Search NASA⌕ Search

SEARCH · Search NASA

Results for “Draft Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

226 records · Page 13

Phylogenomic insights into the taxonomy, ecology, and mating systems of the lorchel family Discinaceae (Pezizales, Ascomycota)

Lorchels, also known as false morels (Gyromitra sensu lato), are iconic due to their brain-shaped mushrooms and production of gyromitrin, a deadly mycotoxin. Molecular phylogenetic studies have hitherto failed to resolve deep-branching relationships in the lorchel family, Discinaceae, hampering our ability to settle longstanding taxonomic debates and to reconstruct the evolution of toxin production. We generated 75 draft genomes from cultures and ascomata (some collected as early as 1960), conducted phylogenomic analyses using 1542 single-copy orthologs to infer the early evolutionary history of lorchels, and identified genomic signatures of trophic mode and mating-type loci to better understand lorchel ecology and reproductive biology. Our phylogenomic tree was supported by high gene tree concordance, facilitating taxonomic revisions in Discinaceae. We recognized 10 genera across two tribes: tribe Discineae (Discina, Maublancomyces, Neogyromitra, Piscidiscina, and Pseudodiscina) and tribe Gyromitreae (Gyromitra, Hydnotrya, Paragyromitra, Pseudorhizina, and Pseudoverpa); Piscidiscina was newly erected and 26 new combinations were formalized. Paradiscina melaleuca and Marcelleina donadinii formed their own family-level clade sister to Morchellaceae, which merits further taxonomic study. Genome size and CAZyme content were consistent with a mycorrhizal lifestyle for the truffle species (Hydnotrya spp.), whereas the other Discinaceae genera possessed genomic properties of a saprotrophic habit. Lorchels were found to be predominantly heterothallic-either MAT1-1 or MAT1-2-but a single occurrence of colocalized mating-type idiomorphs indicative of homothallism was observed in Gyromitra esculenta strain CBS101906 and requires additional confirmation and follow-up study. Lastly, we confirmed that gyromitrin has a phylogenetically discontinuous distribution, having been detected exclusively in two distantly related genera (Gyromitra and Piscidiscina) belonging to separate tribes. Our genomic dataset will facilitate further investigations into the gyromitrin biosynthesis genes and their evolutionary history. With additional sampling of Geomoriaceae and Helvellaceae-two closely related families with no publicly available genomes-these data will enable comprehensive studies on the independent evolution of truffles and ecological diversification in an economically important group of pezizalean fungi.

Dirks, Alden C↗

An overview of SAFENET and its implications for aerospace applications

The survivable, adaptable fiber optic embeddable network (SAFENET) is a draft standard for local area networking (LAN) developed by the Navy which, when adopted, will become a military standard. The standard is being developed for procurement specifications of computer resources to be used on ships and aircraft and has some of the real-time concerns that network standards for space vehicles have. Architecture and survivability are considered. It is noted that the token-ring LAN must implement the IEEE 802.5 recommended practice for dual ring reconfiguration, which is currently being reviewed for inclusion into the IEEE standard. A trunk coupling unit is used at each station to isolate a station from the ring in case of failure. Up to five stations can be bypassed in this fashion. Communication architecture has an OSI profile but differs from the standard concept of the seven layers by allowing alternate suits and breaking the layers into three groupings of services to allow for physical interfacing. It also provides several paths, even if only one profile is used. Management and synchronization protocols are discussed and security issues are addressed. Implications for aerospace applications are considered and it is projected that interoperability with the Navy and other U.S. Government systems may require SAFENET specifications for NASA systems.

