Search NASA⌕ Search

SEARCH · Search NASA

Results for “Proton acceleration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

European Contributions to Fermilab Accelerator Upgrades and Facilities for the DUNE Experiment

The Proton Improvement Plan (PIP-II) to the FNAL accelerator chain and the Long-Baseline Neutrino Facility (LBNF) will provide the world's most intense neutrino beam to the Deep Underground Neutrino Experiment (DUNE) enabling a wide-ranging physics program. This document outlines the significant contributions made by European national laboratories and institutes towards realizing the first phase of the project with a 1.2 MW neutrino beam. Construction of this first phase is well underway. For DUNE Phase II, this will be closely followed by an upgrade of the beam power to > 2 MW, for which the European groups again have a key role and which will require the continued support of the European community for machine aspects of neutrino physics. Beyond the neutrino beam aspects, LBNF is also responsible for providing unique infrastructure to install and operate the DUNE neutrino detectors at FNAL and at the Sanford Underground Research Facility (SURF). The cryostats for the first two Liquid Argon Time Projection Chamber detector modules at SURF, a contribution of CERN to LBNF, are central to the success of the ongoing execution of DUNE Phase I. Likewise, successful and timely procurement of cryostats for two additional detector modules at SURF will be critical to the success of DUNE Phase II and the overall physics program. The DUNE Collaboration is submitting four main contributions to the 2026 Update of the European Strategy for Particle Physics process. This paper is being submitted to the 'Accelerator technologies' and 'Projects and Large Experiments' streams. Additional inputs related to the DUNE science program, DUNE detector technologies and R&D, and DUNE software and computing, are also being submitted to other streams.

43 PARTICLE ACCELERATORS↗

The Highest Energy HAWC Sources are Likely Leptonic and Powered by Pulsars

The HAWC Collaboration has observed gamma rays at energies above 56 TeV from a collection of nine sources. It has been suggested that this emission could be hadronic in nature, requiring that these systems accelerate cosmic-ray protons or nuclei up to PeV-scale energies. In this paper, we instead show that the spectra of these objects favor a leptonic (inverse Compton) origin for their emission. More specifically, the gamma-ray emission from these objects can be straightforwardly accommodated within a model in which $\sim \mathcal{O}(10\%)$ of the host pulsar's spindown power is transferred into the acceleration of electrons and positrons with a power-law spectrum that extends to several hundred TeV or higher. The spectral break that is observed among these sources is naturally explained within the context of this simple model, and occurs at the energy where the timescale for energy losses matches the age of the pulsar. In contrast, this spectral feature cannot be straightforwardly accommodated in hadronic scenarios. Furthermore, hadronic models predict that these sources should produce more emission at GeV-scale energies than is observed. In light of these considerations, we conclude that HAWC's highest energy sources should be interpreted as TeV halos or pulsar wind nebulae, which produce their emission through inverse Compton scattering, and are powered by the rotational kinetic energy of their host pulsar.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Commissioning of the IOTA Proton Injector

The IOTA Proton Injector (IPI) at the Fermilab Accelerator Science and Technology facility (FAST) is a machine capable of delivering up to 14 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. Its construction was completed in the fall of 2025, followed by a successful commissioning run scheduled to conclude at the end of May 2026. It operates alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the current operational profile, known challenges, and future plans for the proton program development at FAST.

Romanov, A. [Fermilab] (ORCID:0000000287065709)↗

Achievement in Beam Power Records for the NOvA Target System

We began updating the NOvA target system for 1-Mega Watt (1-MW) beam operation in 2017. Major changes include maintaining the quality of neutrino beams with reliable instrumentation, reducing instantaneous beam heating on the target, increasing cooling power to handle the high power beam, and controlling tritium water production rate. We successfully achieved a onehour beam power report of 1.018 MW in Summer 2024. This achievement marks an important milestone for Fermilab, demonstrating the capability of the accelerator complex to handle highintensity proton beams at a fast repetition rate. We are now prepared to proceed with a new accelerator upgrade plan, known as the Accelerator Complex Evolution - Main Injector Ramp and Targetry R&D (ACE-MIRT) to support future operates at beam power exceeding 2 MW for the Long Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE). We present the improvement of the target system to exceed the beam power 1-MW.

