Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

EVSE Cybersecurity and Resilience

Consequence-driven Cybersecurity Analysis for Extreme Fast Charging Electric Vehicle Infrastructure Electric vehicle (EV) development and associated charging infrastructure are expected to advance rapidly. Thirty percent of all global vehicle sales may be EVs and hybrid EVs by 2025, and they will rely on increasingly sophisticated strategies for grid integration. Next-generation EV charging infrastructure is expected to include interconnected renewable resources, such as photovoltaic (PV) arrays and battery storage systems, along with grid-edge devices. Although distributed energy resources (DERs) are useful in several ways, such as peak shaving at high demand times and backup supply for added resilience, the integration of vehicle charging and DERs could create more avenues for cyberattack. Physical and/or remote access to EV charging station components, including charge ports, power electronics, controllers, and local generation (e.g., PV and energy storage) could be paths to cause power fluctuations, leading to altered operations at the charging station, escalated privileges to administrative systems, exfiltration of financial information (including personally identifiable information), and reduced grid stability. One compromised EV supply equipment component can open the door to a variety of exploitable vulnerabilities. Cloud computing and mobile application control have the potential to expand the threat surface to non-repudiation and firmware integrity challenges. Vendor clouds have access to hundreds of chargers, and if compromised, can scale the attack surface exponentially. The high power and voltage levels of xFC infrastructure (e.g., 400 kW at 1000- V DC) increase the hazards and ability to impact the grid and vehicles more than lower-power charging systems. Legacy communications systems and protocols could also put EV infrastructure at risk of cyberattacks requiring a robust patch management process. Communications networks link EVs and chargers to several stakeholders - including charging station operators, grid operators, vendors/manufacturers, and aggregators - who have both physical and network access to share information for control, monitoring, and analytics. Information in these networks that is vulnerable to compromise includes the state of charge, charging duration, payment information, electricity price, and load control. Analyzing and prioritizing these interconnections risks could help address cybersecurity related to data leakage and manipulation.

charging↗

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

Fault Contribution of Grid-Following and Grid-Forming Inverters Considering Generic Inverter Controls and Ride-through Requirements

Gradual transformation of the synchronous generator (SG)-dominated power systems to inverter-based resource (IBR)-dominated power systems is bringing new challenges regarding power system protection. Increasing IBR’s penetration will reduce the reliability of protection coordination, originally developed for SG-dominated power systems, potentially leading to less accurate calculation or even mis-operation. Thus, new protection schemes compatible with IBR-dominated power systems should be established. Prior to establishing the protection schemes, research on the fault contribution of generic IBR models should be conducted considering interconnection requirements. This paper conducts fault current contribution analysis of generic grid-following (GFL) and grid-forming (GFM) inverters considering interconnection requirements using an electromagnetic transient (EMT) simulation tool. To do this, EMT-based generic GFL models have been developed with the ride-through requirements from IEEE-1547 standards. In addition, the major functions of the generic models are explained. Then, the fault current analysis was conducted using GFL and GFM inverters in a single-inverter-infinite-bus system and a modified IEEE 34-node system considering different grid, fault, inverter control parameters.

Kim, Jinho [BATTELLE (PACIFIC NW LAB)]↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Power grid frequency prediction using spatiotemporal modeling

Understanding power system dynamics is essential for interarea oscillation analysis and the detection of grid instabilities. The FNET/GridEye is a GPS-synchronized wide-area frequency measurement network that provides an accurate picture of the normal real-time operational condition of the power system-dynamics, giving rise to new and intricate spatiotemporal patterns of power loads. We propose to model FNET/GridEye grid frequency data from the U.S. Eastern Interconnection with a spatiotemporal statistical model. We predict the frequency data at locations without observations, a critical need during disruption events where measurement data are inaccessible. Spatial information is accounted for either as neighboring measurements in the form of covariates or with a spatiotemporal correlation model captured by a latent Gaussian field. Finally, the proposed method is useful in estimating power system dynamic response from limited phasor measurements and holds promise for predicting instability that may lead to undesirable effects such as cascading outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Antigua and Barbuda Distributed Energy Resources Deployment Guidelines