Collins, George C.↗

Refinement of Protocols for Measuring the Apparent Optical Properties of Seawater

Ocean color satellite missions, like the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) or the Moderate Resolution Imaging Spectroradiometer (MODIS) projects, are tasked with acquiring a global ocean color data set, validating and monitoring the accuracy and quality of the data, processing the radiometric data into geophysical units using a set of atmospheric and bio-optical algorithms, and distributing the final products to the scientific community. The long-standing requirement of the SeaWiFS Project, for example, is to produce spectral water-leaving radiances, LW(lambda), to within 5% absolute (lambda denotes wavelength) and chlorophyll a concentrations to within 35% (Hooker and Esaias 1993), and most ocean color sensors have the same or similar requirements. Although a diverse set of activities are required to ensure the accuracy requirements are met (Hooker and McClain 2000), the perspective here is with field observations. The accurate determination of upper ocean apparent optical properties (AOPs) is essential for the vicarious calibration of ocean color data and the validation of the derived data products, because the sea-truth measurements are used to evaluate the satellite observations (Hooker and McClain 2000). The uncertainties with in situ AOP measurements have various sources: a) the sampling procedures used in the field, including the environmental conditions encountered; b) the absolute characterization of the radiometers in the laboratory; c) the conversion of the light signals to geophysical units in a processing scheme, and d) the stability of the radiometers in the harsh environment they are subjected to during transport and use. Assuming ideal environmental conditions, so this aspect can be neglected, the SeaWiFS ground-truth uncertainty budget can only be satisfied if each uncertainty is on the order of 1-2%, or what is generally referred to as 1% radiometry. In recent years, progress has been made in estimating the magnitude of some of these uncertainties and in defining procedures for minimizing them. For the SeaWiFS Project, the first step was to convene a workshop to draft the SeaWiFS Ocean Optics Protocols (hereafter referred to as the Protocols). The Protocols initially adhered to the Joint Global Ocean Flux Study (JGOFS) sampling procedures (JGOFS 1991) and defined the standards for optical measurements to be used in SeaWiFS calibration and validation activities (Mueller and Austin 1992). Over time, the Protocols were revised (Mueller and Austin 1995), and then recurringly updated on essentially an annual basis (Mueller 2000, 2002, and 2003) as part of the Sensor Inter-comparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) project. 98

Hooker, Stanford B.↗

Lessons Learned from Applying Design Thinking in a NASA Rapid Design Study in Aeronautics

In late 2015, NASA's Aeronautics Research Mission Directorate (ARMD) funded an experiment in rapid design and rapid teaming to explore new approaches to solving challenging design problems in aeronautics in an effort to cultivate and foster innovation. This report summarizes several lessons learned from the rapid design portion of the study. This effort entailed learning and applying design thinking, a human-centered design approach, to complete the conceptual design for an open-ended design challenge within six months. The design challenge focused on creating a capability to advance experimental testing of autonomous aeronautics systems, an area of great interest to NASA, the US government as a whole, and an entire ecosystem of users and developers around the globe. A team of nine civil servant researchers from three of NASA's aeronautics field centers with backgrounds in several disciplines was assembled and rapidly trained in design thinking under the guidance of the innovation and design firm IDEO. The design thinking process, while used extensively outside the aerospace industry, is less common and even counter to many practices within the aerospace industry. In this report, several contrasts between common aerospace research and development practices and design thinking are discussed, drawing upon the lessons learned from the NASA rapid design study. The lessons discussed included working towards a design solution without a set of detailed design requirements, which may not be practical or even feasible for management to ascertain for complex, challenging problems. This approach allowed for the possibility of redesigning the original problem statement to better meet the needs of the users. Another lesson learned was to approach problems holistically from the perspective of the needs of individuals that may be affected by advances in topic area instead of purely from a technological feasibility viewpoint. The interdisciplinary nature of the design team also provided valuable experience by allowing team members from different technological backgrounds to work side-by-side instead of dividing into smaller teams, as is frequently done in traditional multidisciplinary design. The team also learned how to work with qualitative data obtained primarily through the 70-plus interviews that were conducted over the course of this project, which was a sharp contrast to using quantitative data with regards to identifying, capturing, analyzing, storing, and recalling the data. When identifying potential interviewees who may have useful contributions to the design subject area, the team found great value in talking to non-traditional users and potential beneficiaries of autonomous aeronautics systems whose impact on the aeronautics autonomy ecosystem is growing swiftly. Finally, the team benefitted from using "sacrificial prototyping," which is a method of rapidly prototyping draft concepts and ideas with the intent of enabling potential users to provide significant feedback early in the design process. This contrasts the more common approach of using expensive prototypes that focus on demonstrating technical feasibility. The unique design approach and lessons learned by the team throughout this process culminated in a final design concept that was quite different than what the team originally assumed would be the design concept initially. A summary of the more usercentered final design concept is also provided.

