Search NASA⌕ Search

SEARCH · Search NASA

Results for “Process Owner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Johnson Space Center's Free Range Bicycle Program.- Fall 2015 Intern Report

NASA's Johnson Space Center is a big place, encompassing 1,620 acres and more than a hundred buildings. Furthermore, there are reportedly 15 thousand employees, all of which have somewhere to be. To facilitate the movement of all these people JSC has historically relied on human power. Pedaling their way towards deep space, bicycles have been the go to method. Currently there are about 200 Free Range Bicycles at JSC. Free Range Bicycles belong to nobody, except NASA, and are available for anybody to use. They are not to be locked or hidden (although frequently are) and the intention is that there will always be a bike to hop on to get where you're going (although it may not be the bike you rode in on). Although not without its own shortcomings, the Free Range Bicycle Program has continued to provide low cost, simple transportation for NASA's JSC. In addition to the approximately 200 Free Range Bicycles, various larger divisions (like engineering) will often buy a few dozen bikes for their team members to use or individuals will bring their own personal bike to either commute or use on site. When these bicycles fall into disrepair or are abandoned (from retirees etc) they become a problem at JSC. They are an eye sore, create a safety hazard and make it harder to find a working bike in a time of need. The Free Range Program hopes to address this first problem by "tagging out" abandoned or out of service bicycles. A bright orange "DO NOT OPERATE" tag is placed on the bike and given a serial number for tracking purposes. See picture to the right. If the bike has an active owner with intentions to repair the bike the bottom of the tag has instructions for how to claim the abandoned bicycle. After being tagged the owner of the bicycle has 30 days to claim the bicycle and either haul it off site or get it repaired (and labeled) in accordance with Johnson's Bicycle Policy. If the abandoned bicycle is not claimed within 30 days it becomes the property of the Government. The bicycle is then (in short) repaired, labeled, documented and converted to a free range bicycle. Bikes beyond repair are cannibalized of useable parts and then scrapped. That was nearly the first thing I did when arriving at work. After getting settled in and coordinating the purchase of 50 new bicycles (elaboration below); I started combing the Center. Bikes are hidden and tucked away in the oddest of places and it was my priority to root all of them out. I tagged 70 bikes on the center, setting a record. I tagged so many bikes I ran out tags and had to make more. Long ago it was discovered that the same harsh elements that wreak havoc on the bikes, destroy the tags before the 30 day timeframe. The tags are labeled with instructions on how to claim the bike and numbered, then these paper labels are laminated with packing tape. It sounds like a simple process but nothing fits right, everything has to be trimmed, put on straight and is generally a pain in the neck. So I made an assembly process and knocked out a few hundred to save having to do it again for a while. I walked the center and tagged bikes at every building hiding in nearly every nook and cranny. Thus, in conclusion, I've done many things here at JSC on my first term and had a blast doing it. I've learned a lot from my multi-faceted roles and continual challenges. In short I've done my best to get folks at JSC on bikes and keep folks at JSC on bikes and tended a flock of free range bicycles. Everything from turning the rusty bolts and oiling chains to coordinating a $20,000 deal on 50 new free range bicycles. I am proud of the bicycle shop I have built and am infinitely grateful to the people who lead, help, guide and support me. I have fixed a great number of bicycles and cleaned the center of unsightly and unsafe piles of bicycles. I am immensely thankful for this opportunity to learn and serve and appreciate the privilege of coming back for a second term. A second term, in which I will continue to develop this awesome program.

Lee-Stockton, Willem↗

Integrated Operations for Nuclear Business Operation Model Analysis and Industry Validation

The purpose of this report is to refine and analyze five work reduction opportunities first presented in INL/EXT-21-64134, Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts. This report seeks to further refine and analyze five work reduction opportunities first presented in the original report. Researchers selected five work reduction opportunities from the full Integrated Operations for Nuclear (ION) suite. A selected group of utilities then verified details and inputs from the original report. Categories for verification included capital cost, technology requirements, and savings. Researchers then modeled the data points and data ranges using probabilistic analysis which predicts the likelihood of positive or negative net present value. Research results show four out of the five work reduction opportunities have a greater than fifty percent chance of a positive net present value outcome when analyzed independently. When the five work reduction opportunities are grouped and analyzed together the model indicates a sixty percent chance that the outcome of all five taken together will be positive. The nuclear industry should interpret these results as encouraging. In line with the ION model, positive financial analysis supports the investment of capital dollars into existing nuclear power plants along the ION model. Implementation of the five work reduction opportunities in this report is likely to result in substantive long-term savings for the owners and operators of domestic nuclear power plants.