This document is designed to provide comprehensive considerations, best practices and guidance for deployment of Distributed Energy Resources (DERs) in Antigua and Barbuda. The document provides lists of various technology selection guidance including technical specifications, requirements and applicable key standards and code associated with key DERs and balance of plant equipment. The document also presents the key microgrid design considerations to integrate the DERs to achieve the economic, decarbonization and resiliency goals. Taking into account sensitive grid for such islands, for grid readiness and screening the potential DER interconnection, general approach is highlighted along with the potential technical interconnection requirements. Furthermore, this document shows the key stakeholders involved in such DER integration and/or microgrid project and how key responsible project team can be qualified. Finally, this document refers to key information about warranties and consumer rights and maintenance of the systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Comparative Analysis of Inter-Area Oscillations in the US Eastern and Western Interconnections

This paper presents a comparative analysis of interarea oscillations in the US Eastern and Western Interconnections using frequency disturbance data collected from the advanced wide-area Frequency Monitoring Network (FNET/GridEye), enabling us to investigate and compare the oscillation characteristics of both regions. The study analyzes the statistical data from the two interconnections, including total oscillation events, average dominant frequencies, damping ratios, and maximum amplitudes. We also explore the impact of seasonal and daily variations on oscillation occurrences and the influence of different grid topologies and operational practices. The results provide insights into both interconnections' stability and control characteristics, offering valuable information for power system operators to enhance grid stability and oscillation suppression measures.

Fu, Hao [University of Tennessee, Knoxville (UTK)]↗

Multi-Port Autonomous Reconfigurable Solar Power Plant

As the penetration level of power electronics increases and remote photovoltaic (PV) generation is integrated into the alternating current (ac) grid, the short-circuit ratio (SCR) at the point of interconnection of a hybrid PV–energy storage system (ESS) plant may be low. Additionally, the inertia of the alternating current (ac) grid may be low. The low SCRs and inertias can lead to reliability challenges in the power grid. These operating conditions require additional reinforcements, such as synchronous condensers, static var compensators, static synchronous compensators, and high-voltage direct current (HVdc) links/grids. HVdc links or grids may also provide the additional capability of connecting the plant to asynchronous grids and/or connecting asynchronous grids, among others. This scenario leads to discrete development of solar inverters, energy storage inverters, HVdc converters, and several transformers. Some of the problems associated with this discrete development and inverter-based generation include increased cost, lower reliability, and reduced efficiency associated with duplication of power electronics (PEs); competing controls of several individual discrete inverter-based generators due to the presence of multiple PEs, which leads to derating of the system; and transient stability problems arising from inverter-based generation, such as voltage/frequency events leading inverter shutdowns, voltage instability and control interactions in the formed weak grid, and harmonics caused by resonances of multiple inverters.

14 SOLAR ENERGY↗

Hardware Design of Medium Voltage SiC-Based Modular Multilevel Converters for Grid-Tied Applications

This paper presents a design of a 10 kV silicon carbide (SiC) MOSFET based modular multilevel converter (MMC). The MMC functions as the interconnection between a 24 kV dc bus and a 13. SkV distribution grid. This paper focuses on the hardware design of the MMC and its submodules. The gate driver, auxiliary power supply and bus bur in submodules are major components that need to meet high dv/dt immunity and high insulation voltage requirements. The gate driver achieves over 200 kV/us common mode transient immunity (CMTI). Its associated auxiliary power supply is based on an on-board transformer with over 30 kV insulation capability and 1.4 pF barrier capacitance. The busbar achieves less than 11 kV/cm electric field in the air to avoid partial discharges. Validation tests of the MMC submodule were performed by double pulse tests at 5 kV and buck converter tests at3 kV, 52A (peak). Reliable operations were achieved in validation tests.

auxiliary power supply↗

Coplanar back contacts for thin silicon solar cells

The type of coplanar back contact solar cell described was constructed with interdigitated n(+) and p(+) type regions on the back of the cell, such that both contacts are made on the back with no metallization grid on the front. This cell construction has several potential advantages over conventional cells for space use namely, convenience of interconnects, lower operating temperatures and higher efficiency due to the elimination of grid shadowing. However, the processing is more complex, and the cell is inherently more radiation sensitive. The latter problem can be reduced substantially by making the cells very thin (approximately 50 micrometers). Two types of interdigitated back contact cells are possible, the types being dependent on the character of the front surface. The front surface field cell has a front surface region that is of the same conductivity type as the bulk but is more heavily doped. This creates an electric field at the surface which repels the minority carriers. The tandem junction cell has a front surface region of a conductivity type that is opposite to that of the bulk. The junction thus created floats to open circuit voltage on illumination and injects carriers into the bulk which then can be collected at the rear junction. For space use, the front surface field cell is potentially more radiation resistant than the tandem junction cell because the flow of minority carriers (electrons) into the bulk will be less sensitive to the production of recombination centers, particularly in the space charge region at the front surface.

