Search NASA⌕ Search

SEARCH · Search NASA

Results for “LINAC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Transfer Line at Fermilab

Beam loss in high-intensity H- linacs, such as the PIP-II linac at Fermilab, is a critical challenge that requires comprehensive study and understanding to ensure efficient and safe operation. This study explores the various beam loss mechanisms encountered in the PIP-II linac and its beam transfer line, drawing parallels from other high-intensity H- linacs. Key loss mechanisms include residual gas stripping, where H- ions interact with residual gas molecules leading to electron detachment; field stripping, caused by the interaction of H- ions with magnetic fields; and intra-beam stripping, resulting from interactions within the beam itself. Beam halo formation, particularly due to Twiss function mismatch, is another significant source of beam loss, which can be exacerbated by Landau damping mechanisms. Adhering to the 1 W/m loss criterion is essential to maintain hands-on maintenance capability and ensure the longevity of the accelerator components. By understanding these mechanisms and implementing targeted mitigation strategies, the PIP-II linac can achieve its design goals while maintaining safe and efficient operations.

Pathak, Abhishek↗

LAMP Emittance Budget, Rev. 1

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). This brief report summarizes the emittance budget for the LANSCE Modernization Project (LAMP). While the project Key Performance Parameters (KPPs) specify threshold and objective requirements for charge delivered to each experimental area, no upper limits on beam emittances are specified. To maintain low losses in the high-energy section of the LANSCE linac and hands-on maintenance, some upper limits on beam emittance need to be specified for the new LAMP front-end performance. The scope of the LAMP project replaces the injector section and drift-tube linac (DTL) up to 100 MeV of the existing LANSCE linac. This new design replacement will be integrated with the remaining coupled cavity linac (CCL) which makes up most of the accelerator at LANSCE and accelerates the beam to a final energy of 800 MeV. The initial approach that has been used to define an emittance budget for the new LAMP front end is based on recent and historical measured beam emittances at 100 MeV for the three beam types accelerated at LANSCE: H+ (protons for isotope production), LBEG (H- beam for delivery to proton radiography and to the Lujan neutron spallation target, and MPEG (H- beam for delivery to the Weapons Neutron Research facility). The emittance budget (upper limit) for each beam type has been selected to maintain the losses in the CCL to a level approximately equivalent to those observed in present operations to first order. However, the goal of the LAMP project is to improve the quality of the beams injected into the CCL, if possible, thus allowing for higher average current operation while also lowering beam losses and activation at high beam energies. The table below summarizes the beam measurements evaluated and used to establish a conservative emittance budget for LAMP based on known historical beam losses and activation. However, based on estimates of the CCL admittance and the Isotope Production Facility (IPF) beamline acceptance, a more relaxed transverse emittance upper limit of 0.095 π-cm-mrad, rms, normalized may be acceptable at 100 MeV while still meeting the LAMP performance requirements for charge delivery to each LANSCE experimental area and maintaining hands-on maintenance. This upper limit is supported by a recent analysis of operational data. Additionally, the present conceptual LAMP front-end design meets this requirement.

43 PARTICLE ACCELERATORS↗

Measurement and Control of Beam Energy at the Fermilab 400 MeV Transfer Line

Linac is the first machine in the Accelerator chain at Fermilab where particles are accelerated from 35 keV to 400 MeV and travel to the Booster where they are stripped of the extra electrons to become protons. Tuning Linac is performed using diagnostics to ensure stable intensity and energy while minimizing uncontrolled particle loss. I have been revisiting diagnostics in the Linac in order to understand their signals and to ensure their data is reliable. I revisited Beam Loss Monitors (BLMs) for the loss data confidence. For the confidence of energy data there were two approaches. The first approach was time-of-flight measurements using Beam Position Monitors (BPMs) and beam velocity stripline pick-up that provides beam phase data. The second approach used the relation between beam position data from BPMs and dispersion values from MAD-X simulation to calculate energy. Our goal after understanding the data from the Linac diagnostics and finding the data reliable is to control the L inac parameters using Machine Learning techniques to increase the reliability and quality of beam delivered from Linac.