99 GENERAL AND MISCELLANEOUS↗

Electrochemical Water Treatment for Cooling Towers

Cooling towers are an integral component of many refrigeration systems, providing comfort or process cooling across a broad range of applications. They are the point in the system where heat is dissipated to the atmosphere through the evaporative cooling process. Cooling towers are commonly found in industrial applications and are also commonly applied to water cooled chilled water plants in medium to large commercial buildings. Cooling towers used in medium to large commercial buildings are the focus of this paper. Cooling towers consume a large amount of water. Cooling tower related water consumption is one of largest potable water loads within buildings in the United States, with over 26% of water use associated with heating and cooling. Reducing water consumption is a priority for the General Services Administration (GSA) due to Executive Order 13514, Energy Policy Act of 1992, and regional water shortage concerns. These factors have brought about the investigation of cost effective opportunities to reduce water use, such as alternative water treatment (AWT) technologies for cooling towers. Traditional water treatment approaches rely on chemicals to extend the ability of the water to hold scaling minerals in suspension, minimize corrosion, and prevent biological growth. This treatment protects the chillers and cooling tower equipment, however even when chemicals are used regularly, a certain percentage of condenser water must be blown down and made up with fresh water to maintain system water quality parameters. In addition, the use of chemicals sometimes creates a waste issue and can cause building owners to incur additional fees such as disposal or sewer charges. The current state of water treatment in GSA buildings is to contract for a fixed fee with a company specializing in a conventional chemical maintenance. There are many vendors of AWT systems. This project assesses the effectiveness of one technology provided by Dynamic Water Technologies (DWT). This project assesses the effectiveness of DWT for lowering GSA operating costs while maintaining proper water treatment. The application of the DWT technology in place of traditional chemical water treatment has the anticipated benefits of: - Saving water and water/sewer costs by reducing the amount of blowdown required due to being able to remove scale causing minerals that allows the system to operate at a higher cycles of concentration - Eliminating the need for water treatment chemicals for scale, corrosion, and biological growth - Increasing chiller efficiency by preventing scaling and removing some of the existing scale, which improves heat transfer - Maintaining very low corrosion rates. The technology was installed at the Juliette Gordon Low Federal Building located in Savannah, Georgia. The building has two cooling towers utilizing traditional chemical water treatment for the cooling water circulating through the two chiller condensers. Measurement at the site includes the flow of makeup water to the cooling towers and the blowdown flow rate from the cooling tower basins. Additionally, energy measurements include the electrical energy from the chillers, chiller water pumps, condenser water pumps, cooling tower fans and the energy used by the DWT skid and slip stream pump.

15 GEOTHERMAL ENERGY↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

This LWRS research seeks to assist in breaking the impasse which has precluded digital safety system upgrades by generating and demonstrating a process and related business case tool to enable a Business Case Analysis (BCA). The purpose of a BCA is to show such upgrades can be economically justified. This BCA methodology first systematically establishes a forecast of expected lifecycle costs for I&C identified for upgrade by: • Definitively bounding the scope of current I&C systems envisioned for upgrade. • Collecting historical labor and material usage data that bound cost contributors related to the systems to be upgraded. • Synthesizing and analyzing the data to establish lifecycle cost forecasts for the current systems. In collaboration with engineers familiar with the attributes of the digital equipment to be used in the upgrade and how it is envisioned to be applied, cost savings categories and expected savings in those categories are then identified and applied using the analysis tools developed for this purpose. The result is an estimate NPV of savings enabled by the upgrade. This includes both direct cost savings (e.g., surveillance labor costs) as well as cost avoidance items (e.g., inventory carrying costs). Finally, when utility-provided digital upgrade costs estimates are included, the resultant BCA provides an NPV for the upgrade project. Development of a useful BCA methodology requires a real-world basis. With the cooperation of Exelon Generation (“Owner”), an Exelon-owned 2-Unit BWR Station (“Station”) was used as the foundation for this research. Exelon is pursuing a digital upgrade of current, first-echelon, safety-related I&C systems at these units, including the following: • Reactor Protection System (RPS) • Nuclear Steam Supply Shutoff System (N4S) • Emergency Core Cooling Systems (ECCS) • Anticipated Transient Without Scram (ATWS) Mitigation System

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Data Driven Commercial Building Energy Code Compliance and Technology Inventory for New York City