Storti, G.↗

Key Performance Indicators for Vehicle Grid Integration

Electric vehicle (EV) sales account for a rapidly growing portion of the light-duty vehicle market and a portion of medium and heavy-duty fleet vehicles. However, in many locations, charging stations will require costly utility grid upgrades with long lead times. Today, there are a few methods of smart charge management (SCM) which can reduce the costs and wait times for electric vehicle supply equipment (EVSE) interconnection approvals, as well as reduce impacts of the charging stations on the grid and on EV driver transportation costs. It is crucial for the EV charging industry to understand the vehicle grid integration (VGI) requirements for EVSE to prevent adverse impacts from EVSE interconnections and assure that charging loads and interconnections are affordable.

33 - ADVANCED PROPULSION SYSTEMS↗

Inertia estimation for power grids: A review of methods, challenges, and future prospects

The electric power grid is undergoing a significant transformation, shifting from traditional synchronous generators to inverter-based resources (IBRs) such as solar photovoltaics, wind turbines, and energy storage systems. This evolution leads to a reduction in system inertia, a critical attribute for maintaining frequency stability in response to disturbances. Consequently, the ability to monitor and estimate system inertia has become increasingly essential. This paper provides a comprehensive review of existing inertia estimation methodologies, analyzing them from multiple perspectives, including the types of data utilized, underlying estimation principles, operational modes, and system-wide applicability. A comparative summary table is included to distill commonalities and key characteristics across various studies. In addition, the paper examines practical implementations of inertia estimation across several major power systems worldwide, including the U.S. interconnections, the Nordic power system, and the U.K. grid. Key challenges are identified, particularly in estimating contributions from virtual inertia sources and load-induced inertia in increasingly converter-dominated networks. To address these emerging challenges, the paper proposes an integrated framework for real-time inertia estimation and monitoring. This framework encompasses critical components such as data acquisition, inertia estimation from both synchronous and non-synchronous sources, load-induced effects, optimization techniques, forecasting, and virtual inertia scheduling. Collectively, these elements enable dynamic, system-wide monitoring and adaptive control of grid inertia.

Inertia estimation↗

Analyzing the Effects of Cyberattacks on Distribution System State Estimation

Key components of power systems—such as energy management systems, automatic generation control, and state estimation—are under serious vulnerability from cyberattacks. Cyber threats in electric grids have increased significantly because of the increased interconnectivity of supervisory control and data acquisition systems and public network infrastructure. As the penetration level of distributed energy resources increases, it is imperative to employ system-monitoring techniques such as state estimation for the reliable operation of distribution systems. Recently, multiple methods have been developed that exploit the low rank property of distribution system state matrix and are robust to bad data, such as matrix completion. This paper analyzes the impact of various realistic cyberattack scenarios on matrix completion. Realistic cyberattack scenarios are converted into data corruption models that are used in an extensive simulation of a custom IEEE 123-bus system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Analyzing the Effects of Cyberattacks on Distribution System State Estimation: Preprint

Key components of power systems—such as energy management systems, automatic generation control, and state estimation—are under serious vulnerability from cyber attacks. Cyber threats in electric grids have increased significantly because of the increased interconnectivity of supervisory control and data acquisition systems and public network infrastructure. As the penetration level of distributed energy resources increases, it is imperative to employ system-monitoring techniques such as state estimation for the reliable operation of distribution systems. Recently, multiple methods have been developed that exploit the low rank property of distribution system state matrix and are robust to bad data, such as matrix completion. This paper analyzes the impact of various realistic cyber attack scenarios on matrix completion. Realistic cyber attack scenarios are converted into data corruption models that are used in an extensive simulation of a custom IEEE 123-bus system.

41 EE - Solar Energy Technologies Office (EE-4S)↗