Search NASA⌕ Search

SEARCH · Search NASA

Results for “LEASING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Improved Wave Energy Production Forecasts for Smart Grid Integration

Integration of renewable power sources into electrical grids remains an active research and development area, particularly for less developed renewable energy technologies, such as wave energy converters (WECs). High spatio-temporal resolution and accurate wave forecasts at a potential WEC (or WEC array) lease area are needed to improve WEC power prediction and to facilitate grid integration, particularly for microgrid locations. The availability of high quality measurement data from recently developed low-cost buoys allows for operational assimilation of wave data into forecast models at remote locations where real-time data have previously been unavailable. This work includes the development and assessment of a wave modeling framework with real-time data assimilation capabilities for WEC power prediction. Spoondrift wave measurement buoys were deployed off the coast of Yakutat, Alaska, a microgrid site with high wave energy resource potential. A wave modeling framework with data assimilation was developed and assessed, which was most effective when the incoming forecasted boundary conditions did not represent the observations well. For that case, assimilation of the wave height data using the ensemble Kalman filter resulted in a reduction of wave height forecast normalized root mean square error from 27% to an average of 16% over a 12-hour period. This results in reduction of wave power forecast error from 73% to 43%. In summary, the use of the low-cost wave buoy data assimilated into the wave modeling framework improved the forecast skill and will provide a useful development tool for the integration of WECs into electrical grids.

16 TIDAL AND WAVE POWER↗

Energy Efficiency and the Real Estate Lifecycle: Stakeholder Perspectives

This report characterizes opportunities and pitfalls for leveraging key building lifecycle “events” as intervention points to enhance energy efficiency in real estate portfolios. It is based primarily on 33 interviews conducted with key industry stakeholders, including commercial real estate owners, operators, tenants, investors, developers, vendors, architecture/engineering firms, and construction managers. We focus on the following key events in the real estate life cycle because they are likely to present an opportunity for energy efficiency improvements: a) purchase or sale of a property; b) renovation; c) major equipment replacement; d) lease turnover or renewal; and e) refinancing. The stakeholder interviews covered business roles and processes, priorities, and sensitivities in these commercial real estate events.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Groundwater Potability Determination Report for Sylvan Grove, Kansas

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility from 1954 to 1966 at the northeastern edge of Sylvan Grove, Kansas (Figures 1.1 and 1.2). During this time, commercial grain fumigants containing carbon tetrachloride were in common use to preserve grain in storage. The CCC/USDA is in the process of preparing a Corrective Action Study (CAS) to address carbon tetrachloride contamination in groundwater on the portion of the site that it formerly leased and operated. As stated in the Kansas Department of Health and Environment (KDHE) Bureau of Environmental Remediation (BER) policy BER-RS-045 (KDHE 2016), Considerations for Groundwater Potability and Use Determinations (hereafter referred to as “Potability Determination Guidance”), the KDHE considers all groundwater to be a potential source of potable water. This report, however, substantiates that groundwater resources in the Cretaceous Dakota Formation—more specifically, that localized portions of water bearing strata affected by operations at the former CCC/USDA site—are non-potable. The purpose of this report, therefore, is to provide additional information to support the KDHE’s decision-making process with regard to the disposition and closure of the Sylvan Grove site. Per the Potability Determination Guidance the results of this potability evaluation will play a role in selecting the site remedial action objectives and the overall proposed path for long-term management. This report presents the data and analyses of the potability study and the results of the potability determination, which will be taken into consideration during the development of cleanup goals for the CAS or for any other future remedial or long-term management action agreed to by the CCC/USDA and KDHE. The Potability Determination Guidance provides a framework to evaluate groundwater potability by outlining: The set of threshold criteria under which KDHE will consider an aquifer to be non-potable; The data and information necessary to evaluate potability; and, Considerations for long-term management of aquifers that are deemed non potable. According to the guidance, the KDHE may determine that groundwater is non-potable due to natural conditions such as water quality or quantity characteristics. As suggested in the guidance, this report will discuss the initial potability threshold screening for entering the evaluation process (Section 2); justify the work plan that was covered by the site investigation planning (also in Section 2); and present the relevant data and evaluation results (Sections 3-6).

