Search NASA⌕ Search

SEARCH · Search NASA

Results for “COUNTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Real-Time Quantitative Analysis of H2, He, O2, and Ar by Quadrupole Ion Trap Mass Spectrometry

The use of a quadrupole ion trap mass spectrometer for quantitative analysis of hydrogen and helium as well as other permanent gases is demonstrated. The customized instrument utilizes the mass selective instability mode of mass analysis as with commercial instruments; however, this instrument operates at a greater RF trapping frequency and without a buffer gas. With these differences, a useable mass range from 2 to over 50 Da is achieved, as required by NASA for monitoring the Space Shuttle during a launch countdown. The performance of the ion trap is evaluated using part-per-million concentrations of hydrogen, helium, oxygen and argon mixed into a nitrogen gas stream. Relative accuracy and precision when quantitating the four analytes were better than the NASA-required minimum of 10% error and 5% deviation, respectively. Limits of detection were below the NASA requirement of 25-ppm hydrogen and 100-ppm helium; those for oxygen and argon were slightly higher than the requirement. The instrument provided adequate performance at fast data recording rates, demonstrating the utility of an ion trap mass spectrometer as a real-time quantitative monitoring device for permanent gas analysis.

Ottens, Andrew K.↗

LOX System Prestart Conditioning on X-34

The X-34 is a reusable launch vehicle that will be carried underneath an airplane to altitude of 35000 feet where it will be launched. It utilizes a single Fastrac 60K rocket engine for propulsion. This engine burns RP-1 and Lox as propellants and has a single shaft Lox and RP-1 turbopump. With these features there are three important requirements that must be met during the prestart thermal conditioning of this engine and feed system. First, the Lox temperature prior to starting the engine must be cold enough to be in the predefined start box at that pressure. Second, the RP-1 in the single shaft turbopump in close proximity to the lox must not freeze significantly where it effects turbopump or engine operation. Third, the chill phase of the prestart countdown has been allocated 700lb of Lox which if exceeded starts to effect mission performance. Extensive testing and analysis has been performed to evaluate the chill characteristics of the Fastrac Engine as well as test facilities and X-34 Lox feed and bleed systems.

Goode, Brian K.↗

STS-111 Flight Day 1 Highlights

On Flight Day 1 of STS-111, the crew of Endeavour (Kenneth Cockrell, Commander; Paul Lockhart, Pilot; Franklin Chang-Diaz, Mission Specialist; Philippe Perrin, Mission Specialist) and the Expedition 5 crew (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer) being transported to the International Space Station (ISS) are shown preparing for launch in the suit-up room of the crew quarters, and then shown heading to the shuttle. Following commencement of the countdown, the launch is then shown, with close-ups of the rocket nozzles as lift-off occurs. Endeavour is shown as it gains altitude, accelerates to 2400 mph, and drops its solid rocket boosters. The video ends with video of Endeavour's payload bay, having been opened after leaving Earth's atmosphere.

Source record↗

STS-112 Flight Day 1 Highlights

On the first day of STS-112 the crew (Commander Jeff Ashby, Pilot Pam Melroy and Mission Specialists Sandy Magnus, Piers Sellers, David Wolf and Fyodor Yurchikhin) are shown preparing for launch at Kennedy Space Center, being transported to the Space Shuttle Atlantis at its launch pad, and being seated in the Orbiter. During the launch, the External Tank (ET) camera, mounted to the top of Atlantis's ET and aimed downward) will provide never before seen footage of the shuttle during lift-off. Following the final countdown and liftoff, the ET camera provides footage as Atlantis quickly leaves the Earth behind, at speeds over 2,800 miles per hour. Following orbital insertion, the shuttle's payload bay doors are shown opening in footage provided by a payload bay camera. Sellers and Magnus narrate their thoughts during a replay of the initial launch sequence, shortly after entering orbit. Following the tape, they are shown in the crewcabin with the rest of the crew, and they each share brief thoughts.

Source record↗

STS-113 Flight Day 1 Highlights

The first flight day of the STS-113 begins with a live shot of the Space Shuttle Endeavor at the Kennedy Space Center. The STS-113 crew consists of Commander Jim Wetherbee, Pilot Paul Lockhart, and Mission Specialists Michael Lopez-Alegria, and John Herrington. The STS-113 crewmembers are accompanied Expedition 6 astronauts Kenneth Bowersox, Donald Pettit and Nikolai Budarin. The purpose of this flight is to carry the P1 truss segment to the International Space Station along with the Expedition 6 flight crew. The crewmembers are shown getting suited for the space flight. Countdown and lift off of the Space Shuttle Endeavor is also shown.

Source record↗

High Intensity Lighting

Nightime illumination is an important part of round-the-clock pre-launch preparations because NASA uses TV and film cameras to monitor each step of the preliminaries and at times to identify the cause of malfunction during countdown. Generating a one billion candlepower beam visible 50 miles away, the lamps developed by Duro-Test Corporation provide daylight quality light that eliminates color distortion in film and TV coverage. The lighting system was first used at Kennedy Space Center in 1968 for the launch of Apollo 8. Modified versions are available in wide range of applications, such as the battery of spotlights with colored filters that light up Niagara Falls, as well as the lamps used in the projectors for the Smithsonian's IMAX Theatre, indoor theatres with supersized screens and outdoor projection systems.

