechanism experience. The information obtained has been organized into two volumes. Volume 1 provides a summary of the lessons learned, the results of a needs analysis, responses to the mail survey, a listing of experts, a description of some available facilities and a compilation of references. Volume 2 contains a compilation of the literature review synopsis.

Shapiro, Wilbur↗

NASA assurance terms and definitions

This publication provides a compendium of commonly used safety, reliability, maintainability, and quality assurance (SRM&QA) definitions to ensure standardized assurance communications among NASA Field Installations, Headquarters, and contractors. This list of standard assurance terms and definitions shall be utilized by all NASA organizations and contractors. Program/project tailoring of these definitions may be permitted for specific program applications.

Source record↗

Electronic availability of microgravity experiments safety and integration requirements documents

This follow-on to NASA Contractor Report 195447, Microgravity Experiments Safety and Integration Requirements Document Tree, provides the details for accessing the systems that contain the official, electronic versions of the documents initially researched in NASA Contractor Report 195447. The data in this report serves as a valuable information source for the NASA Lewis Research Center Project Documentation Center (PDC), as well as for all developers of space experiments. The PDC has acquired the hardware, software, ID's, and passwords necessary to access most of these systems and is now able to provide customers with current document information as well as immediate delivery of available documents in either electronic or hard copy format.

Hogan, Jean M.↗

International space station wire program

Hardware provider wire systems and current wire insulation issues for the International Space Station (ISS) program are discussed in this viewgraph presentation. Wire insulation issues include silicone wire contamination, Tefzel cold temperature flexibility, and Russian polyimide wire insulation. ISS is a complex program with hardware developed and managed by many countries and hundreds of contractors. Most of the obvious wire insulation issues are known by contractors and have been precluded by proper selection.

May, Todd↗

Space Mechanisms Lessons Learned Study. Volume 2: Literature Review

Hundreds of satellites have been launched to date. Some have operated extremely well and others have not. In order to learn from past operating experiences, a study was conducted to determine the conditions under which space mechanisms (mechanically moving components) have previously worked or failed. The study consisted of an extensive literature review that included both government contractor reports and technical journals, communication and visits (when necessary) to the various NASA and DOD centers and their designated contractors (this included contact with project managers of current and prior NASA satellite programs as well as their industry counterparts), requests for unpublished information to NASA and industry, and a mail survey designed to acquire specific mechanism experience. The information obtained has been organized into two volumes. Volume 1 provides a summary of the lesson learned, the results of a needs analysis, responses to the mail survey, a listing of experts, a description of some available facilities, and a compilation of references. Volume 2 contains a compilation of the literature review synopsis.

Shapiro, Wilbur↗

COMET Progresses Toward First Mission

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the CDD's and their industrial partners. During this year major support contracts were signed, preliminary design reviews conducted, experiments selected for the first mission, and long lead items place on order. The Program Office and CCDS Monitors took an active role in guiding COMET through the activation maze. Launch and recovery sites were selected and licenses for the launch vehicle, recovery system, and recovery operations were filed by the contractors with the Department of Transportation. As the period closed, COMET was preparing for Critical Design Reviews on all major systems and a target launch data was selected. This report deals primarily with the programmatic issues which were resolved as the program matured. At times is is impossible to disassociate the technical from the programmatic and, in such cases the technical material is presented to provide insight into the paths selected by both CCDS and Contractor Management.