Yonehara, Katsuya [Fermilab] (ORCID:00000002544041↗

Simulation and measurement of the dynamic strain response in a prototypical spallation target

The Second Target Station (STS) at the Spallation Neutron Source (SNS) will address emerging scientific challenges by providing a source of intense cold neutrons to instruments optimized for this source. The STS target will use rotating tungsten blocks and will receive 1.3 GeV proton beam pulses from the SNS accelerator at a repetition rate of 15 Hz. The facility life is planned for 40 years, and each target assembly life is expected to be approximately 10 years. An accurate strain prediction is then critical for fatigue life assessment of STS target blocks because they will be subject to approximately 10 8 beam pulses per lifetime. As an R&D activity, the Los Alamos Neutron Science Center (LANSCE) Weapons Neutron Research (WNR) Target 2 (Blue Room) facility was used to test the strain response of prototypical target blocks to the thermal shock of a proton pulse. The blue room was well suited for a pulsed proton beam impact test of subscale STS target blocks; the 800 MeV proton energy is approximately 60 % of the 1.3 GeV proton energy expected from the SNS accelerator to the STS. The LANSCE Proton Storage Ring (PSR) and SNS are both short-pulse proton beam sources with nominal pulse widths of 250 ns and 661 ns, respectively, so the energy deposition in the target occurs in <1 μs pulse duration. Strain measurements on the outer surface of three target blocks (bare tungsten, tantalum-clad tungsten, niobium-clad tungsten) were recorded for comparison against neutronics and structural simulations. In conclusion, this experiment and the supporting simulations satisfied the following primary research goals for the STS target.

Dynamic strain response↗

Design of Ionization Profile Monitors at the Integrable Optics Test Accelerator Facility at Fermilab

The Integrable Optics Test Accelerator (IOTA) at Fermilab is transitioning from an electron beam facility to a proton beam facility for studies in nonlinear accelerator optics and space-charge dominated proton beams. This project involves the commissioning and fabrication of Ionization Profile Monitors (IPMs) to enable beam profile measurements at IOTA. In general, IPMs work on principle of residual gas ionization by the beam to generate beam profile. This work focuses on a mechanical design that leverages a controlled injection of noble gases, primarily Argon, as the ultra-high vacuum of the IOTA ring provides insufficient residual gas for ionization. Efforts to understand vacuum integration to ensure compatibility with the storage ring environment, the integration of real-time data acquisition systems and the commissioning of the IPMs will be discussed. This project provides a versatile diagnostic tool, supporting IOTA’s role as a testbed for larger-scale accelerator facilities and contributing to the broader understanding of beam physics in high-intensity, high-space-charge regimes.

Mwaniki, M. W. [IIT, Chicago] (ORCID:0000000169057↗

Second Target Station Project: LANSCE WNR Target 2 (Blue Room) Experiment 2022

The Second Target Station (STS) at SNS will address emerging scientific challenges by providing a source of intense, cold neutrons to instruments optimized for this source, using rotating, tungsten target blocks. The STS target will receive 1.3 GeV proton beam pulses from the SNS accelerator at a repetition rate of 15 Hz. The facility life is planned for 40 years, and each target assembly life is expected to be approximately 10 years. An accurate strain prediction is then critical for fatigue life assessment of STS target blocks because they will be subject to approximately 108 beam pulses per lifetime. As an R&D activity, the LANSCE WNR Target 2 (blue room) facility was used to test the strain response of prototypical target blocks to the thermal shock of a proton pulse. The blue room was well suited for a pulsed proton beam impact test of subscale STS target blocks; the 800 MeV proton energy is approximately 60% of the 1.3 GeV proton energy expected from the SNS accelerator to the STS. Both the LANSCE Proton Storage Ring (PSR) and SNS are short-pulse proton beam sources with nominal pulse widths of 250 ns and 661 ns, respectively, so the energy deposition in the target occurs in < 1 microsecond pulse duration.