54 ENVIRONMENTAL SCIENCES↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Roles and Responsibilities for Distribution Grids: DER Sensing and Communication Networks

Traditional distribution grids require sensing and communications for grid operations. In many cases the communications networks are owned by the Distribution Operator (DO); in some cases, carrier services such as leased telephone land lines or cellular services are used. In recent years, wireless mesh field area networks and optical fiber have become viable options for distribution. Fiber in particular has improved in cost to the point where its high performance (large bandwidth, low latency, and low packet loss) has become practical for distribution systems where geographic circumstances permit. As grid modernization proceeds, utilities find a need to improve or upgrade distribution communications; this represents a significant investment and it is natural that both utilities and regulators would seek both to future-proof and minimize their costs. Given the development and rising penetration of smart grid edge devices such as Distributed Energy Resources (DER) that have local sensing and intelligence and can communicate via the internet or other non-utility communications channels to cloud-based services, the idea of using such devices for grid sensing and communications to support grid operations has emerged as a potential means to avoid utility investment. To a great extent, however, these DER and communication channels will be owned and operated not by the DO but by end-use customers, aggregators and other third parties pursuing their own energy needs and business models. The question of whether such devices and systems can effectively substitute for DO grid modernization investment can be assessed and resolved using grid architecture methods and by considering the appropriate roles and responsibilities of the entities and systems involved in distribution grid operations. This approach reveals that there are several compelling reasons to dismiss the idea of eliminating DO owned and operated sensing and communication entirely and relying on DER-based sensing and third party communications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Benchmarking Utility-Scale PV Operational Expenses and Project Lifetimes: Results from a Survey of U.S. Solar Industry Professionals

This paper draws on a survey of solar industry professionals and other sources to clarify trends in the expected useful life and operational expenditure (OpEx) of utility-scale photovoltaic (PV) plants in the United States. Solar project developers, sponsors, long-term owners, and consultants have increased project-life assumptions over time, from an average of ~21.5 years in 2007 to ~32.5 years in 2019. Current assumptions range from 25 years to more than 35 years depending on the organization; 17 out of 19 organizations surveyed or reviewed use 30 years or more. Levelized, lifetime OpEx estimates have declined from an average of ~$\$$35/kW DC -yr for projects built in 2007 to an average of ~$\$$17/kW DC -yr in 2019. Across 13 sources, the range in average lifetime OpEx for projects built in 2019 is broad, from $\$$13 to $\$$25/kW DC -yr. Operations and maintenance (O&M) costs—one component of OpEx—have declined precipitously in recent years, to $\$$5-8/kW DC -yr in many cases. Property taxes and land lease costs are highly variable across sites, but on average are—together—of similar magnitude. Other OpEx line items include security, insurance, and asset management. Given 2007-2009 values for not only project life and OpEx but also other drivers of the levelized cost of energy (LCOE, excluding the investment tax credit), the LCOE for utility-scale PV projects built from 2007 through 2009 averaged $\$$305 /MWh. Using 2019 values for all parameters yields an average LCOE of $\$$51 /MWh. The decline in LCOE from $\$$305 /MWh to $\$$51 /MWh was predominantly caused by reductions in up-front expenditures (and, to a much lesser extent, by changes in capacity factors, financing costs, and tax rates), but 9% ($\$$22 /MWh) of the overall decline is due to improvements in project life and OpEx. Project life extensions and OpEx reductions have had similarly sized impacts on LCOE over this period, at $\$$11 /MWh each. Had project life and OpEx not improved over the last decade, LCOE in 2019 would have instead been $\$$73 /MWh—43% higher. Given the limited quantity and comparability of previously available data on these cost drivers, the data and trends presented here may inform assumptions used by electric system planners, modelers, and analysts. The results may also provide useful benchmarks to the solar industry, helping developers and assets owners compare their expectations for project life and OpEx with those of their peers.

