Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Grid Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

A cross-dimensional analysis of data-driven short-term load forecasting methods with large-scale smart meter data

Electricity load forecasting is essential to utility operation and power grid stability. A wide spectrum of data-driven methods, ranging from linear regression models to more recent deep learning models have been adopted to forecast electric load over the years. However, there still lacks a holistic evaluation of the applicability of conventional statistical and machine learning based algorithms with respect to different temporal and spatial scopes, computational requirements, and sensitivity of model-tuning. Enabled by a large-scale electricity load profile dataset of over 40,000 residential customers in a utility region, we conducted a cross-dimensional analysis of data-driven load forecasting methods. Three regression-based and seven deep learning algorithms with different model configurations were evaluated in terms of their overall and peak load prediction accuracy, and training burdens, across spatial aggregation levels ranging from the transformer, feeder, substation, to neighborhood. We found, first, the load forecasting accuracy is constrained by a predictability boundary, influenced by the forecasting horizon and spatial aggregation level. Specifically, RandomForest, XGBoost, TFT, TSMixer, and TiDE models achieved less than 10 % prediction error for up to 96-h ahead forecasting for district, substation, and feeder levels, while other models struggle at long-horizon predictions; Second, for winter and summer peak load dates, most models were able to predict the peak demand timing within ± 1 h, but the prediction percentage error varied by models, with TFT and TiDE models being the top performers; Third, models with similar prediction accuracy can differ in training burden by an order of magnitude. Therefore, choosing model configurations that balance prediction performance and computational resource is an important practical consideration for large-scale deployment of the machine learning based load forecasting. The outcome of this study can guide researchers and practitioners to choose the proper load forecasting algorithms based on their problem scope, required accuracy, and available resources. The predictability boundary can serve as a benchmark for electricity load forecasting problems with new algorithms and datasets.

Li, Han↗

Performance Evaluation of Data-Enhanced Hierarchical Control for Grid Operations

This paper presents a hardware-in-the-loop (HIL) simulation to evaluate the performance of voltage regulation of Data-Enhanced Hierarchical Control (DEHC). This DEHC uses an advanced distribution management system (ADMS) for grid operations to control legacy and grid-edge devices and coordinate with distributed energy management systems (DERMS) to manage high penetrations of photovoltaics (PV) on a utility distribution system. The HIL platform provides realistic laboratory testing, including accurate modeling (legacy devices, grid-edge devices, and PV) of the real-world distribution system from a utility partner, a real controller (ADMS), software controller DERMS, hardware grid-edge devices, and standard communications protocols. The test results demonstrate functionalities of the integrated platform and the performance of voltage regulation of the coordinated control systems. Based on laboratory testing, the utility can set up the same grid-automation system to manage DERs, legacy devices, and grid-edge devices to achieve their system-level control and operation objectives (e.g., voltage regulation), thus de-risking potential issues such as instability for field deployment.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Prescient

Prescient is a software package for simulating electricity grid (power systems) operations, under both nominal and extreme event conditions. Core functionality includes discrete event simulation, commitment and dispatch optimization, probabilistic scenario construction, and reporting/visualization. SAND2020-0169 M Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-NA0003525.

Watson, Jean Paul↗

ARRA: Reconfiguring Power Systems to Minimize Cascading Failures - Models and Algorithms

Building on models of electrical power systems, and on powerful mathematical techniques including optimization, model predictive control, and simluation, this project investigated important issues related to the stable operation of power grids. A topic of particular focus was cascading failures of the power grid: simulation, quantification, mitigation, and control. We also analyzed the vulnerability of networks to component failures, and the design of networks that are responsive to and robust to such failures. Numerous other related topics were investigated, including energy hubs and cascading stall of induction machines

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Power as a Virtual Synchronous Generator (WindVSG)

This project investigated the theory, implemented it in hardware, and validated the Wind as a Virtual Isochronous Generator (WindVSG) concept by combining the advantages of modern dynamic inverter technologies with static, dynamic, and transient electromechanical properties of synchronous machines. During this project we demonstrated how to control the inverters of wind turbine generators (wind alone or in parallel with other GFM sources, such battery energy storage) so that wind power behaves like a synchronous machine-based power plant with a conventional prime mover. For this purpose, testing was conducted at NLR ARIES facility with real 2.5 MW wind-turbine generator operating in GFM mode under dynamic and transient conditions. The team also developed models and conducted simulations for GFM wind power to evaluate stability impacts of GFM operation on power grid. This report describes efforts by the NLR team working in collaboration GE Vernova during 3-year project.