Pawlick, J.↗

Technology Transfer

The objective of this summer's work was to attempt to enhance Technology Application Group (TAG) ability to measure the outcomes of its efforts to transfer NASA technology. By reviewing existing literature, by explaining the economic principles involved in evaluating the economic impact of technology transfer, and by investigating the LaRC processes our William & Mary team has been able to lead this important discussion. In reviewing the existing literature, we identified many of the metrics that are currently being used in the area of technology transfer. Learning about the LaRC technology transfer processes and the metrics currently used to track the transfer process enabled us to compare other R&D facilities to LaRC. We discuss and diagram impacts of technology transfer in the short run and the long run. Significantly, it serves as the basis for analysis and provides guidance in thinking about what the measurement objectives ought to be. By focusing on the SBIR Program, valuable information regarding the strengths and weaknesses of this LaRC program are to be gained. A survey was developed to ask probing questions regarding SBIR contractors' experience with the program. Specifically we are interested in finding out whether the SBIR Program is accomplishing its mission, if the SBIR companies are providing the needed innovations specified by NASA and to what extent those innovations have led to commercial success. We also developed a survey to ask COTR's, who are NASA employees acting as technical advisors to the SBIR contractors, the same type of questions, evaluating the successes and problems with the SBIR Program as they see it. This survey was developed to be implemented interactively on computer. It is our hope that the statistical and econometric studies that can be done on the data collected from all of these sources will provide insight regarding the direction to take in developing systematic evaluations of programs like the SBIR Program so that they can reach their maximum effectiveness.

Smith, Nanette R.↗

A Model for NASA-KSC's Privatization Transition

This paper describes a model for government agencies that are considering privatization of all or part of their functions. Privatization encompasses the transitioning of government functions from government run to contractor run. The model developed in this paper is used to analyze the National Aeronautics and Space Administration's (NASA) decision to privatize space shuttle operations at the Kennedy Space Center (KSC). Several specific recommendations are given to KSC as they attempt to operationalize this privatization decision at the Center and to transition to a new relationship with their contractors.

Lavelle, Jerome P.↗

Force Limited Vibration Testing Monograph

The practice of limiting the shaker force in vibration tests was investigated at the NASA Jet Propulsion Laboratory (JPL) in 1990 after the mechanical failure of an aerospace component during a vibration test. Now force limiting is used in almost every major vibration test at JPL and in many vibration tests at NASA Goddard Space Flight Center (GSFC) and at many aerospace contractors. The basic ideas behind force limiting have been in the literature for several decades, but the piezo-electric force transducers necessary to conveniently implement force limiting have been available only in the last decade. In 1993, funding was obtained from the NASA headquarters Office of Chief Engineer to develop and document the technology needed to establish force limited vibration testing as a standard approach available to all NASA centers and aerospace contractors. This monograph is the final report on that effort and discusses the history, theory, and applications of the method in some detail.

Scharton, Terry D.↗

Database Development for Electrical, Electronic, and Electromechanical (EEE) Parts for the International Space Station Alpha

More effective electronic communication processes are needed to transfer contractor and international partner data into NASA and prime contractor baseline database systems. It is estimated that the International Space Station Alpha (ISSA) parts database will contain up to one million parts each of which may require database capabilities for approximately one thousand bytes of data for each part. The resulting gigabyte database must provide easy access to users who will be preparing multiple analyses and reports in order to verify as-designed, as-built, launch, on-orbit, and return configurations for up to 45 missions associated with the construction of the ISSA. Additionally, Internet access to this data base is strongly indicated to allow multiple user access from clients located in many foreign countries. This summer's project involved familiarization and evaluation of the ISSA Electrical, Electronic, and Electromechanical (EEE) Parts data and the process of electronically managing these data. Particular attention was devoted to improving the interfaces among the many elements of the ISSA information system and its global customers and suppliers. Additionally, prototype queries were developed to facilitate the identification of data changes in the data base, verifications that the designs used only approved parts, and certifications that the flight hardware containing EEE parts was ready for flight. This project also resulted in specific recommendations to NASA for further development in the area of EEE parts database development and usage.

Wassil-Grimm, Andrew D.↗

Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an updated flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

Su, Ching-Hua↗

Regular Topologies for Gigabit Wide-Area Networks: Congestion Avoidance Testbed Experiments

This document is Volume 3 of the final technical report on the work performed by SRI International (SRI) on SRI Project 8600. The document includes source listings for all software developed by SRI under this effort. Since some of our work involved the use of ST-II and the Sun Microsystems, Inc. (Sun) High-Speed Serial Interface (HSI/S) driver, we have included some of the source developed by LBL and BBN as well. In most cases, our decision to include source developed by other contractors depended on whether it was necessary to modify the original code. If we have modified the software in any way, it is included in this document. In the case of the Traffic Generator (TG), however, we have included all the ST-II software, even though BBN performed the integration, because the ST-II software is part of the standard TG release. It is important to note that all the code developed by other contractors is in the public domain, so that all software developed under this effort can be re-created from the source included here.