14 SOLAR ENERGY↗

Development of an In-Situ Method for Cable Condition Monitoring in Nuclear Power Plants (SBIR Phase IIB Final Report)

This is the final report of a Small Business Innovation Research (SBIR) project that Analysis and Measurement Services Corporation (AMS) has conducted for the U.S. Department of Energy (DOE) over a seven-and-a-half year period (February 2013 through April 2020 with the awards of Phase I, Phase II and Phase IIB projects). The goal of the project was to design, develop, validate, and demonstrate a technique for in-situ testing of cable insulation polymers that will identify, locate, and provide the degree of aging for cables commonly used in nuclear power plants. During the Phase I project, AMS established that the frequency domain reflectometry (FDR) technique can successfully identify and measure cable insulation degradation that can be trended with aging. In Phase II, AMS performed extensive cable aging studies to correlate FDR measurements with other laboratory condition monitoring techniques and developed aging condition categories to quantify the severity of insulation degradation. In Phase IIB, the project expanded the research to include a wider variety of cable polymers that are used in the commercial nuclear power industry. This work also involved developing acceptance criteria to objectively assess age-related cable degradation while sharing the results of this research with industry, academia, and national laboratories to advance the state of the art in cable aging management technologies. The products developed under this research project provide the nuclear industry with an effective condition monitoring tool to support safe and long-term plant operation. Throughout the project, collaborations and support were received from a variety of industry organizations and individuals including DOE National Laboratories as well as nuclear plant utilities and several other industry experts and cable manufacturers. Contributions from these organizations included the donation of new cables, naturally aged cables, and research collaboration. The validation and commercialization of the products of this project were achieved through opportunities to test and demonstrate the technologies’ capabilities on-site at nuclear power generation and research facilities as well as in the laboratory alongside industry peers and cable testing service companies. The research resulted in a technology that can be used to identify, locate, and quantify age-related degradation in several types of cable polymers. This included developing software and hardware as well as the methodology for using the FDR technique to assess age-related degradation of installed cables. The technology developed under this project can provide nuclear plant management, engineers, and technicians with an in-situ electrical test method to determine if in-service cables need to be replaced, monitored on a periodic basis, or show no evidence of significant age-related degradation that may require action. Near the end of this Phase IIB project, the FDR product was sold to a nuclear power utility in South Korea. This sale of a dedicated aging assessment tool is the beginning of a comprehensive contract with the expectation of twelve (12) units sold to that country. Additionally, the FDR technology has been sold to several industry organizations including a nuclear research institute and the Diablo Canyon nuclear power plant. This technology is also being leased by other nuclear industry service companies for incorporation into aging management programs. The cable testing technology that was developed under this project was also integrated into a comprehensive cable aging assessment service that is being offered to the nuclear industry at the request of U.S. nuclear utilities and is currently part of onsite testing services provided by AMS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Distributed Solar Adoption in Orlando: A Household-Level Model for Distribution Resource Planning

Potential for rooftop solar in Florida is massive (47% of retail sales, 3rd overall nationally), yet adoption lags (12th nationally). A 2018 Florida Public Service Commission ruling authorizing solar third-party ownership (leasing) has substantially increased attention on distributed solar in the state. The city of Orlando has committed to a 100% clean-energy target by 2050 and deployment of solar and storage are expected to contribute significantly to reaching the goal. Deployment of customer-adopted solar, unlike utility-procured solar, is uncertain, but known to be spatially correlated with demographic factors and existing adoption. We develop a new method to adapt NREL's dGen model in order to represent building-level agents in adoption forecasts for the Orlando Utility Commission (OUC) service territory. Using the agent-based model we develop projections of solar adoption, subject to scenarios varying future solar costs and valuation, and aggregate adoption predictions by OUC distribution feeder. We find substantial spatial heterogeneity in the projected level of adoption by OUC distribution feeder. For instance, 25% of all projected adoption through 2050 would be concentrated on just 5% of feeders and 88% of projected adoption on 50% of feeders. Because of the uncertainty in adoption, bottoms-up solar adoption forecasting methods at the household-level are integral to long-term resource planning by anticipating system needs as customers increasingly adopt distributed solar, storage, electric vehicles, and other distributed energy resources.