Source record↗

STS-103 Photo-op/Suit-up/Depart O&C/Launch Discovery On-Orbit/Landing/Crew Egress

The crew of the STS-103 space mission are shown as they prepare for launch and landing of the space shuttle discovery. The crew includes: Commander Curtis L. Brown, Pilot Scott J. Kelly, and Mission Specialists: Steven L. Smith, C. Michael Foale, John M. Grunsfeld, Claude Nicollier and Jean-francois Clervoy. Footage of these astronauts during suit-up, Ingress, Egress and Operations and Checkout (O&C) is presented. Live footage of the countdown and launch of the space shuttle discovery is shown from various vantage points such as the Tower 1, Vehicle Assembly Building (VAB), and pad perimeter. Once in orbit, a presentation of Steven Smith, John Grunsfield, Michael Foale and Claude Nicollier performing three spacewalks to repair the HST is shown. The landing of the space shuttle discovery at the Kenndy Space Center is shown.

Source record↗

Fluid Dynamics of Small, Rugged Vacuum Pumps of Viscous-Drag Type

The need to identify spikes in the concentration of hazardous gases during countdowns to space shuttle launches has led Kennedy Space Center to acquire considerable expertise in the design, construction, and operation of special-purpose gas analyzers of mass-spectrometer type. If such devices could be miniaturized so as to fit in a small airborne package or backpack them their potential applications would include integrated vehicle health monitoring in later-generation space shuttles and in hazardous material detection in airports, to name two examples. The bulkiest components of such devices are vacuum pumps, particularly those that function in the low vacuum range. Now some pumps that operate in the high vacuum range (e.g. molecular-drag and turbomolecular pumps) are already small and rugged. The present work aims to determine whether, on physical grounds, one may or may not adopt the molecular-drag principle to the low-vacuum range (in which case viscous-drag principle is the appropriate term). The deliverable of the present effort is the derivation and justification of some key formulas and calculation methods for the preliminary design of a single-spool, spiral-channel viscous-drag pump.

Russell, John M.↗

[Activities of System Studies and Simulation, Inc.]

Contents include the following: 1. Launch Vehicle Interface Work Performed: a. S3 provided to KSC the new launch inclination targets needed for the April '04 launch date. 2. Prelaunch operations work performed: a. S3 updated the staffing plan for MSFC on-console personnel\during the Final Countdown prior to launch. 3. Software Assessment Work Performed: a. S3 evaluated and recommended approval for Program Control Board (PCB) proposed change 649 for ground software changes, as well as change 650 and 650A for Stored Program Commands. 4. Education and Public Outreach Work Performed: a. S3 continues to coordinate the effort for the design and fabrication of scale models of the GP-3 for use at the launch site, education forums, and management/technical briefings. S3 also prepared a Change Request for additional funds needed for fabrication of additional scale models. S3 drafted the planned uses of these models, including the possibility of participation in the Boston, MA showings of the traveling Einstein Exhibit. 5. Program Management Support Work Performed: a. S3 prepared the input for and closed three MSFC Centerwide Action Item Tracking Systems (CAITS) actions during this period.

Source record↗

Tropospheric Wind Monitoring During Day-of-Launch Operations for NASA's Space Shuttle Program

The Environments Group at the National Aeronautics and Space Administration's Marshall Space Flight Center monitors the winds aloft above Kennedy Space Center (KSC) in support of the Space Shuttle Program day-of-launch operations. Assessment of tropospheric winds is used to support the ascent phase of launch. Three systems at KSC are used to generate independent tropospheric wind profiles prior to launch; 1) high resolution jimsphere balloon system, 2) 50-MHz Doppler Radar Wind Profiler (DRWP) and 3) low resolution radiosonde system. All independent sources are compared against each other for accuracy. To assess spatial and temporal wind variability during launch countdown each jimsphere profile is compared against a design wind database to ensure wind change does not violate wind change criteria.

Decker, Ryan↗

STS-114: Discovery Launch Readiness Press Conference

This press conference, attended by representatives from the national, Florida, and aerospace media, addresses launch, weather, and safety issues related to Space Shuttle Discovery prior to its launch on the STS-114 Return to Flight mission. The Master of Ceremonies is George Diller from NASA Public Affairs, and the panelists are: Space Shuttle Program Manager Bill Parsons, ISS Program Manager (JSC) Bill Gerstenmaier, Space Shuttle Deputy Program Manager Wayne Hale, Director of Shuttle Processing Mike Wetmore, ISS Program Manager (JAXA) Dr. Kuniaki Shiraki, and Launch Weather Officer (USAF) Mindy Chavez. Questions included the following topics: predicted weather conditions at launch, contingency rescue plans, countdown procedures, and risk management, as well as implications of the Return to Flight for the International Space Station (ISS).