43 PARTICLE ACCELERATORS↗

Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector

The U.S. Spallation Neutron Source (SNS) is a state-of-the-art neutron scattering facility delivering the world’s most intense pulsed neutron beams to a wide array of instruments, which are used to conduct investigations in many fields of engineering, physics, chemistry, material science, and biology. Neutrons are produced by spallation of liquid Hg by the bombardment of short (∼1 µs), intense (∼35 A) pulses of protons delivered at 60 Hz by an accumulator ring which is fed by a high-intensity, 1 GeV, H− LINAC (linear accelerator). This facility has operated nearly continuously since 2006 but has recently undergone a 4-month maintenance period, which featured a complete replacement of the 2.5 MeV injector feeding the LINAC. The new injector was developed at ORNL in an off-line beam test facility and consists of an ion source, low energy beam transport, and a Radio Frequency Quadrupole (RFQ). This report first describes the installed configuration of the new injector detailing the ion source system. The first beam current, RFQ transmission, emittance, and energy measurements from the injector installed on the SNS are reported. These data not only show a significant performance improvement for our existing facility but will also make accessible the higher beam current requirements for future SNS upgrade projects: the proton power upgrade and second target station.

Welton, R. F.↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗

Design and demonstration of a distributed-coupling linear accelerator structure

We present a topology for linear accelerators (linacs) in which the power is distributed to the cavities through a waveguide with periodic apertures that guarantees the correct phases and amplitudes along the structure length. Unlike conventional traveling and standing-wave linacs, the presented topology allows the cavity shapes to be designed without the constraints applied to the coupling between cells to transfer power from one cell to the next. Therefore, the topology permits more degrees of freedom for the optimization of individual cavity shapes in comparison with conventional linacs. The cavity shapes can be optimized for power consumption and efficiency, and/or the manipulation of the surface fields for high gradient operation. This topology also provides a possibility for low-temperature manufacturing techniques that prevent the annealing of the material during typical brazing processes; hence, the material could retain its original properties such as hardness. We present a design and an experimental demonstration of this linac.

43 PARTICLE ACCELERATORS↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Status of 22 GeV CEBAF Upgrade Using FFA Arcs

Jefferson Lab is exploring an upgrade to extend CEBAF’s energy to ~22 GeV within the existing tunnel by incorporating Fixed-Field Alternating-Gradient (FFA) arcs. In this scheme, the two lowest-energy electromagnetic arcs are removed, the remaining arcs are reassigned to lower energies, and a new pair of high-energy FFA arcs enables six additional recirculations using the existing SRF linacs. The non-scaling FFA lattice employs Halbach-derived permanent magnets with provisions for dipole, quadrupole, and higher-order components, offering large momentum acceptance and reduced operating cost. Implementing this concept requires updated linac optics, modifications to the remaining arcs, and a redesigned electromagnetic switchyard. Ongoing beam-dynamics studies address synchrotron-radiation–induced energy loss and emittance growth, along with strategies for their mitigation.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Design progress for the 22 GeV CEBAF energy upgrade

In this work we examine the progress made in the design of the proposed FFA upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF). This proposed upgrade will double the number of passes through the two linacs by replacing the two highest energy arcs with new Fixed Field Alternating Gradient (FFA) arcs, roughly doubling the energy. These FFA arcs will use permanent magnets in a Halbach configuration to shape their fields. The design involves new optics for the linacs and remaining electromagnetic arcs, as well as new electromagnetic separators. These feed into the permanent magnet FFA arcs. We also report on ongoing studies of the dynamics of the beams, and an experiment to measure the effects of radiation on the permanent magnets.

Accelerator Physics↗

EM and beam dynamics modeling of CCL with CST Studio

The 800-MeV proton linac at LANSCE consists of a drift-tube linac, which brings the beam to 100 MeV, followed by a coupled-cavity linac (CCL). Each of 44 CCL modules contain multiple tanks, and it is fed by a single 805-MHz klystron. CCL tanks are multi-cell blocks of identical re-entrant sidecoupled cavities, which are followed by drifts with magnetic quadrupole doublets. Bridge couplers – special cavities displaced from the beam axis – electromagnetically couple CCL tanks over such drifts. We have developed 3D CST models of CCL tanks of the LANSCE linac. Their electromagnetic analysis is performed using MicroWave Studio. Beam dynamics is modeled with Particle Studio for bunch trains with realistic beam distributions using the CST calculated RF fields and quadrupole magnetic fields to determine the output beam parameters.