McGowan, Anna-Maria↗

Concept of Operations for OSIRIS-REx Optical Navigation Image Planning

Optical navigation (OpNav) is a critical subsystem of the OSIRIS-REx asteroid sample return mission, which operated in the vicinity of near-Earth asteroid (101955) Bennu from August 2018 through April 2021. A substantial amount of mission resources across multiple subsystems and institutions is required to ensure that the OpNav data are successfully acquired. The KinetX OpNav team, part of the Flight Dynamics System (FDS), is responsible for performing required analysis to develop the OpNav operations plans; requesting, reviewing and verifying the plans; and ultimately using the image data for critical navigation operations. The FDS team, responsible for the mission navigation, is operated by KinetX Aerospace with management and operations support from NASA’s Goddard Space Flight Center. The Science Processing and Operations Center (SPOC), located at the University of Arizona’s Lunar and Planetary Laboratory, is responsible for generating the planning products for all science and most OpNav data. These plans are integrated into the spacecraft sequences, tested, and commanded by the Mission Support Area (MSA) at Lockheed Martin Space. To ensure mission-critical navigation image data are successfully acquired, the plan is developed through a waterfall of planning cycles over the course of 3 months prior to onboard plan execution. During the initial strategic planning for a mission phase, detailed analysis is performed by the OpNav team to conceptualize the concept of operations (ConOps) for image data collection. This phase OpNav Narrative is included along with other strategic planning documents for the key ground segment stakeholders to review and provide feedback. The detailed OpNav plans get defined in the tactical planning cycle, which spans 8 to 3 weeks before the week-long integrated sequence is executed on-board the spacecraft. During the tactical cycle, the initial OpNav Request is submitted along with the science requests, kicking off development of the science and OpNav plans. Once the initial plan is drafted, interfaces are exercised so that the plan can be reviewed and iterated, if necessary. A rigorous schedule is followed by the planning teams during the implementation cycle, spanning the last 18 days before uplink, to ensure all the necessary integration, testing, and reviewing can occur on time. The development of the OpNav planning ConOps, including responsibilities, interfaces, timelines, and procedures, took extensive collaboration across mission elements and institutions. The process was robust throughout the 137 weeks of continuous Optical Navigation Operations at Bennu, which concluded on April 9th, 2021.

Coralie D. Adam↗

DiskSat: Demonstration Mission for a Two-Dimensional Satellite Architecture

The DiskSat is a quasi-two-dimensional satellite bus architecture designed for applications requiring high power, large apertures, and/or high maneuverability in a low-mass satellite. A representative DiskSat structure is a composite flat panel, one meter in diameter and 2.5 cm thick. The volume is almost 20 liters, equivalent to a hypothetical 20U CubeSat, while the structural mass is less than 3 kg. The surface area is large enough to host over 200 W of solar cells without deployable solar panels. For launch, multiple DiskSats are stacked in a fully enclosed container/deployer using a simple mechanical interface and are released individually in orbit. The Aerospace Corporation, with the support of the NASA Space Technology Mission Directorate (STMD), is preparing a flight of four DiskSats for launch in 2024 to demonstrate the feasibility of both the dispenser and the DiskSat bus. In addition, the flight is expected to demonstrate several features of the DiskSat including the unprecedented high power-to-mass ratio, the maneuverability of the bus using low-thrust electric propulsion, and the ability to fly continuously in a low-drag orientation, enabling operations in very low Earth orbits (VLEO). The DiskSats will be launched in and deployed from a dispenser that provides a containerized rideshare environment; the dispenser fully encloses the DiskSats during launch and then opens to dispense the satellites one at a time once in orbit. The dispenser is modular in design and expandable from the capacity of four DiskSats for this flight to as many as 20 DiskSats for future flights. NASA STMD seeks disruptive and innovative technologies that could help lead to the next-generation systems for future science and exploration missions. DiskSat is a potentially disruptive technology leading to new, enabling architectures using ever-more capable small spacecraft. Data generated from this flight will inform the drafting of a DiskSat standard intended to encourage easy and frequent access to space, in the same manner as the CubeSat standard. DiskSat is expected to become a standard format for rideshare-compatible, high-power, maneuverable, low-mass satellites for Earth-orbit, cis-lunar, and deep space applications.