Building Performance Standards (BPS) are gaining national traction. A BPS will require new processes in the design, construction, and operation of buildings that take the occupants into account and enable predictive analysis to ensure compliance with current and future GHG emissions caps. In New York City, most buildings over 25,000 square feet will be regulated by a BPS starting in 2024, regardless of whether it is new construction permitted under current energy codes or an existing building. This research is one of the first to begin the evaluation of a long-term series of building policies in the context of an open data ecosystem, in cooperation with city agencies. Existing building policies enacted in NYC have ranged from building energy benchmarking and labeling to energy audits to the regulation of GHG emission in buildings. Through the development of a dataset related to building technologies and energy consumption, this project can help to evaluate if meaningful conclusions can be drawn for the data that has been largely self-reported in compliance with city regulations. This project will also provide lessons learned from a deep dive into these types of datasets to provide best practices for municipalities or states seeking to embark on policies like those enacted in NYC. In addition, a Building Automation System (BAS) Stretch Standard of Care (SSOC) for owners, designers, and building operators will enable the measurement and predictive analysis of energy consumption and GHG emissions at the plant, system, or component level, in anticipation of regulated GHG limits on buildings based on energy use. The SSOC is expected to be suitable for use on a national level. The primary feature of an SSOC is a standardized format for a set of BAS points that can be used to control and to gather data from individual plants, systems, or components that are related to building energy consumption. This project examined how measurements compare to prescriptive or simulation-based energy code targets, finding little correlation between predictive 8760-hour energy modeling and actual energy consumption for a small sample (n=27) of buildings constructed after 2015. Other analysis found that, while large multifamily housing (MFH) buildings showed a general trend similar to predicted reductions in energy use from the implementation of model commercial energy codes, this trend was not evident in the office, K-12 school, and hotel use groups in NYC. No upward or downward trends in energy consumption were found when buildings were grouped by size. Energy audit data were analyzed and it appears that there is bias by audit company on measures recommended to clients. Further research should be performed to cross-analyze this with other attributes, such as building size, vintage, and number of stories. Analysis found that for 281 buildings that were permitted and completed after 2015 and had submitted benchmarking data in 2022, between 81% and 96% (by use group) were found to be in compliance with the 2024 to 2029 NYC BPS emission caps, and between 55% and 89% were in compliance with the 2030-2034 caps. This work is beneficial to the public in helping policymakers and building stakeholders better understand the wide-ranging implications of a BPS.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Continuous Monitoring and Partial Water Softening for Cooling Tower Water Treatment

Cooling towers are an integral component of many refrigeration systems, providing comfort or process cooling across a broad range of applications. They are the point in the system where heat is dissipated to the atmosphere through the evaporative cooling process. Cooling towers are commonly found in industrial applications and are also often used in water-cooled chilled water plants in medium to large commercial buildings. Continuous monitoring and partial water softening for cooling towers used in medium to large commercial buildings are the focus of this paper. Cooling towers consume large amounts of water. Cooling tower-related water consumption is one of largest potable water loads within buildings in the United States, with substantial building water use associated with heating and cooling. Regional water shortages have highlighted a need to reduce water consumption; the U.S. General Services Administration (GSA) and Executive Order 13834 place priority on reducing water consumption. This priority has fueled interest in the identification, investigation, and potential broad deployment of cost-effective opportunities to reduce water use, such as alternative water treatment (AWT) technologies for cooling towers. Traditional water treatment approaches use chemicals to extend the ability of the water to hold scaling minerals in suspension, minimize corrosion, and prevent biological growth. This treatment protects the chillers and cooling tower equipment; however, even when chemicals are used regularly, a certain percentage of condenser water must be drained and made up with fresh water to maintain system water quality parameters. In addition, the use of chemicals sometimes creates a waste disposal issue and can cause building owners to incur additional fees, such as disposal or wastewater charges. To manage cooling tower water treatment, GSA typically contracts with a company specializing in conventional chemical maintenance for a fixed fee. While there are many types and vendors of AWT systems, this project assesses the effectiveness of one technology provided by Aqualogix. This system is a chilled water plant monitoring and control system aimed at optimizing system performance by reducing the blowdown occurrences used to remove mineral build-up. The technology consists of two components – continuous programmable logic control (PLC) monitoring and side-stream filtration with partial water softening. PLC monitoring calculates cycles of concentration (CoC) and determines the optimum amount of blowdown water required to satisfy all water chemistry requirements. Side-stream filtration removes suspended matter and improves biocide efficacy while precisely dispensing softened water to achieve optimal makeup water hardness. Unlike other AWT systems evaluated by GSA to date, this system does not replace the legacy treatment system but is used in addition to chemical water treatment. The vendor claims their technology will reduce water consumption, water discharge, and maintenance costs. The AWT system evaluated in this demonstration is a commercialized technology. Given its commercialized state, the system evaluated in this report is at a Technology Readiness Level 9 according to National Aeronautics and Space Administration (NASA) definitions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Use of Systems Engineering in Repurposing Coal-Fired Power Plants with Malta Pumped Thermal Energy Storage System