14 SOLAR ENERGY↗

OWL Change Control Process

The Online Waste Library (OWL) provides a consolidated source of information on Department of Energy-managed radioactive waste likely to require deep geologic disposal. With the release of OWL Version 1.0 in fiscal year 2019 (FY2019), much of the FY2020 work involved developing the OWL change control process and the OWL release process. These two processes (in draft form) were put into use for OWL Version 2.0, which was released in early FY2021. With the knowledge gained, the OWL team refined and documented the two processes in two separate reports. This report focuses on the change control process and discusses the following: (1) definitions and system components; (2) roles and responsibilities; (3) origin of changes; (4) the change control process including the Change List, Task List, activity categories, implementation examples, and checking and review; and (5) the role of the re lease process in ensuring changes in the Change List are incorporated into a public release.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

SECARB-USA: Needs Assessment Framework for Storage Complexes (Task 2.1.b)

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization. Results show that the total cost of characterization prior to obtaining a permit is convergent, because the permit and modeling requirements drive projects to obtain the same types of data for all cases. The high cost data that control cost are 1) drilling, coring, core-testing, logging, sampling and testing a characterization well and 2) collection of a 3-D seismic survey to map reservoir and confining system properties over the area of the plume or the area of elevated pressure. In 5 of our case study sites we determined that one or both of these costs could be avoided because the needs are met by available data.

54 ENVIRONMENTAL SCIENCES↗

Tailored Fiber Placement for Complex Preforms

Tailored Fiber Placement (TFP) offers a novel approach to optimize fiber architecture for the fabrication of complex, structural parts not traditionally suitable for advanced composites. This technology not only offers new routes for weight reduction via metal substitution, it also offers cost reduction through minimization of material scrap and reduced labor. This reduction in component weight leads to increased fuel efficiency, and reduced production energy consumption, thereby, helping to achieve the stated IACMI technical goals. This technology leverages centuries of manufacturing development in support of the textile and embroidery industry. One major drawback to this technology is the lack of commercial or non- proprietary structural performance data and robust analytical tools used to optimize fiber architecture and predict performance. This project was structured to utilize common sub-element features to validate analytical performance tools, generate performance data, and gather cost and performance data on components of interest. This project was designed to give industry sponsors the confidence and ability to take full advantage of TFP to fabricate primary, highly loaded structure and integrate features such as metallic fasteners. The project focused principally on the use of high strength carbon fiber, such as T700, and the use of aerospace epoxy resin matrix to primarily support development of new composite applications in vehicle, aerospace, and industrial markets. This project applied previously developed analytical tools to predict the performance of TFP produced parts. This work focused on developing the pipeline to characterize material in order to accurately predict component performance when modifying the TFP print paths and stitch density. This focused on experimental characterization via standardized ASTM testing, alongside experimental testing of more representative service components by testing curved beam strength, beam shear performance, a large scale TFP lug, and ultimately designing a fully TFP clip bracket that reduced weight and cost compared to a traditional metallic component. The new knowledge gained from this program included: 1) development and demonstration of novel analytical tools applied to analysis of TFP preforms; 2) development and demonstration of a building block approach using coupons and sub-elements to optimize the design of a more complex component; 3) demonstration that optimized fiber orientation using TFP can exceed performance of conventional textile composite materials and can open new applications currently limited to metallic components; 4) Demonstration of performance and cost benefits of the TFP process as compared to metallic and conventional textile composites. Recommendations for follow-on work include development of design allowables to assess the impact of high temperature/moisture exposure or saturation during loading, tracking the impact of stitching needle wear on the performance of parts and ability to stitch thicker preforms, using TFP preforms as local reinforcement at areas of bearing or complex loading, and topology optimization of components by tow steering. The expertise developed during the course of this project can be leveraged to provide commercial engineering design and fabrication services using TFP. UDRI is in the process of formalizing their partnership with Spintech, who will serve as the commercialization partner for this technology and provide molding services and deliver finished components to the end user. UDRI will continue to produce the preforms until the economics allow Spintech to procure its own TFP equipment or lease UDRI equipment, at which point UDRI will step away from manufacture and serve as the engineering and design lead on product development.