Richard Welle↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA-DoD Lead-Free Electronics Project. DRAFT Joint Test Report

The use of conventional tin-lead (SnPb) in circuit board manufacturing is under ever-increasing political scrutiny due to increasing regulations concerning lead. The "Restriction of Hazardous Substances" (RoHS) directive enacted by the European Union (EU) and a pact between the United States National Electronics Manufacturing Initiative (NEMI), Europe's Soldertec at Tin Technology Ltd. and the Japan Electronics and Information Technology Industries Association (JEITA) are just two examples where worldwide legislative actions and partnerships/agreements are affecting the electronics industry. As a result, many global commercial-grade electronic component suppliers are initiating efforts to transition to lead-free (Pb-free) in order to retain their worldwide market. Pb-free components are likely to find their way into the inventory of aerospace or military assembly processes under current government acquisition reform initiatives. Inventories "contaminated" by Pb-free will result in increased risks associated with the manufacturing, product reliability, and subsequent repair of aerospace and military electronic systems. Although electronics for military and aerospace applications are not included in the RoHS legislation, engineers are beginning to find that the commercial industry's move towards RoHS compliance has affected their supply chain and changed their parts. Most parts suppliers plan to phase out their non-compliant, leaded production and many have already done so. As a result, the ability to find leaded components is getting harder and harder. Some buyers are now attempting to acquire the remaining SnPb inventory, if it's not already obsolete. Original Equipment Manufacturers (OEMs), depots, and support contractors have to be prepared to deal with an electronics supply chain that increasingly provides more and more parts with Pb-free finishes-some labeled no differently than their Pb counterparts-while at the same time providing the traditional Pb parts. The longer the transition period, the greater the likelihood of Pb-free parts inadvertently being mixed with Pb parts and ending up on what are supposed to be Pb systems. As a result, OEMs, depots, and support contractors need to take action now to either abate the influx of Pb-free parts, or accept it and deal with the likely interim consequences of reduced reliability due to a wide variety of matters, such as Pb contamination, high temperature incompatibility, and tin whiskering. Allowance of Pb-free components produces one of the greatest risks to the reliability of a weapon system. This is due to new and poorly understood failure mechanisms, as well as unknown long-term reliability. If the decision is made to consciously allow Pb-free solder and component finishes into SnPb electronics, additional effort (and cost) will be required to make the significant number of changes to drawings and task order procedures. This project is a follow-on effort to the Joint Council on Aging Aircraft/Joint Group on Pollution Prevention (JCAA/JG-PP) Pb-free Solder Project which was the first group to test the reliability of Pb-free solder joints against the requirements of the aerospace and military community.

Kessel, Kurt↗

Commercial Smallsat Data Acquisition Program: Airbus U.S. Synthetic Aperture Radar Quality Assessment Summary

Quality assessment of the Airbus X-band Synthetic Aperture Radar (SAR) satellite products was conducted by the Commercial Smallsat Data Acquisition (CSDA) program’s radar subject matter experts, following the Joint NASA/ESA (European Space Agency) assessment draft guidelines. All three Airbus SAR spacecraft (TerraSAR-X, TanDEM-X, and PAZ) are based on the TerraSAR-X platform, and each have an active phased array antenna that is 4.8 x 0.7 m in the along-track and cross-track dimensions, respectively. TerraSAR-X and TanDEM-X are in a helical orbit, creating a bistatic imaging geometry, in addition to being capable of independent monostatic observations. The PAZ mission follows TerraSAR-X and TanDEM-X in the same 11-day orbit with a 5.5-day lag. TerraSAR-X and TanDEM-X are designed, developed, and operated through a Public-Private Partnership, while PAZ is a dual-use mission (civil and defense agencies), funded and owned by the Spanish Ministry of Defense and managed by Hisdesat (Hisdesat Servicios Estratégicos, S.A.), a Spanish private communications company. The assessment presented in this document is divided into two main parts: documentation review and the assessment of test datasets. The documentation review in sections 2.1 through 2.4 includes the assessment of the Airbus documentation provided to the CSDA evaluation team. The grading of these documents is given in columns 1-4 of the maturity matrix shown in section 1.1. Section 2.5 summarizes the evaluation performed by NASA using the data purchased through the CSDA program. The grading for this is given in the last column of the maturity matrix. Section 3 provides more detailed explanations on the methods and the results of the data analysis performed by NASA. Only the documents provided by Airbus for the evaluation were considered for the review. Additional documentation with more detailed description of the calibration and validation procedures may be available online but were not considered for this evaluation. The product information provided in the available documentation (RD-1, RD-2) and the product metadata together provided adequate information to work with the data. The product details in the metadata included the required information to work with the data in the common XML file format. Metrological traceability documentation was not provided to CSDA. All relevant characterization of the SAR system and data were provided, and the metadata include all relevant ancillary information. Documentation provided to CSDA included limited pre-flight and post-launch calibration information.