he electric sector across North America is facing a transition. Both economics and policy decisions have pointed towards a broad retirement of fossil assets across markets. Owners are facing the problem of how to evolve the base of the electric sector from fossil asset to greener alternative. Coal-fired power plants built the modern electricity grid. Their rotating machinery are the beating heart of the grid, providing essential resiliency and reliability services. Power plant retirements are disruptive to plant workforces and cause outsized impacts on surrounding communities. The transition from thermal power plants that use rotating machinery to generate electricity (e.g., coal- and gas-fired plants) to variable, inverter-based generation (e.g., solar and wind) is affecting the reliability of the electric grid. Grid operators and national regulators have issued warnings about known and anticipated risk. In 2021, Malta Inc. was awarded a Department of Energy (DOE) grant to study how to integrate a Malta 100MW Pumped Heat Energy Storage (PHES) system with a retiring coal-fired power plant to meet emissions requirements, retain plant workforces, preserve communities, and maintain grid reliability. This presentation provides a summary of this study, focusing on how systems engineering approach was used to arrive at a proposed design concept that met multiple objectives and requirements. There will be three main parts for this presentation. The first part of the presentation will focus on how different systems engineering was applied for this work. In particular, the following areas: stakeholder engagement, site selection process, developing requirements and use cases for the integrated system, defining the system and its boundary, coming up with different system architecture/option, performing a techno-economic analysis to compare the different options and down selection of the preferred option, will be discusses. For these areas, discussion on the decisions on how much breadth and depth to go into each area will be provided. These discussions provide good insights into how to apply systems engineering. The second part of the presentation will provide a deeper dive into the two recommended integration options that repurpose coal-fired power plants with Malta PHES system. The comparison of the two options and general guidance of how to choose an option will be provided. This is particularly useful for utilities who are facing coal-plant retirements. The two options will be compared based on its performance (such as power output, efficiency), complexity, and cost. The social impact on local communities of the two options will also be discussed. The final part of the presentation will discuss the impact that this work has had, including Malta Inc. being invited to the White House to discuss progress and outcomes of this work with the Interagency Working Group on Coal and Power Plant Communities and Economic Revitalization. In summary, this presentation aims to provide a showcase of how sy

25 ENERGY STORAGE↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities (Revision 1)

This project will demonstrate a multi-hazard time-dependent probabilistic risk assessment (PRA) approach for nuclear facilities considering aging-related deterioration of structures. A generic pressurized water reactor (PWR) reactor subjected to seismic mainshock-aftershock sequences considering the aging of the containment structure will be used as a case study to demonstrate the multi-hazard PRA approach. Using advanced modeling and simulation, seismic mainshock-aftershock fragility functions will be simulated for the containment structure considering aging effects. A multi-hazard PRA model for a generic PWR reactor will be built to quantify the multi-hazard core damage frequency (CDF) and large early release frequency (LERF) with explicit time-dependent modeling of event sequences. To date, the cascading impacts of multi-hazards are not adequately accounted for in the PRA models for nuclear facilities. In addition, for both initial and periodic evaluation of facilities to withstand natural phenomena hazards (NPH), deterioration of the SSCs due to aging and other effects is not adequately considered. By advancing multi-hazard considerations accounting for aging effects, this project will contribute to improved understanding of the safety of aging nuclear facilities. Project outcomes such as the multi-hazard CDF and LERF will also allow facility owners to optimize upgrade and retrofit protocols. This project is divided into two components: (1) advanced modeling and simulations; and (2) multi-hazard PRA. For the first component, Idaho National Laboratory’s (INL) Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) and BlackBear codes will be used to simulate the seismic response and damage of a containment structure under cascading mainshock-aftershock sequences with aging effects. Uncertainties related to the seismic inputs, material parameters, and environmental factors such as temperature and humidity will be identified and propagated to the fragility functions. These fragility functions, which consider aging effects, will be time dependent. The second component will take the fragility information from the first component to build a multi-hazard time-dependent PRA model starting from a generic PWR model to evaluate the multi-hazard CDF and LERF and characterize the associated consequences. For this component, OpenPRA Web Application and SAPHIRE code will be used. Events such as the Fukushima Daiichi accident have highlighted the importance of considering the cascading impacts of multi-hazards for PRA. Moreover, many of the reactors in the current nuclear fleet in the United States (US) are already operating well beyond their initially planned design life, and applications for further extensions to operating licenses are being considered. Therefore, considering multi-hazard effects and aging deterioration in the NPH risk assessment process will contribute to the safety of both existing and future nuclear facilities. Outcomes of this project will thus directly benefit the standards DOE-STD-1020-16 and DOE-HDBK-1224-18.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Precursor Analysis Report: SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003

The SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003 Precursor Analysis Report leverages publicly available information about Davis-Besse’s 2003 cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. On 25 January 2003, the SQL Slammer worm infected more than 90% of vulnerable hosts and crashed the internet in 10 to 15 minutes, making it one of the fastest spreading worms in history. SQL Slammer is a fileless, memory-resident worm that remotely exploits a stack-based buffer overflow vulnerability on local hosts to intensively scan and rapidly self-propagate across the internet. The worm infected approximately 300,000 unpatched hosts running Microsoft Structured Query Language (SQL) Server 2000 or Microsoft Desktop Engine (MSDE) 2000 with SQL Server Resolution Service. The SQL Slammer worm indirectly infected FirstEnergy’s Davis-Besse nuclear power plant by first infecting a consultant’s company network server and then propagating through an external misconfigured connection into Davis-Besse’s site network. The infection caused major network congestion, slow performance, data overloads, and the inability of local hosts to communicate with each other, which eventually caused a loss of availability and a loss of view when the Safety Parameter Display System (SPDS) and Plant Process Computer (PPC) crashed. At the time of the infection, the plant was already offline, the digital monitoring systems had redundant analog backups, and the plant control and safety functions were not affected, so there were no concerns of a safety breach. However, this incident resulted in many lessons learned and spawned important discussions about cybersecurity’s role in nuclear safety and electric power reliability regulation, policy, and guidance. Researchers and analysts identified 10 unique techniques utilized during the attack with a total of 640 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Eight of the identified techniques used during Davis-Besse cyber attack were precursors to the triggering event. Analysis identified 596 observables associated with these precursor techniques, 428 of which were assessed to have an increased likelihood of being perceived in the 331 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Oak Ridge National Laboratory EPA Approval Letters and Historical Documentation for a Modification in Applying 40 CFR Part 61 Appendix D

Appendix D of Title 40 Part 61, “Methods for Estimating Radionuclide Emissions,” of the Code of Federal Regulations (CFR) provides a procedure that US Department of Energy (DOE) facility owners and operators can use to estimate radionuclide emissions to the atmosphere for dose calculations instead of measuring emissions for minor sources under 40 CFR Part 61, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.” The procedure assumes that any radioactive material heated above 100°C is completely vaporized and emitted to the atmosphere. In 1991, the DOE Oak Ridge Reservation (DOE-ORR) requested approval to use different release fractions (RFs) for uranium because of its high melting and boiling points (1,132°C and 3,818°C, respectively). In response to the request, Environmental Protection Agency (EPA) Region IV approved the use of modified RFs for elemental uranium provided no reaction had taken place to alter its chemical form. In 2015, DOE-ORR requested approval to use different RFs for radioactive tungsten, also because of its high melting and boiling points (3,410°C and 5,660°C, respectively). EPA Region IV approved the use of modified RFs for heated radioactive tungsten metal. In accordance with the two precedents set for heating uranium and radioactive tungsten metals, in 2016, DOE-ORR requested approval to use modified RFs in similar fashion for other radioactive solid metals and compounds with melting and boiling points above 500°C that might be heated above 100°C in future research projects and experiments, and again, the EPA Region IV granted approval to use modified RFs for the list of compounds. This document contains the EPA approval letters and historical documentation used in the process to obtain approval for the use of alternative Appendix D emission factors. The approval to DOE-ORR allows modifying the existing regulatory RFs to 1 when radioactive solid metals and compounds are heated to temperatures greater than or equal to the boiling point of the solid, to 10 -3 when radioactive solid metals and compounds are heated to temperatures greater than or equal to 90% of the melting point and less than the boiling point of the solid, and to 10 -6 when radioactive solid materials are heated to temperatures above ambient air temperature but below 90% of the melting point of the solid.