43 PARTICLE ACCELERATORS↗

Rational design, synthesis, and evaluation of uncharged, “smart” bis-oxime antidotes of organophosphate-inhibited human acetylcholinesterase

Organophosphate (OP) intoxications from nerve agent and OP pesticide exposures are managed with pyridinium aldoxime–based therapies whose success rates are currently limited. The pyridinium cation hampers uptake of OPs into the central nervous system (CNS). Furthermore, it frequently binds to aromatic residues of OP-inhibited acetylcholinesterase (AChE) in orientations that are nonproductive for AChE reactivation, and the structural diversity of OPs impedes efficient reactivation. Improvements of OP antidotes need to include much better access of AChE reactivators to the CNS and optimized orientation of the antidotes' nucleophile within the AChE active-center gorge. On the basis of X-ray structures of a CNS-penetrating reactivator, monoxime RS194B, reversibly bound to native and venomous agent X (VX)–inhibited human AChE, here we created seven uncharged acetamido bis-oximes as candidate antidotes. Both oxime groups in these bis-oximes were attached to the same central, saturated heterocyclic core. Diverse protonation of the heterocyclic amines and oxime groups of the bis-oximes resulted in equilibration among up to 16 distinct ionization forms, including uncharged forms capable of diffusing into the CNS and multiple zwitterionic forms optimal for reactivation reactions. Conformationally diverse zwitterions that could act as structural antidote variants significantly improved in vitro reactivation of diverse OP-human AChE conjugates. Oxime group reorientation of one of the bis-oximes, forcing it to point into the active center for reactivation, was confirmed by X-ray structural analysis. Finally, our findings provide detailed structure-activity properties of several CNS-directed, uncharged aliphatic bis-oximes holding promise for use as protonation-dependent, conformationally adaptive, “smart” accelerated antidotes against OP toxicity.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

LAMP Emittance Budget, Rev. 1

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). This brief report summarizes the emittance budget for the LANSCE Modernization Project (LAMP). While the project Key Performance Parameters (KPPs) specify threshold and objective requirements for charge delivered to each experimental area, no upper limits on beam emittances are specified. To maintain low losses in the high-energy section of the LANSCE linac and hands-on maintenance, some upper limits on beam emittance need to be specified for the new LAMP front-end performance. The scope of the LAMP project replaces the injector section and drift-tube linac (DTL) up to 100 MeV of the existing LANSCE linac. This new design replacement will be integrated with the remaining coupled cavity linac (CCL) which makes up most of the accelerator at LANSCE and accelerates the beam to a final energy of 800 MeV. The initial approach that has been used to define an emittance budget for the new LAMP front end is based on recent and historical measured beam emittances at 100 MeV for the three beam types accelerated at LANSCE: H+ (protons for isotope production), LBEG (H- beam for delivery to proton radiography and to the Lujan neutron spallation target, and MPEG (H- beam for delivery to the Weapons Neutron Research facility). The emittance budget (upper limit) for each beam type has been selected to maintain the losses in the CCL to a level approximately equivalent to those observed in present operations to first order. However, the goal of the LAMP project is to improve the quality of the beams injected into the CCL, if possible, thus allowing for higher average current operation while also lowering beam losses and activation at high beam energies. The table below summarizes the beam measurements evaluated and used to establish a conservative emittance budget for LAMP based on known historical beam losses and activation. However, based on estimates of the CCL admittance and the Isotope Production Facility (IPF) beamline acceptance, a more relaxed transverse emittance upper limit of 0.095 π-cm-mrad, rms, normalized may be acceptable at 100 MeV while still meeting the LAMP performance requirements for charge delivery to each LANSCE experimental area and maintaining hands-on maintenance. This upper limit is supported by a recent analysis of operational data. Additionally, the present conceptual LAMP front-end design meets this requirement.

43 PARTICLE ACCELERATORS↗

Design of the Multi-Ion Injector Linac for the JLAB EIC (JLEIC)

An Electron Ion Collider (EIC) is the highest priority for future U.S. accelerator-based nuclear physics facility following the completion of the Facility for Rare Isotope Beams (FRIB). Two laboratories are competing to host the future EIC: Brookhaven National Lab. (BNL) and Jefferson Lab. (JLab). The baseline design of JLab's Electron Ion Collider (JLEIC) ion complex comprises a pulsed superconducting (SC) linac injector capable of accelerating all ions from protons to lead, where proton and light ion beams can be polarized. After reviewing the design requirements for the injector linac, important design choices such as the room-temperature (RT) section design, the transition energy between the RT and SC sections and the stripping energy for heavy ions will be discussed. The design of the different linac sections will be presented as well as the results of end-to-end beam dynamics simulations for polarized deuterons and unpolarized lead ions.

