Search NASA⌕ Search

SEARCH · Search NASA

Results for “Compressed air systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

218 records · Page 13

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Advanced sorbents for modular oxygen production for REMS gasifiers

Under a DOE funded effort, Thermosolv LLC has been developing a sorbent-based oxygen production technology for gasification and oxy-combustion applications. The sorbents utilize oxygen-storage properties of certain perovskites to (1) selectively adsorb oxygen at moderate temperature from compressed air and (2) release the adsorbed oxygen into a vacuum or a sweep gas such as CO2 and/or steam. Through cyclic operations of multiple sorbent beds such a process can be made continuous. Pressure drop across the sorbent bed and other similar design considerations dictate that the sorbent be in the form of a high surface-area-to-volume pellet and yet still possess sufficient crush strength and integrity. Process efficiency is determined by the sorption and desorption kinetics and sorbent capacity. Typical process involves cycle times in the order of 100 seconds, a time too short to fully utilize the full volume of the sorbent and the sorption capacity of the sorbent pellets. As a part of this project, Thermosolv LLC undertook the development of oxygen sorbents as a high-surface area supported sorbent on a light-weight inert support to (1) reduce the cost, (2) increase the productivity, and (3) reduce the overall weight of the reactor. Using a previously developed perovskite (LSCF 1991) with its well-characterized performance, composite sorbent pellets each consisting of an inert core coated by a thin layer of the functional perovskite material were produced. Several low-density, inexpensive inert solids supports in the 1/8”-1/4” size were selected to keep the pressure drop across the sorbent bed in the acceptable range. A number of commercial technologies including spray coating, dip coating, incipient impregnation of porous substrate followed by thermal annealing at various temperatures and duration were employed and tested to produce robust composite supported sorbent pellets. A sense of optimum coating thickness was developed by testing sorbent pellets of various increasing diameter pellets. LSCF-1991extrudates ranging in size from 1/32” to 3/16” were tested in a TGA and in a fixed-bed pressure swing test set-up for sorption/desorption cycles of interest. The data show that for the operational conditions of interest the coating thickness for a supported sorbent pellet needs to be approximately 1/32” (about 0.8 mm). Subsequent work thereby concentrated on developing composite pellets of various substrates, shapes and sizes with coating layer of about this size range. Candidate support materials were chosen based on cost, inertness, mechanical strength, thermal expansion and chemical stability with sorbent material, and in a size range to give an acceptable pressure drop in fixed-bad reactor configurations. Coating application methods used for application of the sorbent onto the support included precipitation, spray coating and dip coating from sorbent slurries and sol gels. For all coated supports where we could successfully apply a uniform coating of desired thickness with an acceptable handling performance in terms of exfoliation, TGA-based cyclic sorption/desorption testing was performed to determine cycling capacity of oxygen. Among nearly twenty different support materials tested, best adhesion performance was obtained from stainless saddle supports. In the bench-scale fixed-bad tests stainless steel saddle support composite pellets with a coating thickness in the 0.6 mm or so range, the composite sorbent pellet performance approached up to 95% of that of the 2 mm parent material pellets. In a parallel approach to reducing the cost of the sorbent, alternate sorbent formulations replacing/reducing the amount of cobalt in the LSCF family were also investigated. Successful formulations that could match the performance of LSCF 1991 were identified based on TGA cyclic tests as LSCF 1919 and LSF 1910. In the range of operational envelop of cycle times and other relevant process operating conditions, the reduced Co formulations showed comparable performance in the bench-scale fixed-bad cyclic operations. As a part of this project, we also attempted substitution of La and Sr with Ca and Ba, and Co with Mn, Ni and Cu with little success, but the overall project goal of reducing sorbent cost in terms of raw material and manufacturing expenses was successful.

01 COAL, LIGNITE, AND PEAT↗