17 WIND ENERGY↗

Solar Eruptive Events

It s long been known that the Sun plays host to the most energetic explosions in the solar system. But key insights into the forms that energy takes have only recently become available. Solar flares have been phenomena of both academic and practical interest since their discovery in 1859. From the academic point of view, they are the nearest events for studying the explosive release of energy in astrophysical magnetized plasmas. From the practical point of view, they disrupt communication channels on Earth, from telegraph communications in 1859 to radio and television signals today. Flares also wreak havoc on the electrical power grid, satellite operations, and GPS signals, and energetic charged particles and radiation are dangerous to passengers on high-altitude polar flights and to astronauts. Flares are not the only explosive phenomena on the Sun. More difficult to observe but equally energetic are the large coronal mass ejections (CMEs), the ejection of up to ten billion tons of magnetized plasma into the solar wind at speeds that can exceed 1000 km/s. CMEs are primarily observed from the side, with coronagraphs that block out the bright disk of the Sun and lower solar atmosphere so that light scattered from the ejected mass can be seen. Major geomagnetic storms are now known to arise from the interaction of CMEs with Earth's magnetosphere. Solar flares are observed without CMEs, and CMEs are observed without flares. The two phenomena often occur together, however, and almost always do in the case of large flares and fast CMEs. The term solar eruptive event refers to the combination of a flare and a CME. Solar eruptive events generate a lot of heat: They can heat plasma to temperatures as high at 50 million Kelvin, producing radiation across the electromagnetic spectrum. But that s not all. A fascinating aspect of solar eruptive events is the acceleration of electrons and ions to suprathermal often relativistic energies. The accelerated particles are primarily observed through their emissions in the higher energy x-ray, gamma-ray, and rf regimes. The radio and x-ray emissions are both from mildly relativistic electrons with energies of tens of keV and above. Gamma-ray line emission comes indirectly from accelerated protons and heavier ions with MeV and higher energies. The difficulty in collecting spatially and spectrally resolved x-ray and gamma-ray data has long been a barrier to learning about the accelerated particles. Considerable progress has been made in the last decade in understanding the relationship between the flare, the CME, energy release, and particle acceleration. But many new questions have also arisen. In this article, I describe those new insights and our evolving understanding of solar eruptive events.

Holman, Gordon D.↗

Delivery-Risk-Aware Flexibility Scheduling and Dispatch for Aggregated Flexible Loads

Flexible loads like smart thermostats and water heaters can shift energy consumption and provide flexibility to the grid. However, this flexibility is dependent on occupant behavior and can lead to delivery risk, which causes utilities and grid operations to consider them as unreliable for purposes of grid operation. To date, they have not been well integrated into wholesale electricity markets or ancillary service offerings. With proper consideration of uncertainty and risk, these resources can be one of the most cost-effective sources of flexibility. This work uses stochastic optimization to quantify and bid flexibility from a fleet of flexible resources while considering their delivery risk.

DER↗

Reconfiguration of power grids during abnormal conditions using reclosers and distributed energy resources

Apparatus and methods are disclosed for restoring operation of a power grid comprising a plurality of reclosers and distributed energy resources (DERs) responsive to abnormal conditions by determining and implementing a reconfiguration for the power grid. The reconfiguration can specify respective new statuses for one or more of the reclosers and/or respective quantities of reactive power to be supplied by one or more of the DERs. The reconfiguration can be determined based on a plurality of constraints using an objective function, the constraints being determined based at least in part on recloser status data and/or DER power generation capability data. Respective cleared quantities of reactive power for the DERs to supply to the reconfigured power grid can be determined via a transactive control scheme, and the reconfiguration can be updated prior to implementation based on the results of the transactive control scheme.

Radhakrishnan, Nikitha↗

Performance Evaluation of Multi-Vendor Grid-Forming Inverters for Grid-Connected Operation Through Hardware Experimentation: Preprint

Existing real-world projects of GFM inverters that operate in parallel to power grids typically are sized between dozens and a few hundreds Megawatt (MW) scale according to a recent NERC GFM inverter white paper. These large systems are often difficult to evaluate prior to deployments because of their large size. The performance of smaller GFM inverters (dozens to a few hundreds MW) that operate parallel with power grids (distribution systems) is even less understood. There is an opportunity to better understand these systems through hardware testing under controlled laboratory conditions. Therefore, this paper presents the functional performance evaluation tests of multiple (three) commercial GFM inverters when they operate in parallel with the grid through hardware experiments. The goal of these tests is to explore the GFM inverters' functionalities and dynamic response when in parallel with power grids to eventually develop universal specifications for GFM inverters. Both steady state (changing the inverter's frequency and voltage droop) and transient (adding step change in grid's frequency/voltage) tests are performed for each GFM inverter with the same testing circuit and testing protocol. The experimental results indicate the bench-marked performance that: 1) the GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power when paralleled to the grid; 2) the GFM inverters automatically respond to system frequency and voltage events to output the needed power, however, the GFM inverters all show stability issues when absorbing reactive power from the grid.