Batuhan Osmanoglu↗

Overview of Dragonfly Entry Aerosciences Measurements (DrEAM)

NASA Ames Research Center (ARC) leads the Dragonfly Entry Aerosciences Measurements (DrEAM) project, which is an aeroshell instrumentation suite on the Dragonfly mission that fulfills the Engineering Science Investigation requirement for the New Frontiers mission. NASA ARC is partnering with NASA Langley Research Center (LaRC) and the German Aerospace Center (DLR) to provide a comprehensive sensor suite, including a DLR-provided Data Acquisition System (DAS). DrEAM will provide key aerothermodynamic data and performance analysis for Dragonfly’s forebody and backshell Thermal Protection System (TPS). Titan’s atmosphere predominantly consists of ni-trogen (~98% by mole) with small amounts of me-thane (~2% by mole) and other trace gases. CN is a strong radiator, and is found in nonequilibrium con-centrations for Titan entry. The accurate modeling of nonequilibrium CN radiation has proven to be a diffi-cult task. Prompted by the Huygens mission, many experimental campaigns and analyses were performed to better understand the aerothermal environments experienced by the probe during Titan entry [1]. How-ever, the Huygens probe carried no heatshield instru-mentation. Therefore, the DrEAM sensor suite will sig-nificantly advance the state-of-the-art not only by documenting the environment and performance of Dragonfly’s entry system but also by making key in situ measurements in Titan’s atmosphere for the first time. Aerothermal environments and TPS response will be measured using sensors whose flight heritage is tak-en from the Mars Entry, Descent, and Landing In-strumentation 2 (MEDLI2) thermocouple plugs and the COMbined Aerothermal and Radiometer Sensor (COMARS) suite [2], with the latter supplied by DLR. The MEDLI2 project used embedded thermocouples to directly measure the in-depth TPS temperature-time history at several locations on the heat shield and backshell of the Mars 2020 entry vehicle. These tem-perature measurements, in turn, can be used to infer surface environments via an inverse analysis proce-dure analogous to that used for MEDLI. For DrEAM, the thermocouple plug subsystem will be known as Dragonfly Sensors for Aero-Thermal Reconstruction (DragSTR). On Schiaparelli, the COMARS suite in-cluded three total surface-mounted heat flux sensors, three pressure sensors, and one radiometer. For DrEAM, the COMARS package will be known as the COmbined Sensor System for Titan Atmosphere (COSSTA). Since the methane concentration in the Titan atmos-phere is directly proportional to the radiative heat flux, the COSSTA measurements will be used to reduce the current uncertainty in the methane volume fraction. Atmospheric density measurements and capsule aero-dynamic data will be obtained through the onboard Inertial Measurement Unit (IMU), supplemented by pressure transducers similar to those used by the MEDLI and MEDLI2 projects. The DrEAM pressure sensors will be known as the Dragonfly Atmospheric Flight Transducers. (DrAFT). The pressure measure-ments, when combined with data from the on-board IMU, will allow for reconstruction of such quantities as vehicle Mach number, freestream density, and atmos-pheric winds. DrAFT measurements will enhance Dragonfly trajectory reconstruction and enable a sepa-ration of the aerodynamics from the atmosphere, as was done for MEDLI [3] and is currently in process for the MEDLI2 flight data set.

EDL↗