42 ENGINEERING↗

The MTA primary beamline description and performance [Slides]

The Muon Test Area (2003) was initially constructed to develop, test, and verify muon ionization apparatus using the 400-MeV proton beam from the Fermilab Linac. Since muon facilities involve the capture, collection and cooling of ~10 13 muons at a repetition conclusive tests require ~10 13 protons/pulse (full Linac beam): the original concept/request was for a full Linac capability (~10 14 p/sec). The beamline designed for MTA experiments, however, includes specialized insertions for linac beam diagnostics and beam measurements, greatly enhancing the functionality and complexity of the beamline. Installation of the beamline was complete fall, 2008. It represents the only facility in which experiments have direct access to a primary beam.

43 PARTICLE ACCELERATORS↗

Compact, high-power superconducting radio-frequency accelerators for environmental applications

Electron-beam irradiation has been proven to destructively reduce or eliminate a wide variety of organic chemicals, viruses and bacteria from wastewater, as well as reducing sulfur and nitrous oxides emission from coal-fired power plants. It is estimated that there are approximately 30,000 such particle accelerators in use worldwide for industrial processes including surface and bulk processing of material, medical sterilization, and environmental remediation. Maximum beam power from accelerators used in these applications is currently limited to less than 500 kW, and a higher beam power is needed to reduce treatment costs. The market availability of continuous-wave (CW) electron-beam accelerators with power of the order of ~100 kW is also very limited. Superconducting radio-frequency (SRF) linear accelerators (linacs) are commonly used at basic research laboratories throughout the world due to their exceptionally high efficiency as compared to current industrial varieties. Recent advances in cryogenics, SRF thin films and high-power magnetrons allow for the design of increasingly compact and efficient CW SRF electron linacs in the energy range 1-10 MeV, with up to 1 MW of beam power. A new class of compact, high-efficiency electron-beam accelerators may provide cost-effective solutions for a range of industrial and environmental remediation applications, particularly with respect to tackling one such class of contaminants so-called “forever chemicals”, including per- and polyfluoroalkyl substances (PFASs), which are ubiquitous in a wide range of products and for which there is currently no effective destruction technology. We have recently demonstrated the key technologies required for such accelerators by: 1) operating a Nb3Sn SRF accelerating cavity cooled by commercial cryocoolers up to an accelerating gradient of 12.4 MV/m and 2) demonstrating the phase-locking as well as a high-efficiency power combining scheme for industrial magnetron transmitters. In this presentation, we will introduce the principles and benefits of MW-class SRF linacs, based on the conduction-cooled SRF technology that we have demonstrated for environmental remediation. We propose the development of a 4 MeV, 20 kW prototype to be built at Jefferson Lab as a first accelerator demonstrator unit. We will also present the results from samples study on the effect of electron-beam irradiation on so-called “forever chemicals” such as 1,4-dioxane and PFAS, using an existing multi-purpose 10 MeV, low-power, CW SRF linac at Jefferson Lab.

Ciovati, Gianluigi↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Accumulator Ring Design Energy and RCS-based Proton Driver

Traditional Fermilab proton upgrade scenarios include a "linac option" and an "RCS option". In the former case all the acceleration takes place in the linac into an accumulator ring, and in the latter case as much acceleration as possible takes place in the RCS. Whereas muon collider proton driver scenarios typically assume all linac acceleration, the possibility of an RCS option should be considered more closely. We walk through the technical risks and possible benefits injecting at a lower energy including space-charge, H- stripping, circumference, and linac design.

Eldred, Jeff [Fermilab]↗

Design and Commission of Solid State Switch Driver in SLAC Subbooster Modulator

The LINAC sub-booster modulator is a pulsed power supply to provide a 30kV pulse to drive a klystron in SLAC LINAC. It has utilized vacuum tetrode as pulse switch for more than 60 years. With the vacuum tetrode availability becoming less and its cost surging, a natural choice is to use solid state switch in this pulsed power modulator. To commission solid state switch in LINAC sub-booster modulator, a driver board is designed to drive a BEHLKE HTS-LC2 series MOSFET based switches. The design concept and some concerns in design will be presented. The driver board is universal for all HTS-LC2 series switches because they share the same driver signals and connections. After the driver is commissioned, two AI systems are introduced to design one core part of the driver, the results are presented here. During the commission of the driver board in the LINAC sub-booster modulators, some problems happened and were addressed.

AI Circuit Design↗