Denny, Barbara A.↗

Adaptive Full Aperture Wavefront Sensor Study

This grant and the work described was in support of a Seven Segment Demonstrator (SSD) and review of wavefront sensing techniques proposed by the Government and Contractors for the Next Generation Space Telescope (NGST) Program. A team developed the SSD concept. For completeness, some of the information included in this report has also been included in the final report of a follow-on contract (H-27657D) entitled "Construction of Prototype Lightweight Mirrors". The original purpose of this GTRI study was to investigate how various wavefront sensing techniques might be most effectively employed with large (greater than 10 meter) aperture space based telescopes used for commercial and scientific purposes. However, due to changes in the scope of the work performed on this grant and in light of the initial studies completed for the NGST program, only a portion of this report addresses wavefront sensing techniques. The wavefront sensing techniques proposed by the Government and Contractors for the NGST were summarized in proposals and briefing materials developed by three study teams including NASA Goddard Space Flight Center, TRW, and Lockheed-Martin. In this report, GTRI reviews these approaches and makes recommendations concerning the approaches. The objectives of the SSD were to demonstrate functionality and performance of a seven segment prototype array of hexagonal mirrors and supporting electromechanical components which address design issues critical to space optics deployed in large space based telescopes for astronomy and for optics used in spaced based optical communications systems. The SSD was intended to demonstrate technologies which can support the following capabilities: Transportation in dense packaging to existing launcher payload envelopes, then deployable on orbit to form a space telescope with large aperture. Provide very large (greater than 10 meters) primary reflectors of low mass and cost. Demonstrate the capability to form a segmented primary or quaternary mirror into a quasi-continuous surface with individual subapertures phased so that near diffraction limited imaging in the visible wavelength region is achieved. Continuous compensation of optical wavefront due to perturbations caused by imperfections, natural disturbances, and equipment induced vibrations/deflections to provide near diffraction limited imaging performance in the visible wavelength region. Demonstrate the feasibility of fabricating such systems with reduced mass and cost compared to past approaches.

Robinson, William G.↗

Implementation of Insight Responsibilities in Process Engineering

This report describes an approach for evaluating flight readiness (COFR) and contractor performance evaluation (award fee) as part of the insight role of NASA Process Engineering at Kennedy Space Center. Several evaluation methods are presented, including systems engineering evaluations and use of systems performance data. The transition from an oversight function to the insight function is described. The types of analytical tools appropriate for achieving the flight readiness and contractor performance evaluation goals are described and examples are provided. Special emphasis is placed upon short and small run statistical quality control techniques. Training requirements for system engineers are delineated. The approach described herein would be equally appropriate in other directorates at Kennedy Space Center.

Osborne, Deborah M.↗

A Three-Dimensional Analysis of the Galactic Gamma-Ray Emission Resulting from Cosmic-Ray Interaction with the Interstellar Gas and Radiation Fields

This final report outlines the progress of the contractor's support for the analysis of data under ADP (NRA 96-ADP-08; Proposal No. 167-96 adp). The primary task object was to construct a 3-D model for the distribution of high-energy (20 MeV-30 GeV) gamma-ray emission in the Galactic disk. Under this task the contractor was to utilize data from the EGRET instrument on the Compton Gamma-Ray Observatory, HI and CO surveys, radio-continuum surveys at 408 MHz, 1420 MHz, 5 GHz, and 19 GHz, the COBE Diffuse Infrared Background Experiment (DIRBE) all-sky maps from I to 240 um, and ground-based B,V, J, H and K photometry. The respective contributions to the high-latitude gamma-ray emission from cosmic ray-matter interactions, inverse Compton scattering, and extra-galactic emission were to be determined.

Sodraski, Thomas J.↗