grid-forming inverters↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computational and numerical analysis of AC optimal power flow formulations on large-scale power grids

We report that alternating current optimal power flow (AC-OPF) is a fundamental tool in electric utilities to determine optimal operation of the various resources. Typically, the AC-OPF problem uses power balance formulation containing voltages and power equations. Yet, there is no comprehensive comparison of the different AC-OPF formulations, especially for large-scale networks. This paper presents a detailed comparative evaluation of different formulations of the AC-OPF problem on networks ranging from 9-bus to 25,000 buses. Three different formulations: 1) power balance with polar voltages, 2) power balance with Cartesian voltages, and 3) current balance with Cartesian voltages are discussed in detail by comparing their characteristics, and numerical and computational performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

E-transit-bench: simulation platform for analyzing electric public transit bus fleet operations

When electrified transit systems make grid aware choices, improved social welfare is achieved by reducing grid stress, reducing system loss, and minimizing power quality issues. Electrifying transit fleet has numerous challenges like non availability of buses during charging, varying charging costs and so on, that are related the electric grid behavior. However, transit systems do not have access to the information about the co-evolution of the grid's power flow and therefore cannot account for the power grid's needs in its day-to-day operation. In this paper we propose a framework of transportation-grid co-simulation, analyzing the spatio-temporal interaction between the transit operations with electric buses and the power distribution grid. Real-world data for a day's traffic from Chattanooga city's transit system is simulated in SUMO and integrated with a realistic distribution grid simulation (using GridLAB-D) to understand the grid impact due to transit electrification. Charging information is obtained from the transportation simulation to feed into grid simulation to assess the impact of charging. We also discuss the impact to the grid with higher degree of transit electrification that further necessitates such an integrated transportation-grid co-simulation to operate the integrated system optimally. Our future work includes extending the platform for optimizing the charging and trip assignment operations.

Sen, Rishav↗

Enhanced Frequency Support Scheme of Generic Inverter-Based Resource Models for Renewable-Dominated Power Grids

The frequency response of SG-dominated power grids is predictable ahead of an occurrence of a frequency event because the frequency response of SGs is consistent, and it can be inferred from the swing equation [1]. However, increasing the portion of IBRs in an SG-dominated power grid might make the characteristics of the conventional power grids no longer valid because this changing resource mix affects grid dynamics and controls [2]. Thus, maintaining these characteristics greatly benefits the control and operation of the power grids with high penetration of IBRs. To maintain these characteristics in IBR-dominated power grids, IBRs should have frequency response capability similar to that of an SG. The WECC modeling validation subcommittee has developed generic IBR models for large system planning [3]-[5]. These models can represent various vendors' dynamic behavior for WTG, PV, and ESS [5]. The current generic IBR models approved by WECC can provide frequency response only from droop control loops in REPC models [6], [7]. The contribution of the loops is proportional to the frequency deviation from the nominal frequency. Thus, it presents an insufficient contribution to arrest frequency variation compared to the frequency response of SGs because it allows a high ROCOF in the early stage of frequency events. This shortfall will become greater as the PL of IBRs increases in power grids. Controller enhancement for the generic IBR models is required to secure the frequency stability under high PL of IBRs as in the SG-dominated power grids. This paper proposes a control extension for the generic IBR models to enhance the frequency support capabilities and discusses the classification of frequency support for the different types of IBR considering their operating constraints. An inertial control scheme is implemented in the REPC and REEC models of the generic IBR models to achieve these objectives. The inertial control scheme includes the following stages: Control area data acquisition, inertia time constant estimation, IBR-related constraint check, IBR contribution determination, and inertial response provision. In the scheme, a REPC acquires control area data from a system operator and estimates a total inertia time constant for the control area the applicable IBR power plant belongs. Then, the estimated inertial time constant is transferred to each IBR controller—REEC—within the power plant. Each REEC checks the availability of applicable IBR for inertial response participation. If the IBR is available, the REEC amplifies the estimated inertial time constant to utilize it for inertial response provision. In this way, the proposed inertial response scheme extends the functionality of the generic IBR models to provide SG-like frequency response within their constraints. Various scenarios considering different IBR types, IBR penetration levels, and frequency control schemes were simulated and compared in an IEEE 39-bus system using PSCAD simulator to verify the effectiveness of the proposed scheme.