54 ENVIRONMENTAL SCIENCES↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Data-Driven Day-Ahead PV Estimation Using Autoencoder-LSTM and Persistence Model

Inherent variability in photovoltaic (PV) and associated impacts on power systems is a challenging problem for both the PV owners and the grid operators. Existing statistical and machine learning algorithms typically work well for weather conditions similar to historical data. Furthermore, uncertain weather conditions pose a great challenge to the estimation accuracy of the estimation models. With the enhanced integration of intelligent electronic devices and the realization of associated automation in the power grid, renewable energy data is becoming more accessible, which can be utilized by deep learning models and improve the PV power generation estimation accuracy. In this paper, a hybrid deep learning model driven by external weather data is proposed to do day-ahead PV output forecasting at 15-minute-interval. The proposed model is motivated by the recent advancement of Long-Short-Term-Memory (LSTM) networks and AutoEncoder (AE), which estimates uncertainties in sequence while making the prediction for complex weather conditions. Meanwhile, the persistence model (PM) is used to predict continuous sunny weather conditions. The forecasting result is validated with data from multiple locations

42 ENGINEERING↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Case Study: Integrate Nuclear Water Desalination - Regional Potable Water in Arizona

The present study analyzes the economic viability of an Integrated Energy System (IES) that couples a Reverse Osmosis (RO) water desalination facility with a Nuclear Power Plant (NPP). The case study is conducted in collaboration with Arizona Public Service (APS), the operating owner of the Palo Verde Generating Station (PVGS) NPP. Cooling water for the reactor steam cycle is derived from treated effluent from municipal wastewater treatment plants. APS has established a long-term water resources program to effect a substantial reduction in plant cooling costs through advanced treatment and cooling technologies, and through the use of alternative water sources to replace the increasingly expensive effluent. One possible option is to replace some amount of the annual volume of effluent with brackish groundwater from a local regional aquifer. Although much less expensive than the municipal effluent, the quantity of brackish groundwater that could be used for plant cooling is limited as a result of the salinity and its impact on plant operation. Consequently, supplemental treatment could be required such that a greater amount of brackish groundwater could be used to reduce the demand on effluent. A study was conducted in 2018 by Idaho National Laboratory (INL) to investigate the economics of a PVGS onsite RO desalination plant that would reduce the salinity of a municipal effluent and brackish water blend to an acceptable level. One of the main findings of that study was that the overall economics of water desalination can be greatly improved if, in addition to cooling water for PVGS, potable water could also be produced and sold for profit. In fact, the study concluded that only producing cooling water for PVGS via RO desalination is not economically viable. The present report investigates the economic impact of a large, regional RO desalination plant that could provide potable water for the region, considering the conclusions from the 2018 scoping study. The study looks in particular at the water-market situation for the developing municipalities in the west valley of Phoenix. In addition to providing potable water for the municipalities, the existing infrastructure that conveys effluent to the Palo Verde plant and onsite water treatment facilities could be used to manage the RO concentrate. The processed concentrate could lead to a cost reduction in plant cooling by replacing some amount of effluent. The analysis reported here considers two cases (for various scenarios). First, the Base Case considers that neither the regional nor the onsite RO is built. The 2018 INL study showed that some brackish water can be blended with the municipal effluent water without having to build the onsite RO. That correspond to the maximum economically profitable option. The Base Case is where APS pumps the maximum volume of less-expensive brackish water (limited by water chemistry in the circulating water system), i.e. the case for which cooling water acquisition and treatment cost are lowest (without RO). Second, the proposed RO Case includes two RO plants, one onsite at PVGS and another larger, regional RO plant close to the brackish water wells. The regional RO produces potable water that is sold to the regional municipalities, while the PVGS onsite RO treats (part of) the regional ROs' concentrate and brackish water blend. The desalinated water from the PVGS RO is used in the circulating water system at PVGS. The analysis evaluates the difference in economics, using the Net Present Value (NPV) and Internal Rate of Return (IRR), between the cases. By comparing the two cases, in addition to evaluating the economics of the regional RO, we can also assess the impact of the regional RO on PVGS operational costs and, consequently, APS economics. The study shows that there exist combinations of regional RO and PVGS RO sizes for which the total blowdown and water chemistry limits at PVGS (including regional RO concentrate treatment at PVGS) are satisfied. However, such combinations only exist if no additional brackish water is directly mixed in the tertiary water system at PVGS. This leads to higher Levelized Costs of Potable Water (LCOPW) compared to cases where additional brackish water is injected (but violate the physical constraints). Additional studies are suggested to investigate the benefit of additional brackish water injection (lowers cooling water cost) versus the cost of lifting the physical constraints, e.g. building additional evaporation ponds. Staying in the case of no additional brackish water and satisfying the existing PVGS constraints, the lowest LCOPW (~0.5 $/m 3 ) can be achieved with a size of the regional RO of ~1.4e7 m 3 /yr (11000 AF/yr) capacity, which leads to ~8.63e6 m 3 /yr (7000 AF/yr) of potable water while no onsite RO at PVGS is built. Considering the vii residential water demand model developed for the Phoenix west valley, the NPV for this regional RO would be ~$100 million if all municipalities in the vicinity participate from the beginning of the project.