Mustapha, B.↗

Design and Development of the PIP-II Stripline Beam Position Monitor

• Designed a stripline Beam Position Monitor (BPM) for the PIP-II accelerator to ensure precise proton beam alignment under ultra-high vacuum (UHV) conditions • Developed a mechanically robust and manufacturable assembly, including a cylindrical housing, electrodes, flange interfaces, and internal supports • Achieved high safety margins under pressure loading, using finite element analysis (FEA), while

Avalos Angel, Alejandro [Northern Illinois U.]↗

Mitigation of space charge effects using electron column at IOTA ring

We investigate a novel method to mitigate space charge effects of high intensity proton beams propagating in circular accelerators by means of trapping and controlling electrons generated from beam-induced residual gas ionization. This compensation method uses Coulomb repulsion force between a proton beam and electrons to mitigate self-space charge effects of the beam if it passes through a plasma column. The transverse electron-proton (e-p) instability in the plasma column is well controlled by the longitudinal magnetic field of a solenoid magnet and the bias voltages on electrodes. In this report, we will show simulation results how to control distributions of electrons and ions as well as that of the proton beam inside the column.

43 PARTICLE ACCELERATORS↗

Design and optimization of the RF input-coupler for a low-frequency, split-coaxial RFQ

The Isotope Decay-At-Rest experiment (IsoDAR) is a proposed underground experiment which is expected to be a definitive search for sterile neutrinos. In order to be decisive within 5 years, high rates of neutrinos must be produced, by impinging a 10 mA continuous wave proton beam at 60 MeV on a high power target. Due to space restrictions, a compact cyclotron was chosen as an accelerator to produce this driver beam. To overcome space charge limitations during injection, H 2 + ions are accelerated and later stripped into protons by means of a carbon foil. IsoDAR uses an especially designed low-frequency (32.8 MHz) split-coaxial Radio-Frequency Quadrupole (RFQ) to effectively bunch H 2 + ions before injecting them into this cyclotron. The RFQ will be embedded vertically in the cyclotron yoke, facilitating a very compact design. This puts stringent limits on RFQ size, type, and accessibility. Here, we present the design and optimization of the low-frequency (32.8 MHz) RF input-coupler for the IsoDAR RFQ. The design is challenging due to the necessarily small diameter of the RFQ (28 cm) and the split-coaxial type, as well as limited access to the RFQ. We have determined the optimal position and shape for the coupler, leading to a low power consumption of < 6 kW for an inter-vane voltage of 22 kV. Finally, the highest calculated fields are safely below the Kilpatrick limit for this structure.

43 PARTICLE ACCELERATORS↗

Combined Function Magnets for the Fermilab PIP-II Booster Upgrade

The Proton Improvement Plan II (PIP-II) is an enhancement to the Fermilab accelerator complex enabling a high intensity proton beam to support the laboratory’s experiments. The heart of PIP-II is a superconducting linac which will increase the injection energy in the booster from the existing 400 MeV to 800 MeV. To make room for the modified injection into the booster, two shorter defocusing gradient magnets have been designed. Two wide aperture defocusing gradient magnets have also been designed to go on either side of the extraction septa to reduce extractions losses.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cross-correlation of the extragalactic gamma-ray background with the thermal Sunyaev-Zel’dovich effect in the cosmic microwave background