36 MATERIALS SCIENCE↗

Evaluating the Impact of Residential Solar Contract Cancellations in the United States

The residential solar photovoltaic (PV) market in the United States is growing, despite frequent customer cancellations. Contract cancellations result in lost time and costs that must be borne by installers, often in the form of higher "soft costs" (i.e., non-equipment costs). These costs are often passed on to customers who successfully install PV systems. To date, few studies have attempted to estimate national cancellation rates or model the impacts on installed system costs. In this report, we utilize an installer-provided dataset of 199,665 residential PV-only projects representing about 10% of U.S. installs each year from 2017-2019. With this data, we evaluate cancellation rates and trends from contract signing to install. Next, by leveraging NREL's soft cost model for residential solar, we estimate installer spending through each phase of the pre-install process. Applying our findings on cancellation timelines and rates, we then estimate the potential cost impacts to successful installs from contract cancellations. Our work suggests that the rates and impacts of contract cancellations have been previously underestimated. Namely, we find that cancellations/unsuccessful project are; more common than previous estimates suggest; occur earlier in project timelines, though a significant number happen even after permit/ATB approvals; and contribute significantly to customer acquisition and other soft costs. We also find that cancellation do not appear to be driven by review delays in permitting and interconnection applications.

14 SOLAR ENERGY↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Survey and Assessment of the Ocean Renewable Energy Resources in the US Gulf of Mexico

This study was conducted by the National Renewable Energy Laboratory (NREL) and funded by the Bureau of Ocean Energy Management (BOEM). It provides a comprehensive feasibility assessment of multiple offshore renewable energy technologies in the Gulf of Mexico (GoM) to inform BOEM's strategic plans related to possible Outer Continental Shelf alternative energy leasing activities in the GoM. In coordination with Gulf Coast states, the study includes some information on offshore renewable energy potential in state waters for future energy planning. The goal of the study is to survey potential offshore renewable energy sources in the GoM and quantify their feasibility relating to resource adequacy, technology maturity, and the potential for competitive cost. The study provides a review of available technologies and concepts for generating offshore renewable energy, including a high-level assessment of the current state of each technology and its potential for future advances. It provides a breakdown of resource capacity for each renewable energy technology and a recommendation that offshore wind be pursued for future study as the most promising technology. The renewable technologies that were considered include offshore wind, wave energy, tidal energy, ocean current energy, offshore solar energy, ocean thermal energy conversion (OTEC), cold water source cooling, and hydrogen (as a storage medium to utilize existing pipeline infrastructure). The resource capacity for each of these renewable energy sources was quantified for both the gross resource capacity potential (gross resource) and the technical resource capacity potential (technical resource) using the methodology described in an earlier NREL report. Many of these sources are very immature from a commercial perspective, which makes some of the comparisons difficult. In many cases, new methods were developed to estimate nominal power density for each technology type, which were necessary to convert the resource areas into deployable gross and technical resource capacity potentials.

17 WIND ENERGY↗

Lidar Buoy Data Dictionary: For the 2020 – 2021 California Deployments

Pacific Northwest National Laboratory (PNNL) manages two AXYS WindSentinel™ buoys (Buoys #120 and #130) on behalf of the U.S. Department of Energy (DOE) that collect a comprehensive set of meteorological and oceanographic (metocean) data to support resource characterization for wind energy offshore. The buoys have been deployed off the California coast in partnership with the Bureau of Ocean Energy Management (BOEM) from September 2020 through October 2021. One buoy was deployed within the Morro Bay Call Area offshore central California; the other buoy was deployed within the Humboldt Call Area off the coast of northern California. The measurements from the buoys are used to characterize the metocean conditions near potential locations for offshore wind lease areas and are uploaded to DOE’s Data Archive and Portal (DAP). Plots are updated on the DAP webpage to visualize the recent metocean measurements. This document serves as a data dictionary – or reference guide – for understanding and interpreting the data available from the buoys. This document includes: (1) specifications for the buoy instrumentation (Section 2.0) (2) description of each plot and definition of measured parameters (Section 3.0) (3) description of data files and naming convention (Appendix A) (4) reference guide of measurements and variables (Appendix B).

17 WIND ENERGY↗