97 MATHEMATICS AND COMPUTING↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Wind Energy Instrumentation Atlas

The US Department of Energy (DOE) A2e program is focused on developing the next generation of predictive tools to better understand wind plant performance and help industry lower the overall cost of energy. A formal verification and validation process is required to demonstrate improved accuracy of these new models beyond those currently employed. And a critical part of model validation is utilization of a diverse set of accurate observations of atmospheric forcing and wind plant response. A number of existing data sets that will be used for this purpose, as highlighted by Schreck and Maniaci (2017) but A2e researchers also realize that new datasets will be required to meet validation objectives. As such, plans for new experiments based on model validation priorities (NALU validation plan, 2017) are currently being developed. This document is intended to serve as a reference to experimental study planners that describes the capability, accuracy and resolution of existing and developing measurement technologies to observe quantities of interest for wind plant model validation. Such systems can be broken into two major categories: those that measure the flow field and surrounding atmosphere around and within a wind plant and those that measure the turbine response within the wind plant. The A2e validation team will use this catalogue of instrument capability in conjunction with the validation plan, to choose the optimal set of instruments to be deployed, inform instrument placement and operation and estimate the types of validation that may be gathered through new field campaigns. Where existing instrumentation is deficient, the document will also help guide DOE towards potential areas where instrumentation development is required to meet validation objectives and A2e technology development funding may be required. The domain of interest is the wind plant microscale, within and surrounding a single wind plant, typically, tens of kilometers on a side in horizontal directions and to the top of the atmospheric boundary layer (about 1km) in the vertical. Some observations of dominant mesoscale forcing phenomena are required, with the highest resolution measurements occurring in the wind turbine wakes and on the turbines themselves. The simulation tools to be validated are mesoscale driven large-eddy simulations of the atmosphere with full aeroelastic response of individual turbines within the plant. Use cases vary slightly among tool users, but should focus on the primary end customers of the simulations and research insights, which would be turbine manufacturers, wind plant developers and owners. Broadly speaking their interests are maximizing energy output, while maintaining turbine reliability and lifetime.

17 WIND ENERGY↗

WHONDRS River Corridor Sediment and Water Geochemistry and In Situ Sensor Data from Machine-Learning-Informed Sites across the Contiguous United States (v6)