Cosmic rays in galaxy clusters are unique probes of energetic processes operating with large-scale structures in the Universe. Precise measurements of cosmic rays in galaxy clusters are essential for improving our understanding of nonthermal components in the intracluster medium (ICM) as well as the accuracy of cluster mass estimates in cosmological analyses. In this paper, we perform a cross-correlation analysis with the extragalactic gamma-ray background and the thermal Sunyaev-Zeldovich (tSZ) effect in the cosmic microwave background. The expected cross-correlation signal would contain rich information about the cosmic-ray-induced gamma-ray emission in the most massive galaxy clusters at $\textit{z}$ ~ 0.1 – 0.2 . We analyze the gamma-ray background map with 8 years of data taken by the Large Area Telescope onboard Fermi satellite and the publicly available tSZ map by Planck. We confirm that the measured cross-correlation is consistent with a null detection, and thus it enables us to put the tightest constraint on the acceleration efficiency of cosmic-ray protons at shocks in and around galaxy clusters. In this work, we find the acceleration efficiency must be below 5% with a 2σ confidence level when the hydrostatic mass bias of clusters is assumed to be 30%, and our result is not significantly affected by the assumed value of the hydrostatic mass bias. Our constraint implies that the nonthermal cosmic-ray pressure in the ICM can introduce only a≲3% level of the hydrostatic mass bias, highlighting that cosmic rays alone do not account for the mass bias inferred by the Planck analyses. Finally, we discuss future detectability prospects of cosmic-ray-induced gamma rays from the Perseus cluster for the Cherenkov Telescope Array.

79 ASTRONOMY AND ASTROPHYSICS↗

Mitigation of Beam Losses in LANSCE Linear Accelerator

Suppression of beam losses is essential for successful operation of high-intensity accelerator facility. The LANSCE accelerator started routine operation in 1972 as a 0.8 MW average proton beam power facility for meson physics research, and delivered highpower beam for a quarter century. The accelerator currently delivers 100 MeV proton beam to Isotope Production Facility (IPF) and 800 MeV H- beams to various experimental areas. The accelerator is equipped with two independent injectors for H + and H - beams, merging at the entrance of a 201.25 MHz Drift Tube Linac (DTL). The DTL performs acceleration up to the energy of 100 MeV. After the DTL, the Transition Region beamline directs a 100 MeV proton beam to the Isotope Production Facility, while the H - beam is accelerated up to the final energy of 800 MeV in an 805- MHz Coupled Cavity Linac. The H - beams, created with different time structure by a lowenergy chopper, are distributed in the Switch Yard (SY) to four experimental areas: the Lujan Neutron Scattering Center equipped with a Proton Storage Ring (PSR), the Weapons Neutron Research facility (WNR), the Proton Radiography facility (pRad), and the Ultra-Cold Neutron facility (UCN). Multi-beam operation requires careful control of accelerator tune to minimize beam losses. In this paper we review main effects affecting beam losses in LANSCE linear accelerator and discuss methods to reduce them.

43 PARTICLE ACCELERATORS↗

Modeling Ring Current Proton Fluxes Using Artificial Neural Network and Van Allen Probe Measurements

Abstract Terrestrial ring current dynamics are a critical part of the near‐space environment, in that they directly drive geomagnetic field variations that control particle drifts, and define geomagnetic storms. The present study aims to specify a global and time‐varying distribution of ring current proton using geomagnetic indices and solar wind parameters with their history as input. We train an artificial neural network (ANN) model to reproduce proton fluxes measured by the Radiation Belt Storm Probes Ion Composition Experiment instrument onboard Van Allen Probes. By choosing optimal feature parameters and their history length, the model results show a high correlation and a small error between model specifications and satellite measurements. The modeled results well capture energy‐dependent proton dynamics in association with geomagnetic storms, including inward radial diffusion, acceleration and decay. Our ANN model produces proton fluxes with their corresponding 3D spatiotemporal variations, capturing the latitudinal distribution and local time asymmetry that are consistent with observations and that can further inform theory.

Li, Jinxing↗

Novel indium phosphide charged particle detector characterization with a 120 GeV proton beam

Thin film detectors which incorporate semiconductor materials other than silicon have the potential to build upon their unique material properties and offer advantages such as faster response times, operation at room temperature, and radiation hardness. To explore the possibility, promising candidate materials were selected, and particle tracking detectors were fabricated. An indium phosphide detector with a metal-intrinsic-metal structure has been fabricated for particle tracking. The detector was tested using radioactive sources and a high energy proton beam at Fermi National Accelerator Laboratory. In addition to its simplistic design and fabrication process, the indium phosphide particle detector showed a very fast response time of hundreds of picoseconds for the 120 GeV protons, which are comparable to the ultra-fast silicon detectors. This fast-timing response is attributed to the high electron mobility of indium phosphide. Such material properties can be leveraged to build novel detectors with superlative performance.

47 OTHER INSTRUMENTATION↗