Kim, Jinho↗

A Novel Application of Parallel Betweenness Centrality to Power Grid Contingency Analysis

In Energy Management Systems, contingency analysis is commonly performed for identifying and mitigating potentially harmful power grid component failures. The exponentially increasing combinatorial number of failure modes imposes a significant computational burden for massive contingency analysis. It is critical to select a limited set of high-impact contingency cases within the constraint of computing power and time requirements to make it possible for real-time power system vulnerability assessment. In this paper, we present a novel application of parallel betweenness centrality to power grid contingency selection. We cross-validate the proposed method using the model and data of the western US power grid, and implement it on a Cray XMT system - a massively multithreaded architecture - leveraging its advantages for parallel execution of irregular algorithms, such as graph analysis. We achieve a speedup of 55 times (on 64 processors) compared against the single-processor version of the same code running on the Cray XMT. We also compare an OpenMP-based version of the same code running on an HP Superdome shared-memory machine. The performance of the Cray XMT code shows better scalability and resource utilization, and shorter execution time for large-scale power grids. This proposed approach has been evaluated in PNNL’s Electricity Infrastructure Operations Center (EIOC). It is expected to provide a quick and efficient solution to massive contingency selection problems to help power grid operators to identify and mitigate potential widespread cascading power grid failures in real time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurement Accuracy Limitation Analysis on Synchrophasors

This paper analyzes the theoretical accuracy limitation of synchrophasors measurements on phase angle and frequency of the power grid. Factors that cause the measurement error are analyzed, including error sources in the instruments and in the power grid signal. Different scenarios of these factors are evaluated according to the normal operation status of power grid measurement. Based on the evaluation and simulation, the errors of phase angle and frequency caused by each factor are calculated and discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Resilient, Self-Powered, Fuel Flexible, High Efficiency Heating System (Final Report)

The Grid Independent High Efficiency System (GIHES) delivers a heating system that operates free from the power grid and provides ultra-low emissions and high efficiency heating for residential and commercial buildings. The project demonstrated two weeks of continuous grid independent operation of a storage water heater equipped with a powered damper. The Thermoelectric Generator (TEG) integrated GIHES technology revolutionizes heating systems to provide grid resilient hot water production, while delivering significant value to the end user by eliminating impacts of power interruption and enhancing comfort, convenience and productivity. The system maximizes the thermal-to-electric conversion efficiency by optimizing location and orientation of the TEGs and durability while lowering system costs. The TEGs generate enough power to charge a battery and run the storage water heater unit with a powered damper uninterrupted by providing the required parasitic electrical power for start-up, shutdown and during idling. Several TEGs were analytically and experimentally evaluated based on the size, surface area and the power being generated before designing and fabricating a complete multi-TEG assembly for integration with the water heater. The GIHES technology can be extended to boilers, furnaces and tankless water heaters and integrated with heat pump to further increase the overall equipment efficiency. The technology has the potential to reduce the amount of dispatch power and peak power plant operation. An advanced burner was designed, developed and 3D printed for fuel flexible operation. The burner was designed to enable tighter integration with TEGs for potentially higher TEG output, should this be necessary. A bench-scale test rig to perform testing of a 200,000 Btu/h burner and capable of handling up to 10% H2 (by volume) was setup at GTI’s laboratory with appropriate safety and controls to ensure smooth and safe operation. Testing of the 3D burner showed < 5 ppm NOx emissions can be achieved for the entire firing range and with different levels of hydrogen blends with natural gas. The burner will enable a more integrated TEG-burner module design for improved system performance, should this be required in the future. Techno-economic analysis (TEA) of the TEG integrated with the water heaters was performed. The testing data and the power output were used to develop the TEA. The analysis for the storage unit with damper showed that the TEG integrated system costs $95. This is much lower than a one-time charge needed to wire and install dedicated power. Discussions with TEG manufacturers and OEM’s will provide more detailed information and methods to further lower these costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Improved Stochastic Unit Commitment Formulation to Accommodate Wind Uncertainty

The United States targets to supply 20% of its electricity generation using wind energy by 2030. The expansion of renewable resources, especially weather-based resources such as wind, creates more uncertainty and variability in the operation of the power grid. New methods and approaches in electricity market operations are needed to efficiently manage the continuing increase in variability and uncertainty caused by expanding intermittent wind. This paper proposes an improved stochastic programming approach for incorporating wind uncertainty into energy markets. The proposed formulation improves the two-stage stochastic unit commitment problem by introducing a dynamic decision making approach similar to a multi-stage formulation in the presence of wind power scenarios which are not well represented by a scenario tree. The numerical results present up to 1%-2% decrease in operational costs compared to the two-stage stochastic unit commitment formulation.

Electricity markets↗