This dataset supports a broader study examining hyporheic zone respiration rates to improve predictive models at a contiguous United States (CONUS) scale. The CONUS-Scale Model-Sample Study (CM) was designed following ICON (integrated, coordinated, open, and networked) principles to facilitate a model-experiment (ModEx) iteration approach, leveraging crowdsourced sampling across the CONUS. New machine learning models were created every month to guide sampling locations. Data from the resulting samples were used to test and rebuild the machine learning models for the next round of sampling guidance. Sampling began in April 2022 and ended in October 2023. In addition to the widely distributed CONUS sites, a more spatially focused sampling occurred in the Yakima River Basin, WA in summer 2022. Data from this more spatially intensive sampling occurred under the label “Second Spatial Study (SSS)” and were also included in the machine learning models. Other data types collected from SSS that were not part of CM were published in a separate data package (https://data.ess-dive.lbl.gov/view/doi:10.15485/1969566). This data package was originally published in February 2023. It was updated in June 2023 (v2; new and modified files); December 2023 (v3; new and modified files); June 2024 (v4; new and modified files); April 2024 (v5; new and modified files); and September 2025 (v6; modified files). See the change history section in the readme for more details. For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. This dataset is comprised of two folders of field photos and videos, one folder of raw Fourier transform ion cyclotron resonance mass spectrometry (FTICR-MS) data and one main data folder containing (1) file-level metadata; (2) data dictionary; (3) field metadata; (4) readme; (5) international generic sample number (IGSN) mapping file; (6) field protocols; (7) a subfolder with sample data; and (8) a subfolder with sensor data. The sample data subfolder contains (1) surface water and sediment dissolved organic carbon (DOC, measured as non-purgeable organic carbon, NPOC) data and averages; (2) surface water and sediment total nitrogen data and averages; (3) surface water major cations and anions and averages; (4) sediment grain size data; (5) sediment iron (II) data and averages; (6) wet sediment mass, dry sediment mass, water mass, and wet sediment volume in incubation and sediment ICR vials; (7) sediment incubation respiration rate data and averages; (8) normalized respiration rate data and averages; (9) methods codes; (10) sediment specific surface area; (11) sediment percent carbon and nitrogen; (12) sediment gravimetric moisture and averages; (15) sediment X-ray diffraction (XRD) data; (16) sediment adenosine triphosphate (ATP) and averages; (17) a subfolder with sediment incubation respiration data, scripts, and plots; (18) surface water and sediment FTICR methods; and (19) a subfolder of 9.4 Tesla (9.4T) FTICR-MS data. This folder contains five subfolders, one containing the sediment .xml data files, one containing the water .xml files, one containing the sediment CoreMS output files, one containing the water CoreMS output files, and the other containing instructions and scripts for processing the files in CoreMS (https://github.com/EMSL-Computing/CoreMS).The sensor data subfolder contains (1) a subfolder with miniDOT dissolved oxygen and temperature data and plots; (2) miniDOT dissolved oxygen and temperature summary data; and (3) miniDOT installation methods. All files are .csv, .pdf, .R, .xml, .d, .html, .Rmd, .py, .cal, .json, .jpg, .jpeg, .png, .mov, or .mp4. CORRECTION: Carbon and nitrogen content are reported as percentages. The current column headers "01395_C_percent_per_mg" and "01397_N_percent_per_mg" are incorrect. These should read "01395_C_percent" and "01397_N_percent" and will be corrected in the next version of this data package. We thank the United States Forest Service, Washington Department of Fish and Wildlife, Washington Department of Natural Resources, Cowiche Canyon Conservatory, Washington State Parks and Recreation Commission (Scientific Research Permit #210901), and the Confederated Tribes and Bands of the Yakama Nation for access to field locations where the samples labeled “SSS” were collected. We also thank the Yakama Nation Tribal Council and Yakama Nation Fisheries for working with us to facilitate sample collection and optimization of data usage according to their values and worldview. WHONDRS consortium members were asked to provide any acknowledgments for the collection of samples labeled “CM” and the following is a list of acknowledgments that were submitted with their corresponding Site IDs: (MART) Research activities were conducted in part on the Wind River Experimental Forest within the Gifford Pinchot National Forest; (MP- 100379) Philadelphia is part of Lenapehoking, the ancestral homelands of the Lenape peoples; (MP-102398) Land surveyed is the ancestral homelands of the Nookhose'iinenno (Arapaho), Tsis tsis'tas (Cheyenne), and Nuuchu (Ute); (MP-100749 and MP- 100747) Georgia Coastal Ecosystem LTER, OCE-1832178; (SP-70 and SP-72) Eastern Shoshone, Shoshone-Bannock; (MP- 102944) Funded by Oregon Watershed Enhancement Board. On the traditional lands of the Confederated Tribes of the Siletz, Confederated Tribes of the Grand Rhonde, and the Clatsop-Nehalem Confederated Tribe; (MP- 100607) Holiday Creek is located on the traditional territory of the Monacan Indian Nation; (SP-45) Lafayette Blue Springs State Park; (MP-102420) NSF DEB-2016749; (MP-100019) New Hampshire Agriculture Experiment Station; (SP-35) Rayonier (land owner; https://www.rayonier.com/); (MP- 101276) US Department of Energy, Office of Science, Biological and Environmental Research, Subsurface Biogeochemical Research, Watershed Dynamics and Evolution SFA at ORNL; (MP- 103224) Watershed Dynamics and Evolution SFA at ORNL; (MP- 101584) Traditional lands of the Oceti Sakowin (Dakota, Lakota, Nakoda) and Anishinaabe Peoples.

54 ENVIRONMENTAL SCIENCES↗