Source record↗

STS-114: Discovery Mission Status Briefing

This video features mid-deck payloads being stowed at Pad 39B, a ribbon cutting ceremony at the NASA Shuttle Launch Facility (SLF) Air Traffic Control Tower and footage of the air traffic control radar constructed at Shiloh. The STS-114 Crewmembers, Commander, Eileen Collins, Pilot, James Kelly, Mission Specialist, Charles Camarda, Mission Specialist, Wendy Lawrence, Mission Specialist, Soichi Noguchi, JAXA, Mission Specialist, Stephen Robinson, and Mission Specialist Andrew Thomas are shown arriving at the Shuttle Landing Facility at Kennedy Space Center. Eileen Collins introduces each crew member and talks to the news media about their role during this mission. The astronauts are also shown during their spacesuit fit check at the Operations and Control Center (O&C) and footage of a practice flight is presented. The start of the countdown clock in the firing room 3 of the launch control center is shown

Source record↗

STS-114: TCDT Soichi Noguchi Press Briefing

Mission Specialist, Soichi Noguchi, of the Japanese Aerospace Exploration Agency (JAXA) is seen during a pre-launch interview. He talks about his first Terminal Countdown Demonstration Test (TCDT) which is a standard training session that precedes every shuttle launch.

Source record↗

STS-114/Discovery Flight Readiness Review Press Briefing

This press briefing on Flight Readiness Review (FRR) for the STS-114 Discovery flight is shown. Dean Acosta, Deputy Associate Administrator for Public Affairs, introduces the panel. The panel consist of: Michael Griffin, NASA Administrator, William Readdy, Associate Administrator of Space Operations, Bill Parsons, Space Shuttle Program Manager, and Mike Leinbach, NASA Launch Director. Questions from the media includes the following topics: certification, countdown, ice on the external tank, debris, and safety of the Space Shuttle Discovery.

Source record↗

STS-114: Discovery TCDT Flight Crew Test Media Event at Pad 39-B

The STS-114 Space Shuttle Discovery Terminal Countdown Demonstration Test (TCDT) flight crew is shown at Pad 39-B. Eileen Collins, Commander introduces the astronauts. Andrew Thomas, mission specialist talks about his primary responsibility of performing boom inspections, Wendy Lawrence, Mission Specialist 4 (MS4) describes her role as the robotic arm operator supporting Extravehicular Activities (EVA), Stephen Robinson, Mission Specialist 3 (MS3) talks about his role as flight engineer, Charlie Camarda, Mission Specialist 5 (MS5) says that his duties are to perform boom operations, transfer operations from the space shuttle to the International Space Station and spacecraft rendezvous. Soichi Noguchi, Mission Specialist 1 (MS1) from JAXA, introduces himself as Extravehicular Activity 1 (EVA1), and Jim Kelley, Pilot will operate the robotic arm and perform pilot duties. Questions from the news media about the safety of the external tank, going to the International Space Station and returning, EVA training, and thoughts about the Space Shuttle Columbia crew are answered.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham, NASA Public Affairs hosted this conference. Bill Parsons, Space Shuttle Program Manager; John Muratore, Shuttle System and Integration Manager; Mike Wetmore, Shuttle Processing Director were present. The Panel summarizes that thorough effort of analysis and test techniques and great amount of work is being done to fix the sensor problem and will be ready to call the stations for a launch countdown process after the trouble shooting is fully completed. Launch time, grounding problem, sensor failure, trouble shooting, tanking test, pin swap, and heaters were topics covered with the News media. For clarification, Bruce Buckingham provided information that preferred launch time is at 10:39am on July 26, Eastern Time.

Source record↗

Fault-Detection Tool Has Companies 'Mining' Own Business

A successful launching of NASA's Space Shuttle hinges heavily on the three Space Shuttle Main Engines (SSME) that power the orbiter. These critical components must be monitored in real time, with sensors, and compared against expected behaviors that could scrub a launch or, even worse, cause in- flight hazards. Since 1981, SSME faults have caused 23 scrubbed launches and 29 percent of total Space Shuttle downtime, according to a compilation of analysis reports. The most serious cases typically occur in the last few seconds before ignition; a launch scrub that late in the countdown usually means a period of investigation of a month or more. For example, during the launch attempt of STS-41D in 1984, an anomaly was detected in the number three engine, causing the mission to be scrubbed at T-4 seconds. This not only affected STS-41D, but forced the cancellation of another mission and caused a 2-month flight delay. In 2002, NASA s Kennedy Space Center, the Florida Institute of Technology, and Interface & Control Systems, Inc., worked together to attack this problem by creating a system that could automate the detection of mechanical failures in the SSMEs fuel control valves.

Source record↗

Hardware and Programmatic Progress on the Ares I-X Flight Test

In less than two years, the National Aeronautics and Space Administration (NASA) will execute the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle; which, together with the Ares V cargo launch vehicle (Figure 1), will eventually send humans to the Moon, Mars, and beyond. As the countdown to this first Ares mission continues, personnel from across the Ares I-X Mission Management Office (MMO) are finalizing designs and, in some cases, already fabricating vehicle hardware in preparation for an April 2009 launch. This paper will discuss the hardware and programmatic progress of the Ares I-X mission.

Davis, Stephan R.↗